ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
--------notice to proceed---emergency stabilation of brownstone door lintel. Repoint mortar on brick facade above and around brownstone lintel. Remove jounts using tools narrower than the joint. Replacement mortar should be compatible with historic maso Date: May 7, 2014 Value: $450Permit id: Com2014-09497 | |||||
Install smoke detectors throughout property (1 circuit) as per code. Date: February 7, 2013 Value: $600Permit id: Com2013-02372 | |||||
Notice to proceed: install a 3-foot guard rail in 2nd story door frame with supports rails every 4 inches. The aluminum balustrade and wood rail and base will be painted black. The rail will be mounted inside the existing door opening. The two vertical wo Date: February 5, 2013 Value: $500Permit id: Com2012-26253 | |||||
Notice to proceed: install a 3-foot guard rail in 2nd story door frame with supports rails every 4 inches. The aluminum balustrade and wood rail and base will be painted black. The rail will be mounted inside the existing door opening. The two vertical wood remnants of the former porch ( to the left and right of the existing door opening) will removed and the beam pockets will be filled and repairs painted to match the existing wall. All work to be completed as per plans in chap files Date: February 5, 2013 Value: $500Expiration date: August 5, 2013 | Permit id: Com2012-26253 | |||||
--------notice to proceed---emergency stabilation of brownstone door lintel. Repoint mortar on brick facade above and around brownstone lintel. Remove jounts using tools narrower than the joint. Replacement mortar should be compatible with historic masonry and the original mortar mix and must match historic mortar joits in color texture joint size profile and hardness. Repair of deteriorated brownstone may also be necessary. The applicants contractor will consult will chap staff prior to beginning work to further dtermine scope and methodology which may result in an updated notice-to-proceed Date: May 7, 2014 Value: $450Expiration date: November 7, 2014 | Permit id: Com2014-09497 |