| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
New home on vacant lot revision - change setbacks on house due to change in garage. - ms Date: May 8, 2015 Value: $200,000Permit type: Building residential | Permit status: Stop work | Current use: Single family dwelling | Permit id: 674831 | |||||
Restoration of row complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused byconstruction operations. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: September 29, 2015Permit type: Public right of way | Permit status: Issued | Current use: Driveway | Permit id: 346591 | |||||
Bore roadway; dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3523026. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 9, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 355305 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Open | Current use: Single family dwelling | Permit id: 771466 |