ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Enlarge existing overhead door to x opening, add new man door at same elevation, add another man door at se corner of building. No occupancy provided under this permit Date: November 5, 2014Permit type: Application | Permit status: Approved | Completion date: June 6, 2014 | Permit id: 2014-166291-000 | |||||
Interior tenant improvement for new brewery; removal of walls and bathroom; new build out to include two new restrooms, tasting area, break room, and barrel room; walk in cooler under separate permit. Dfs reqd for tanks. See comments Date: January 27, 2015Permit type: Application | Permit status: Approved | Completion date: July 11, 2014 | Permit id: 2014-182641-000 | |||||
Revision to change type and location of sampling vault Date: May 7, 2015Permit type: Application | Permit status: Approved | Completion date: May 7, 2015 | Permit id: 2014-182641-Rev | |||||
Approval of design review for exterior alterations to an existing warehouse building in the central eastside subdistrict of the central city plan district that include the following: two new glazed and solid steel overhead doors in two openings on the west faade with one opening enlarged from 8x8 to 10x10; new concrete access ramp and two new glazed metal doors on the west faade; two new gooseneck style light fixtures on the west faade; one new glazed metal door in a new opening on the south faade; concrete walkway from the new south faade door to the sidewalk; and one new gooseneck style light fixture on the west faade. Approval, per the approved site plans, exhibits c-1 through c-5, signed and dated october 7, 2014, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 5. The sheets Date: October 8, 2014Permit type: Land use review | Permit status: Completed | Completion date: July 21, 2014 | Permit id: 2014-186051-000 | |||||
Change low pressure gas to high pressure install new gas line to new tankless water heater, existing gas pack and existing boiler boiler Date: December 29, 2015Permit type: Intake | Permit status: Closed | Completion date: December 29, 2015 | Permit id: 2015-282562-000 | |||||
Enlarge existing overhead door to x opening, add new man door at same elevation, add another man door at se corner of building. +++no occupancy provided under this permit+++ Date: November 5, 2014Permit type: Application | Permit status: Approved | Completion date: June 6, 2014 | Permit id: 2014-166291-000 | |||||
Plumb mens and womens bathroom, 2 floor drains, 2 trough drains, 1 mop sink, 2 floor sinks, and 3 sinks, 1 dishwasher Date: February 12, 2015Permit type: Environmental services | Permit status: Not reqd | Completion date: November 13, 2015 | Permit id: 2015-118830-000 | |||||
Legalize existing demising wall for 2nd tenant space - 21 sf; add a bathroom; space b for use as office and storage Date: March 31, 2011Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: May 20, 2011 | Current use: Business | Permit id: 2011-123725-000 |