New bms system for hvac system Date: February 17, 2015Permit type: Intake | Permit status: Closed | Completion date: February 17, 2015 | Permit id: 2015-120271-000 | |||||
Sani conn: 204 of 8 csp sanitary sewer main in public easement from ne 1st ave. Contractor to tap manhole (abg585) and build new 8 branch to property. Manhole approx 7. 7deep. Contr to verify depth/location/proper slope in the field. Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-134815-000 | |||||
1of2 storm conn: 137 of vsp storm sewer main in public easement from ne 1st ave. Contractor to tap manhole (abg579) and build new 6 branch to property. Manhole approx. 15 deep. Contr to verify depth/location/proper slope in the field. Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-134837-000 | |||||
2of2 storm conn: 254 of vsp storm sewer main in public easement from ne 1st ave. Contractor to tap main & install deep connection riser & build new 6 branch to property. Mainline approx. 15 deep. Contr to verify depth/location/proper slope in the field. Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-134845-000 | |||||
Install storm sewer for commercial bulding, extension at legacy holladay park - 1,964 storm sewer and (9) catch basins Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-134851-000 | |||||
Install sanitary sewer for commercial building, extension at legacy holladay park - 225 of sanitary sewer. Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-134857-000 | |||||
B2/ install evaporator coil and condensing unit on w/i cooler Date: August 6, 2014Permit type: Intake | Permit status: Closed | Completion date: June 14, 2013 | Permit id: 2013-168267-000 | |||||
2-story addition to existing lab building, small renovations on basement, first and second floors of existing building, and all site work. Date: August 27, 2014Permit type: Application | Permit status: Approved w/ cond | Completion date: June 28, 2013 | Permit id: 2013-171828-000 | |||||
Dfs for structural brb package Date: January 6, 2015Permit type: Application | Permit status: Approved | Completion date: September 26, 2014 | Permit id: 2013-171828-Dfs | |||||
Dfs for stair package and hand rails Date: January 6, 2015Permit type: Application | Permit status: Approved | Completion date: October 20, 2014 | Permit id: 2013-171828-Dfs | |||||
Dfs for curtain wall and glazing Date: March 27, 2015Permit type: Application | Permit status: Approved | Completion date: January 9, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - exterior metal panel / clad Permit type: Application | Permit status: Approved | Completion date: February 10, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - exterior metal panel / clad Permit type: Issuance/intake | Permit status: Intake | Completion date: February 10, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - exterior metal panel / clad Permit type: Process management | Permit status: Closed | Completion date: February 11, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - exterior metal panel / clad Permit type: Process management | Permit status: Closed | Completion date: April 3, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - exterior metal panel / clad Permit type: Process management | Permit status: Closed | Completion date: April 10, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - exterior metal panel / clad Permit type: Planning and zoning | Permit status: Approved | Completion date: March 17, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - exterior metal panel / clad Permit type: Life safety | Permit status: Approved | Completion date: March 5, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - exterior metal panel / clad Permit type: Structural | Permit status: Approved | Completion date: April 8, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - exterior metal panel / clad Permit type: Issuance | Permit status: Approved | Completion date: April 10, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - metal framed glass canopy Date: May 22, 2015Permit type: Application | Permit status: Approved | Completion date: April 21, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - acoustical ceiling Permit type: Application | Permit status: Approved | Completion date: June 8, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - acoustical ceiling Permit type: Issuance/intake | Permit status: Intake | Completion date: June 8, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - acoustical ceiling Permit type: Life safety | Permit status: Not reqd | Completion date: July 1, 2015 | Permit id: 2013-171828-Dfs | |||||
Rev 01 - add temporary gravel parking lot to site Date: August 27, 2014Permit type: Application | Permit status: Approved | Completion date: July 7, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Application | Permit status: Approved | Completion date: November 25, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Application | Permit status: Approved | Completion date: November 26, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Issuance/intake | Permit status: Intake | Completion date: November 26, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Process management | Permit status: Closed | Completion date: December 4, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Process management | Permit status: Closed | Completion date: December 19, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Process management | Permit status: Closed | Completion date: June 30, 2015 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Planning and zoning | Permit status: Approved | Completion date: December 31, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Site development | Permit status: Approved | Completion date: December 19, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Site development | Permit status: Not reqd | Completion date: December 19, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Life safety | Permit status: Approved | Completion date: December 16, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Structural | Permit status: Approved | Completion date: January 7, 2015 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: January 2, 2015 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Environmental services | Permit status: Approved | Completion date: June 15, 2015 | Permit id: 2013-171828-Rev | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Permit type: Issuance | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2013-171828-Rev | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. No structural changes under this permit. Permit type: Application | Permit status: Approved | Completion date: June 18, 2015 | Permit id: 2013-171828-Rev | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. No structural changes under this permit. Permit type: Issuance/intake | Permit status: Intake | Completion date: June 18, 2015 | Permit id: 2013-171828-Rev | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. No structural changes under this permit. Permit type: Process management | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2013-171828-Rev | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. No structural changes under this permit. Permit type: Life safety | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2013-171828-Rev | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. No structural changes under this permit. Permit type: Structural | Permit status: Not reqd | Completion date: June 19, 2015 | Permit id: 2013-171828-Rev | |||||
50-ton vav w/hrc & cw, one 1 ton hru with hw/cw, 270-ton chiller, 50ton hr chiller, chilled beam, 100 tus, steam generator, two 20 mbh condensing boilers, lab exhaust, plans w/co Date: July 31, 2014Permit type: Intake | Permit status: Closed | Completion date: June 28, 2013 | Permit id: 2013-171830-000 | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2013-171830-Rev | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. Permit type: Life safety | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2013-171830-Rev | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. Permit type: Mechanical review | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2013-171830-Rev | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. Permit type: Fire bureau | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2013-171830-Rev | |||||
30,60, processlegacy holladay park Date: June 17, 2015Permit type: Intake pw | Permit status: Assigned | Completion date: July 12, 2013 | Permit id: 2013-173900-000 | |||||
Install evaporator coil and condensing unit on w/i coolerpr# 490-686100-4581 Date: July 23, 2014Permit type: Intake | Permit status: Closed | Completion date: July 24, 2013 | Permit id: 2013-184121-000 | |||||
F1/ n end of ground floor; widen door to mechanical room in cmu wall, single to double with smoke seals. Date: October 1, 2013Permit type: Intake | Permit status: Closed | Completion date: September 23, 2013 | Permit id: 2013-208332-000 | |||||
Hvac air handler controls near chiller in basement, like for like electrical onlypr# ahu basement Date: November 27, 2013Permit type: Intake | Permit status: Closed | Completion date: November 27, 2013 | Permit id: 2013-233037-000 | |||||
Install one new panel antenna per sector (3 total) and one new remote radio unit per sector (3 total) install one new cabinet on existing equipment platform; work is on rooftop Date: November 5, 2014Permit type: Application | Permit status: Approved | Completion date: March 28, 2014 | Permit id: 2014-132436-000 | |||||
Site lighting - parking lot Date: June 30, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: September 8, 2014 | Permit id: 2014-177312-000 | |||||
Complete electrical for new 89,3 sq ft medical laboratory Date: May 11, 2015Permit type: Intake | Permit status: Closed | Completion date: July 15, 2014 | Permit id: 2014-184033-000 | |||||
Temporary service Date: July 22, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2014-187840-000 | |||||
New central hospital lab Date: July 31, 2014Permit type: Intake | Permit status: Closed | Completion date: July 31, 2014 | Permit id: 2014-191737-000 | |||||
Sprinkler - install new wet & dry systems to protect new addition, relocate sprinklers to maintain coverage around new ceilings & walls in small portions of the existing building that connect to new addition Date: November 5, 2014Permit type: Intake | Permit status: Approved | Completion date: October 3, 2014 | Permit id: 2014-221119-000 | |||||
Alarm-installation of a new networked fire alarm system for legacys medical laboratory addition Date: November 14, 2014Permit type: Intake | Permit status: Approved | Completion date: October 28, 2014 | Permit id: 2014-231271-000 | |||||
Ff3/ install walk-in coolers and freezer equipment Date: August 6, 2015Permit type: Reviews | Permit status: Approved | Completion date: August 6, 2015 | Permit id: 2015-212899-000 | |||||
Legacy holliday park (6)ckts for walk in freezers Date: October 27, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-256952-000 | |||||
Legacy holladay park medical center- connection for lab equipment (5) ckts Date: October 27, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: February 8, 2016 | Permit id: 2015-257034-000 | |||||
Plumbing renovation at legacy holladay parkreroute med gas lines Date: November 18, 2015Permit type: Intake | Permit status: Closed | Completion date: November 18, 2015 | Permit id: 2015-266408-000 | |||||
Add 2 sprinklers in new cabinets Date: December 15, 2015Permit type: Intake | Permit status: Closed | Completion date: December 15, 2015 | Permit id: 2015-277236-000 | |||||
Project for installation of sprinklers in existing sound booths Date: December 16, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 16, 2015 | Permit id: 2015-277924-000 | |||||
Install fire sprinklers in exitsting sound booths- 2 new sprinklers total Date: December 16, 2015Permit type: Intake | Permit status: Closed | Completion date: December 16, 2015 | Permit id: 2015-277927-000 | |||||
Add 5 circuits for penthouse mechanical Date: December 16, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: December 23, 2015 | Permit id: 2015-278014-000 | |||||
F25/ phase 1, floors 5-6 only; both floors, remove most partitions, doors,flooring, ceiling, reconfigure for patient rooms, hardened patient rooms, conference rooms, offices, nurse station, dining area, lounge, consultation, restrooms, ceiling, elec, plbg, finishes Date: January 13, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 13, 2016 | Permit id: 2016-105127-000 | |||||
Plumbing renovation at legacy holladay park 5th & 6th floor for behavioral health26-wc, 26-lav, 24-shower, 4-sinks Date: March 8, 2016Permit type: Intake | Permit status: Closed | Completion date: March 8, 2016 | Permit id: 2016-132012-000 | |||||
Power - phase 1, floors 5-6 only; both floors, remove most partitions, doors,flooring, ceiling, reconfigure for patient rooms, hardened patient rooms, conference rooms, offices, nurse station, dining area, lounge, consultation, restrooms, ceiling, elec, plbg, finishes Date: March 9, 2016Permit type: Intake | Permit status: Closed | Completion date: March 9, 2016 | Permit id: 2016-132565-000 | |||||
B2/ rooftop chiller replacement, new beam added to steel base Date: March 23, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139893-000 | |||||
Power - rooftop chiller replacement, new beam added to steel base Permit type: Intake | Permit status: Closed | Completion date: April 2, 2016 | Permit id: 2016-144365-000 | |||||
F12/ second floor - remove walls, construct new private and open offices, electrical, ceiling, fixtures and finishes Date: April 12, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2016-150097-000 | |||||
F12/ second floor - remove walls, construct new private and open offices, electrical, ceiling, fixtures and finishes Permit type: Intake | Permit status: Closed | Completion date: April 12, 2016 | Permit id: 2016-150102-000 | |||||
F13/ phase 1, floors 5-6 only - hvac for tenant improvement Permit type: Intake | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2016-151246-000 | |||||
Ew-power:fire pump 2835836:holladay prk:legacypr#s09-1361 Date: April 21, 2009Permit type: Intake | Permit status: Closed | Completion date: April 21, 2009 | Permit id: 2009-122882-000 | |||||
Dfs - exterior metal panel / clad Date: August 31, 2015Permit type: Application | Permit status: Approved | Completion date: February 10, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs - acoustical ceiling Date: July 16, 2015Permit type: Application | Permit status: Approved | Completion date: June 8, 2015 | Permit id: 2013-171828-Dfs | |||||
Dfs for mechanical and plumbing seismic bracing Date: December 15, 2015Permit type: Application | Permit status: Approved | Completion date: October 16, 2015 | Permit id: 2013-171828-Dfs | |||||
Revision - reduce size of east canopy to comply with public works sidewalk coverage requirements; relocate stormwater retention basin, remove stepped planter system and revise layout of stormwater drainage with provision of deep connection cleanouts at tie in to existing city stormwater plumbing line. Date: August 31, 2015Permit type: Application | Permit status: Approved | Completion date: November 25, 2014 | Permit id: 2013-171828-Rev | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. No structural changes under this permit. Date: August 31, 2015Permit type: Application | Permit status: Approved | Completion date: June 18, 2015 | Permit id: 2013-171828-Rev | |||||
50-ton vav w/hrc & cw, one 1 ton hru with hw/cw, 270-ton chiller, 50ton hr chiller, chilled beam, 100+ tus, steam generator, two 20 mbh condensing boilers, lab exhaust, plans w/co Date: July 31, 2014Permit type: Intake | Permit status: Closed | Completion date: June 28, 2013 | Permit id: 2013-171830-000 | |||||
Revision - owner requested changes to add an accessible toilet and (3) sinks in the specimen collection suite on the first floor existing building a. On the second floor of building b lockers b2 is changed to office function and storage b209 is enlarged and converted to office function. Also, electrical receptacles are being added for the pneumatic tube stations on level 1 and level 2. Date: August 31, 2015Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2013-171830-Rev | |||||
Install access control and video monitoring for the hp central lab pdx-11400 Date: June 11, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 16, 2015 | Permit id: 2015-184645-000 | |||||
Ff3 install walk-in coolers and freezer equipment Date: August 6, 2015Permit type: Reviews | Permit status: Approved | Completion date: August 6, 2015 | Permit id: 2015-212899-000 | |||||
F25 phase 1, floors 5-6 only; both floors, remove most partitions, doors,flooring, ceiling, reconfigure for patient rooms, hardened patient rooms, conference rooms, offices, nurse station, dining area, lounge, consultation, restrooms, ceiling, elec, plbg, finishes Date: January 13, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 13, 2016 | Permit id: 2016-105127-000 | |||||
B2 rooftop chiller replacement, new beam added to steel base Date: March 23, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139893-000 | |||||
Power - rooftop chiller replacement, new beam added to steel base Permit type: Intake | Permit status: Closed | Completion date: April 2, 2016 | Permit id: 2016-144365-000 | |||||
F12 second floor - remove walls, construct new private and open offices, electrical, ceiling, fixtures and finishes Date: April 12, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2016-150097-000 | |||||
F12 second floor - remove walls, construct new private and open offices, electrical, ceiling, fixtures and finishes Permit type: Intake | Permit status: Closed | Completion date: April 12, 2016 | Permit id: 2016-150102-000 | |||||
F13 phase 1, floors 5-6 only - hvac for tenant improvement Permit type: Intake | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2016-151246-000 | |||||
Dfs - exterior metal panel clad Date: August 31, 2015Permit type: Application | Permit status: Approved | Completion date: February 10, 2015 | Permit id: 2013-171828-Dfs | |||||
50-ton vav w hrc & cw, one 1 ton hru with hw cw, 270-ton chiller, 50ton hr chiller, chilled beam, 100+ tus, steam generator, two 20 mbh condensing boilers, lab exhaust, plans w co Date: July 31, 2014Permit type: Intake | Permit status: Closed | Completion date: June 28, 2013 | Permit id: 2013-171830-000 | |||||
Sani conn: 204 of 8 csp sanitary sewer main in public easement from ne 1st ave. Contractor to tap manhole (abg585) and build new 8 branch to property. Manhole approx 7. 7deep. Contr to verify depth location proper slope in the field. Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-134815-000 | |||||
1of2 storm conn: 137 of vsp storm sewer main in public easement from ne 1st ave. Contractor to tap manhole (abg579) and build new 6 branch to property. Manhole approx. 15 deep. Contr to verify depth location proper slope in the field. Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-134837-000 | |||||
2of2 storm conn: 254 of vsp storm sewer main in public easement from ne 1st ave. Contractor to tap main & install deep connection riser & build new 6 branch to property. Mainline approx. 15 deep. Contr to verify depth location proper slope in the field. Date: March 17, 2015Permit type: Intake | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2015-134845-000 | |||||
New tenant on sixth floor - demo existing partition walls, new psychiatric ward for oregon state hospital. See folder documents for fls summary. Date: November 29, 2006Client: None | Permit type: Alteration | Permit status: Final | Completion date: June 12, 2007 | Current use: Institutional | Permit id: 2006-148241-000 | |||||
Remove 5 existing antennas and replace with 6 new antennas. Remove existing cabinet and replace with 2 new cabinets. Date: May 30, 2013Client: None | Permit type: Alteration | Permit status: Final | Completion date: May 5, 2014 | Current use: Utility | Permit id: 2013-129861-000 |