ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install a roof/sump pump drain within the county right of way with the following conditions: the roof/sump pump drain will be connected into the county storm drain structure or pipe as directed by the dps inspector. Date: November 26, 2002Permit type: Public right of way | Permit status: Finaled | Current use: Public right-of-way | Permit id: 219618 |