ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Roof mount residential solar pv for existing sfd with existing residential main electrical service the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 06-06-2016 scope change to remove 200a msp upgrade already done under a separate permit. See pc set of plans. Maz Date: March 11, 2016 Contractor: Solarcity CorporationPermit type: Residential alteration-addn | Permit status: Completed | Completion date: June 27, 2016 | Permit id: Pds2016-Resalt- | |||||
Upgrade electrical panel from 1 amps to 2 amps Date: May 19, 2016Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 27, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: June 23, 2016Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Upgrade electrical panel from 1 amps to 2 amps Date: May 19, 2016Permit type: Electrical only | Permit status: Completed | Permit id: Pds2016-Resalt- | Parcel: 1052640300 | |||||
SCORE 95 Roof mount residential solar pv for existing sfd with existing residential main electrical service the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 06-06-2016 scope change to remove 200a msp upgrade already done under a separate permit. See pc set of plans. Maz Date: March 11, 2016 Contractor: Solarcity CorporationPermit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2016-Resalt- |