ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Stucco seal all accesses to the entire bldg at 1st sty and bsmt of the entire bldg. As follows: 5 door and 13 windows total. At front: 4 door Date: February 11, 2013Permit type: Gc | Permit id: Ed16187 | |||||
P/a stairs secure stair treads 2nd and 3rd from bottom up at west front of building. Remove all work related debris. Non s. W. P. Contract Date: November 6, 2009 Value: $121Permit type: Gc | Permit id: Ea15517 | |||||
P a stairs secure stair treads 2nd and 3rd from bottom up at west front of building. Remove all work related debris. Non s. W. P. Contract Date: November 6, 2009 Value: $121Permit type: Gc | Permit id: Ea15517 | |||||
At basement make all necessary repairs to gas fired boiler. Restore to proper working condition. Restore heat to 2nd floor apt. Restore all vandalized Date: January 28, 2013Permit type: Plumb | Permit id: Ed13362 | |||||
At basement entrances install one (1) h. M. Door at interior basement access and one (1) at front exterior basement entrance, including frame, standar Date: January 8, 2013Permit type: Gc | Permit id: Ed13359 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: November 30, 2012Permit type: Util | Permit id: Ed11155 | |||||
Nationalgrid provide gas to boiler hot water heater Date: November 30, 2012Permit type: Util | Permit id: Ed11155 |