ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 Update service. 200a to stay 200a. Currently a ct metered service. Supplying a new meter and mast with feed through 200a meter. Date: July 30, 2015 Contractor: Sunergy Systems IncPermit type: Electrical | Permit status: Permit closed | Completion date: August 5, 2015 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487152 | |||||
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, 5200watt ac output interactive inverter, 30a backfeed breaker in 200a main panel Date: July 30, 2015 Contractor: Sunergy Systems IncPermit type: Electrical | Permit status: Permit closed | Completion date: August 5, 2015 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487149 | |||||
SCORE 93 Rewire master bedroom and master bathroom addition. Date: August 27, 2002 Contractor: Bribec ElectricPermit type: Electrical | Permit status: Permit finaled | Completion date: November 25, 2002 | Expiration date: August 27, 2003 | Current use: Single family / duplex | Permit id: 6002983 |