ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Zoning/use permit Date: April 14, 2011Client: Community Ventures | Permit status: Completed | Permit id: 328990 | |||||
Zoning permit Date: March 24, 2011Client: Community Ventures | Permit status: Completed | Permit id: 317725 | |||||
Permit for the relocation of lot lines to create four (4) lots from six (6) lots, for the erection of four (4) three story structures (not to exceed 35) with roof decks @ 2nd story levels, for the creation ofan access easement for vehicular and pedestrian access to new lots, erection of (2-0") high wall with a 6-0" high fence atop (8-0") over all height, erection of 4-0" high privacy fences, erection of an 80" high along latona street. Date: February 1, 2011Client: Community Ventures | Applicant: Michael Floyd, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 14394 | |||||
Zoning use permit Date: April 14, 2011Client: Community Ventures | Permit status: Completed | Permit id: 328991 | |||||
Zoning permit Date: March 24, 2011Client: Community Ventures | Permit status: Completed | Permit id: 317725 | |||||
Permit for the relocation of lot lines to create four (4) lots from six (6) lots, for the erection of four (4) three story structures (not to exceed 35) with roof decks @ 2nd story levels, for the creation ofan access easement for vehicular and pedestrian access to new lots, erection of (2-0") high wall with a 6-0" high fence atop (8-0") over all height, erection of 4-0" high privacy fences, erection of an 80" high along latona street. Date: February 1, 2011Client: Community Ventures | Applicant: Michael Floyd, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 14394 | |||||
3 story,sfd(attached) with a concrete pavement walkways,patios,ornamental metal fencing and accesory parking space(lot 5 will be ada accessible)there will be a common area such as driveway,curb cut, asphalt parking, walkways, fencing and retaining walls. A 16 curb cut to provide ingress egress for ada parking. Development wil include street trees and crub and sidewalk replacement. Solar panels will constructed on roofs. Date: April 14, 2011Client: Community Ventures | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 14, 2011 | Permit id: 328992 | |||||
For the relocation of lot lines to create 4 lots from 6 lots. Eac lot will have a 3 story,sfd(attached) with a concrete pavement walkways,patios,ornamental metal fencing and accesory parking space(lot 5 will be ada accessible)there will be a common area such as driveways,curb cuts, asphalt parking, walkways, fencing and retaining walls. A 16 curb cut to provide ingress egress for ada parking. Development wil include street trees and crub and sidewalk replacement. Solar panels will constructed on roofs. Date: March 24, 2011Client: Community Ventures | Permit type: Zoning permit | Permit status: Completed | Completion date: March 28, 2011 | Permit id: 317725 |