ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: February 13, 2001Permit status: Issued | Current use: Single family dwelling | Permit id: 240607 | |||||
Demo sfd at 123 west old baltimore rd boyds, md 20841 Permit type: Demolition or move permit | Permit status: Open | Current use: Single family dwelling | Permit id: 771481 | |||||
Pre-construction meeting required contact mc. Dps inspector chris smith @ 301-370-3691 replace existing 40-foot pole with new 45-foot pole. Prior to release of this permit, complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Disturbed areas shall be fine graded & sodded. Roadways shall be kept free of mud & debris. Materials & equipment shall not be stored in right-of-way. Notify mc. Dps inspector when work is complete utility representative: bart herman @ #4a01912 Date: June 30, 2005Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 237266 | |||||
Drill and excavate 22test pits within the county right of way. Pre-construction meeting required. Contact mc dps inspectorchris smith@ 301-370-3691. Work shall comply with the current montgomery county specifications for utility construction permit and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Restoration shall be completed as directed by the dps inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work.
|