| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Reviews Date: February 28, 2006Permit status: Closed | Completion date: February 28, 2006 | Permit id: 2006-112208-000 | |||||
Voice/data - voluntary seismic upgrade in conjuction with interior renovations of 1st and 2nd floors, remove some walls, doors, add back some for classrooms, work rooms, doors, flooring, ceiling, elec - voice;/data Date: November 18, 2014Permit type: Intake | Permit status: Closed | Completion date: November 18, 2014 | Permit id: 2014-239461-000 | |||||
Increasing the yemp rating for 2 sprinkler heads that are located above 2 kilns--3 sets of plans Date: November 25, 2014Permit type: Intake | Permit status: Closed | Completion date: November 25, 2014 | Permit id: 2014-242248-000 | |||||
Alarm-install duct detector units in mdf Date: December 31, 2014Permit type: Intake | Permit status: Closed | Completion date: December 16, 2014 | Permit id: 2014-250151-000 | |||||
Reconnect service at ht west Date: December 17, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: January 5, 2015 | Permit id: 2014-250627-000 | |||||
F13/ lower level - replace domstic hot water heat exchangers with condensing water heaters Date: December 19, 2014Permit type: Reviews | Permit status: Approved | Completion date: December 19, 2014 | Permit id: 2014-251500-000 | |||||
F13/ lower level - replace 3 domstic hot water heat exchangers & small boiler with 4 new condensing water heaters on existing pad plus 8 feet of new pad on either side of existing pad Permit type: Intake | Permit status: Closed | Completion date: December 19, 2014 | Permit id: 2014-251514-000 | |||||
Plumbing renovastion at pcc sylvania heat plant to replace 3 wh with 4 wh Date: December 22, 2014Permit type: Intake | Permit status: Closed | Completion date: December 22, 2014 | Permit id: 2014-252464-000 | |||||
Phase 2- alterations to the fire sprinklers as needed for t. I.- add, remove & relocate- 108 heads total Date: January 6, 2015Permit type: Intake | Permit status: Closed | Completion date: January 6, 2015 | Permit id: 2015-101614-000 | |||||
Fire alarm wiring - phase 2 level 2 office space renovation, open office area, conference rooms, computer lab and other spaces - fire alarm wiring Date: January 9, 2015Permit type: Intake | Permit status: Closed | Completion date: January 9, 2015 | Permit id: 2015-103298-000 | |||||
Pwr/controls - lower level - replace 3 domstic hot water heat exchangers & small boiler with 4 new condensing water heaters on existing pad - pwr/controls Date: January 13, 2015Permit type: Intake | Permit status: Closed | Completion date: January 13, 2015 | Permit id: 2015-104393-000 | |||||
B1/ csb document archives expansion, 21 x 14 chain link fence enclosure, relocate electrical receptacle, install hm door & frame Date: January 16, 2015Permit type: Reviews | Permit status: Approved | Completion date: January 16, 2015 | Permit id: 2015-106424-000 | |||||
Pwr - csb document archives expansion, 21 x 14 chain link fence enclosure, relocate electrical receptacle - pwr Permit type: Intake | Permit status: Closed | Completion date: January 23, 2015 | Permit id: 2015-109530-000 | |||||
Alterations to the fire alarm system as needed for t. I.- 42 devices total1- smoke detector9- strobes21- speaker/strobes11- pull stations Date: February 6, 2015Permit type: Intake | Permit status: Closed | Completion date: February 6, 2015 | Permit id: 2015-116016-000 | |||||
Construction of new learning garden canopy 12x16, open air structure, no walls, (4)wood posts, metal roof Date: March 31, 2015Permit type: Application | Permit status: Approved | Completion date: March 12, 2015 | Permit id: 2015-132717-000 | |||||
Voluntary construction of a stepped, storm water detention facility Date: June 17, 2015Permit type: Application | Permit status: Approved | Completion date: March 24, 2015 | Permit id: 2015-139222-000 | |||||
Adding sprinkler coverage below the theater stage. Date: April 7, 2015Permit type: Intake | Permit status: Closed | Completion date: April 7, 2015 | Permit id: 2015-146218-000 | |||||
Site lighting Date: April 16, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: June 26, 2015 | Permit id: 2015-150516-000 | |||||
F29/ phase 2; major renovations to the central east, ne, nw and upper mall areas of multipurpose student services building, concrete work, wall demo, flooring, ceilings, plbg, elec, etc Date: April 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 20, 2015 | Permit id: 2015-153302-000 | |||||
F29/ new vavs, controls, hydronic piping, ductwork throughout Date: June 23, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-153304-000 | |||||
Le for camera install Date: April 29, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: May 4, 2015 | Permit id: 2015-161091-000 | |||||
Pwr - phase 2; major renovations to the central east, ne, nw and upper mall areas of multipurpose student services building, concrete work, wall demo, flooring, ceilings, plbg, elec - pwr Permit type: Intake | Permit status: Closed | Completion date: May 7, 2015 | Permit id: 2015-166876-000 | |||||
B2/ gas line to portable kiln Date: May 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 18, 2015 | Permit id: 2015-172520-000 | |||||
B2/ gas line to existing portable kiln Date: May 21, 2015Permit type: Intake | Permit status: Closed | Completion date: May 18, 2015 | Permit id: 2015-172541-000 | |||||
Hazardous-install a 5 gallon well log and hooking up to greenhouse Date: June 5, 2015Permit type: Intake | Permit status: Approved | Completion date: May 28, 2015 | Permit id: 2015-176533-000 | |||||
Hazardous-installing a 5 gallon tank for vapor use. Date: June 5, 2015Permit type: Intake | Permit status: Approved | Completion date: May 28, 2015 | Permit id: 2015-176535-000 | |||||
Plumbing renovation at pcc sylvania cc building3 sinks, fs Permit type: Intake | Permit status: Closed | Completion date: May 28, 2015 | Permit id: 2015-177164-000 | |||||
B1/ bunker #2 & #3 re-roof project - remove rtus for re-roof and replace same equipment when roofing is complete Date: June 12, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 12, 2015 | Permit id: 2015-185316-000 | |||||
F15/ kiln yard - seismic bracing (non-structural components) of brick kilns Date: June 19, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2015-188677-000 | |||||
F15/ kiln yard - seismic bracing (non-structural components) of brick kilns Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-188682-000 | |||||
F18/ radiography/dental departments, 2nd & 3rd floors; remodel, new walls, ceiling, cabinets, counters, new equipment and anchoring, finishes, elec, plbg Date: June 23, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-191084-000 | |||||
F18/ radiography/dental departments, 2nd & 3rd floors; remodel, new walls, ceiling, cabinets, counters, new equipment and anchoring, finishes, elec, plbg Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-191098-000 | |||||
F18/ new equipment, ductwork to existing systems, balance and relocate thermostats Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-191100-000 | |||||
B1/ bunker #2 & #3 re-roof project - new roof top mechanical units Permit type: Intake | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2015-195362-000 | |||||
B2/pr# pub saf/expansion of public safety office Date: March 27, 2008Permit type: Reviews | Permit status: Approved | Completion date: March 27, 2008 | Permit id: 2008-118372-000 | |||||
Intake Date: November 19, 2009Permit status: Closed | Completion date: November 19, 2009 | Permit id: 2009-172614-000 | |||||
B3/pr# sy1014-sylvania csb 314 ti/ sylvania csb fms office remodel Date: May 27, 2010Permit type: Reviews | Permit status: Approved | Completion date: May 27, 2010 | Permit id: 2010-141507-000 | |||||
Create project for mass notification device. Date: September 13, 2010Permit type: Reviews | Permit status: Approved | Completion date: September 13, 2010 | Permit id: 2010-175212-000 | |||||
Campus wide building energy and plumbing fixture water savings measures. Date: September 24, 2010Permit type: Reviews | Permit status: Approved | Completion date: September 24, 2010 | Permit id: 2010-179142-000 | |||||
F3/pr#sy1014-sylvaniacsb/hvac Date: June 15, 2011Permit type: Intake | Permit status: Closed | Completion date: May 18, 2011 | Permit id: 2011-140894-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Application | Permit status: Approved | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Issuance/intake | Permit status: Intake | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Process management | Permit status: Closed | Completion date: June 23, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Erosion control | Permit status: Approved | Completion date: July 5, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Site development | Permit status: Approved | Completion date: July 5, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Life safety | Permit status: Approved | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Structural | Permit status: Not reqd | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: July 1, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Fire bureau | Permit status: Not reqd | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Environmental services | Permit status: Approved | Completion date: July 11, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Transportation | Permit status: Not reqd | Completion date: July 7, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Transportation | Permit status: Approved | Completion date: July 8, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Transportation | Permit status: Closed | Completion date: July 8, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 22, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Parks bureau | Permit status: Approved | Completion date: July 1, 2011 | Permit id: 2011-150363-000 | |||||
One circuit for installation of pole lights for the roadway on propertyfaxed Date: February 24, 2012Permit type: Intake | Permit status: Closed | Completion date: February 24, 2012 | Permit id: 2012-115775-000 | |||||
New one story building for classrooms, office space and storage for automotive program Date: September 7, 2012Permit type: Application | Permit status: Approved | Completion date: March 13, 2012 | Permit id: 2012-119949-000 | |||||
4-tono packaged side wall heat pump, ductwork, plans w/12-119949 co Date: September 7, 2012Permit type: Intake | Permit status: Closed | Completion date: March 15, 2012 | Permit id: 2012-119952-000 | |||||
F12/ 1st floor library remodel, new offices & classroom for student success center, 2nd floor study room doors and new idf room, calcs for mechanical supports Date: June 18, 2012Permit type: Intake | Permit status: Closed | Completion date: May 14, 2012 | Permit id: 2012-140548-000 | |||||
F12/ 1st floor library remodel new mechanical equipment, air handler, chiller, pumps & vav units Date: June 18, 2012Permit type: Intake | Permit status: Closed | Completion date: May 14, 2012 | Permit id: 2012-140550-000 | |||||
Ew-data -:125,260, 3147684:health tech :sylvaniapr#20097087 healthplant Date: May 17, 2012Permit type: Intake | Permit status: Closed | Completion date: May 17, 2012 | Permit id: 2012-141954-000 | |||||
F12/ 1st floor library remodel, new offices & classroom for student success center, 2nd floor study room doors and new idf room, calcs for mechanical supportspr#20097070 Date: June 21, 2012Permit type: Intake | Permit status: Closed | Completion date: June 21, 2012 | Permit id: 2012-153795-000 | |||||
Reviews Date: August 2, 2012Permit status: Approved | Completion date: August 2, 2012 | Permit id: 2012-168375-000 | |||||
Pr-access:collegeserbg:sylvaniapr#csb 314 access Date: September 4, 2012Permit type: Reviews | Permit status: Approved | Completion date: September 4, 2012 | Permit id: 2012-178684-000 | |||||
New cabinet for battery back up equipment Date: February 25, 2013Permit type: Application | Permit status: Approved | Completion date: November 15, 2012 | Permit id: 2012-205864-000 | |||||
Install storm for new building Date: November 16, 2012Permit type: Intake | Permit status: Closed | Completion date: November 16, 2012 | Permit id: 2012-206117-000 | |||||
F10/ create 549 sq ft idf (telecom) and storage room on existing exterior covered deck located on the 2 level Date: April 26, 2013Permit type: Intake | Permit status: Closed | Completion date: April 9, 2013 | Permit id: 2013-137606-000 | |||||
F6/ complete renovation of the building including a new dynamometer pit, raised access platform, reconfigure classrooms and auto shop areas Date: May 17, 2013Permit type: Intake | Permit status: Closed | Completion date: April 23, 2013 | Permit id: 2013-142812-000 | |||||
F6/ complete renovation of the building including - replace existing new and controls, duct cleaning, balancing, fan coils units in classrooms and vfd on roof Date: May 17, 2013Permit type: Intake | Permit status: Closed | Completion date: April 23, 2013 | Permit id: 2013-142814-000 | |||||
F4/ voluntary seismic upgrade to structure Date: August 23, 2013Permit type: Intake | Permit status: Closed | Completion date: May 23, 2013 | Permit id: 2013-158815-000 | |||||
F16/ suite 123 lower level abe/ged office and classroom renovation Date: May 31, 2013Permit type: Intake | Permit status: Closed | Completion date: May 28, 2013 | Permit id: 2013-160567-000 | |||||
B2/ dfs for spray on fireproofing Date: October 1, 2013Permit type: Intake | Permit status: Closed | Completion date: September 25, 2013 | Permit id: 2013-161753-Dfs | |||||
B1/ cc building renovation - phase 1 - renovate the southeast portion of the bldg - dfs-02 mechanical equipment anchoring Date: April 14, 2014Permit type: Intake | Permit status: Closed | Completion date: April 1, 2014 | Permit id: 2013-161753-Dfs | |||||
Sprinkler - add (1) sprinkler and remove (1) sprinkler for new walls in t. I. Date: March 11, 2015Permit type: Intake | Permit status: Closed | Completion date: August 9, 2013 | Permit id: 2013-191206-000 | |||||
F7/ st bldg renovation phase 2 - 1st floor convert office space into classrooms, 2nd floor convert classrooms into office space and renovate portions of 2nd floor, 3rd floor renovate floor labs Date: October 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 24, 2013 | Permit id: 2013-209239-000 | |||||
F7/ st bldg renovation phase 2 modify existing hvac system, provide new exhauast snorkels at labs Date: October 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 24, 2013 | Permit id: 2013-209243-000 | |||||
F5/ 1st floor, classroom 111; rev-01 add classroom are replace part of the ceiling Date: January 23, 2014Permit type: Intake | Permit status: Closed | Completion date: December 24, 2013 | Permit id: 2013-225962-Rev | |||||
St bldg renovation phase 2 - 1st floor convert office space into classrooms, 2nd floor convert classrooms into office space and renovate portions of 2nd floor, 3rd floor renovate floor labspr# syvania bond-st phas Date: February 28, 2014Permit type: Intake | Permit status: Closed | Completion date: November 23, 2013 | Permit id: 2013-231760-000 | |||||
Sprinkler - relocate heads to maintain coverage around new walls and ceilings Date: December 31, 2013Permit type: Intake | Permit status: Closed | Completion date: December 27, 2013 | Permit id: 2013-242296-000 | |||||
Fire alarms-fire alarm improvements Date: February 5, 2014Permit type: Intake | Permit status: Closed | Completion date: February 4, 2014 | Permit id: 2014-113573-000 | |||||
F5/ voluntary seismic upgrade in conjuction with interior renovations of 1st and 2nd floors, remove some walls, doors, add back some for classrooms, work rooms, doors, flooring, ceiling, elec, plbg, finishes Date: March 4, 2014Permit type: Intake | Permit status: Closed | Completion date: February 6, 2014 | Permit id: 2014-114486-000 | |||||
B2/ dfs o1 for attachment of equipment Date: December 1, 2014Permit type: Intake | Permit status: Closed | Completion date: November 3, 2014 | Permit id: 2014-114486-Dfs | |||||
B2/ dfs 02 for buckling restrained brace welding Date: November 13, 2014Permit type: Intake | Permit status: Closed | Completion date: November 3, 2014 | Permit id: 2014-114486-Dfs | |||||
F5/ balancing, commissioning, equipment, layout modifications Date: March 4, 2014Permit type: Intake | Permit status: Closed | Completion date: February 6, 2014 | Permit id: 2014-114492-000 | |||||
New 16 sf open sided structure for kilns and pottery class; 68 high concrete wall at back wall and partial walls at sides; new stormwater planter at entrance, replace 6 fence at perimeter Date: May 28, 2014Permit type: Application | Permit status: Approved | Completion date: February 11, 2014 | Permit id: 2014-115082-000 | |||||
Gas piping, kiln exhaust fans, open shed for make up air, plans w/co Date: May 28, 2014Permit type: Intake | Permit status: Approved | Completion date: February 11, 2014 | Permit id: 2014-115083-000 | |||||
Plumbing renovation at pcc sylvania ct building Date: September 25, 2014Permit type: Intake | Permit status: Closed | Completion date: February 20, 2014 | Permit id: 2014-119132-000 | |||||
Pwr - voluntary seismic upgrade in conjuction with interior renovations of 1st and 2nd floors, remove some walls, doors, add back some for classrooms, work rooms, ceiling, elec, -pwr Date: June 23, 2014Permit type: Intake | Permit status: Closed | Completion date: March 4, 2014 | Permit id: 2014-123307-000 | |||||
F15/ cc building 2nd level office swing space remodel, new walls for private offices and remodel open office space Date: March 27, 2014Permit type: Intake | Permit status: Closed | Completion date: March 10, 2014 | Permit id: 2014-124992-000 | |||||
Pwr - cc building 2nd level office swing space remodel, new walls for private offices and remodel open office space - pwr Date: April 29, 2014Permit type: Intake | Permit status: Closed | Completion date: April 9, 2014 | Permit id: 2014-137904-000 | |||||
Electrical master permit - inspections Date: April 9, 2014Permit type: Intake | Permit status: Closed | Completion date: April 9, 2014 | Permit id: 2014-138507-000 | |||||
F4/ voluntary seismic separation of the exterior pedestrian bridge between the ss building and the st building Date: June 12, 2014Permit type: Intake | Permit status: Closed | Completion date: April 14, 2014 | Permit id: 2014-141109-000 | |||||
B2/ 1st floor mens restroom; mold and asbestos repair, remove one fixture, repair partitions and door, restore Date: April 22, 2014Permit type: Intake | Permit status: Closed | Completion date: April 18, 2014 | Permit id: 2014-144514-000 | |||||
Plumbing renovation at pcc sylvania ss building 1st floor mens restroom4 wc, 9 urinals, 8 lavs remove and replace Date: April 21, 2014Permit type: Intake | Permit status: Closed | Completion date: April 21, 2014 | Permit id: 2014-145271-000 | |||||
Enclose existing courtyard on east side with new roof and glazed exterior wall for a new entry in the pcc sylvania cc building Date: August 27, 2014Permit type: Application | Permit status: Approved | Completion date: May 15, 2014 | Permit id: 2014-157019-000 | |||||
Dfs for intumescent fireproofing Date: May 20, 2015Permit type: Application | Permit status: Approved | Completion date: October 21, 2014 | Permit id: 2014-157019-Dfs | |||||
Dfs for metal framed skylight Date: May 1, 2015Permit type: Application | Permit status: Approved | Completion date: October 21, 2014 | Permit id: 2014-157019-Dfs | |||||
Value added revision: structural steel members, details and calculations for skylight support, west wall stud framing and mechanical penetration Date: May 5, 2015Permit type: Application | Permit status: Approved | Completion date: March 24, 2015 | Permit id: 2014-157019-Rev | |||||
New ductwork connecting into an existing air handler unit for new enclosed entry, plans w/co Date: August 27, 2014Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157023-000 | |||||
Sprinkler - relocate heads to maintain coverage around new walls & ceilings Date: May 21, 2014Permit type: Intake | Permit status: Closed | Completion date: May 16, 2014 | Permit id: 2014-157625-000 | |||||
F6/ ss-202 renovation to an existing classroom including removal and infill of a door and relite Date: May 28, 2014Permit type: Intake | Permit status: Closed | Completion date: May 19, 2014 | Permit id: 2014-158680-000 | |||||
B1/ cc - 1st floor mens restroom repair and renovation Date: June 4, 2014Permit type: Intake | Permit status: Closed | Completion date: May 30, 2014 | Permit id: 2014-163251-000 | |||||
Power - ss-202 renovation to an existing classroom including removal and infill of a door and relite Date: May 31, 2014Permit type: Intake | Permit status: Closed | Completion date: May 31, 2014 | Permit id: 2014-163592-000 | |||||
Plumbing renovation at pcc sylvania cc building mens rrr/r 4 wc, 8 lav, 8 urinals Date: July 17, 2014Permit type: Intake | Permit status: Closed | Completion date: June 2, 2014 | Permit id: 2014-163984-000 | |||||
Upgrade alarm system---2 sets of plans Date: June 5, 2014Permit type: Intake | Permit status: Closed | Completion date: June 5, 2014 | Permit id: 2014-165425-000 | |||||
Install catch basin and primer Date: June 18, 2014Permit type: Plumbing inspections | Permit status: Approved | Completion date: June 26, 2014 | Permit id: 2014-171532-000 | |||||
Adding new circuits from existing panels for lighting and receptacles Date: July 7, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-179904-000 | |||||
Relocate 2 strobes- no plans Date: July 23, 2014Permit type: Intake | Permit status: Closed | Completion date: July 23, 2014 | Permit id: 2014-188209-000 | |||||
Power - cc - 1st floor mens restroom repair and renovation Date: July 31, 2014Permit type: Intake | Permit status: Closed | Completion date: July 31, 2014 | Permit id: 2014-191577-000 | |||||
Alteration to the existing fire alarm system--2 sets of plans Date: July 31, 2014Permit type: Intake | Permit status: Closed | Completion date: July 31, 2014 | Permit id: 2014-191682-000 | |||||
F12/ ct building - little theater renovation including new stage floor and demo of small room Date: July 31, 2014Permit type: Reviews | Permit status: Approved | Completion date: July 31, 2014 | Permit id: 2014-191841-000 | |||||
F18/ phase 2 level 2 office space renovation, open office area, conference rooms, computer lab and other spaces Date: August 26, 2014Permit type: Reviews | Permit status: Approved | Completion date: August 26, 2014 | Permit id: 2014-204048-000 | |||||
F18/ phase 2 level 2 office space renovation - new ductwork, vavs and controls Date: September 18, 2014Permit type: Intake | Permit status: Closed | Completion date: August 26, 2014 | Permit id: 2014-204062-000 | |||||
Electrical for cc east entry Date: August 28, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: May 4, 2015 | Permit id: 2014-205464-000 | |||||
Plumbing renovation at pcc sylvania ss building level 200breakroom sink, df Date: January 15, 2015Permit type: Intake | Permit status: Closed | Completion date: September 16, 2014 | Permit id: 2014-213495-000 | |||||
Phase 2 level 2 office space renovation, open office area, conference rooms, computer lab and other spaces Date: January 14, 2015Permit type: Intake | Permit status: Closed | Completion date: September 16, 2014 | Permit id: 2014-213698-000 | |||||
Voice/data - phase 2 level 2 office space renovation, open office area, conference rooms, computer lab and other spaces - voice/data Date: February 26, 2015Permit type: Intake | Permit status: Closed | Completion date: September 18, 2014 | Permit id: 2014-214488-000 | |||||
Fire spirnkler - provide new sprinklers for new entry from existing fire sprinkler system Date: October 23, 2014Permit type: Intake | Permit status: Approved | Completion date: October 1, 2014 | Permit id: 2014-219912-000 | |||||
Replace existing mechanical equip Date: October 3, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: March 13, 2015 | Permit id: 2014-221245-000 | |||||
B1/ cc building/ mdf refrigeration upgrade Date: October 17, 2014Permit type: Reviews | Permit status: Approved | Completion date: October 17, 2014 | Permit id: 2014-226937-000 | |||||
Pwr - cc building/ mdf refrigeration upgrade - pwr Date: January 26, 2015Permit type: Intake | Permit status: Closed | Completion date: October 21, 2014 | Permit id: 2014-228228-000 | |||||
Replacement of 3/4 pipe and two ckts for out side lighting Date: November 5, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 7, 2014 | Permit id: 2014-234881-000 | |||||
Add a biodeisel fueling system to existing tanking area adjacent to auto shop Permit type: Application | Permit status: Approved | Completion date: September 17, 2007 | Permit id: 2007-162973-000 | |||||
Add a biodeisel fueling system to existing tanking area adjacent to auto shop Permit type: Planning and zoning | Permit status: Approved | Completion date: September 17, 2007 | Permit id: 2007-162973-000 | |||||
Add a biodeisel fueling system to existing tanking area adjacent to auto shop Permit type: Erosion control | Permit status: Not reqd | Completion date: September 17, 2007 | Permit id: 2007-162973-000 | |||||
Add a biodeisel fueling system to existing tanking area adjacent to auto shop Permit type: Environmental services | Permit status: Approved | Completion date: September 17, 2007 | Permit id: 2007-162973-000 | |||||
B2/ level 1, room 1 - divide office # 1 with new wall and door, relocate lighting, mech, electrical Date: July 29, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 29, 2015 | Permit id: 2015-209045-000 | |||||
B2/ level 1, room 1 - relocate diffusers Date: August 5, 2015Permit type: Intake | Permit status: Closed | Completion date: July 29, 2015 | Permit id: 2015-209056-000 | |||||
Pwr - st2 bunker remodel, - pwr Date: August 1, 2015Permit type: Intake | Permit status: Closed | Completion date: August 1, 2015 | Permit id: 2015-210543-000 | |||||
Pwr - level 1, room 1 - divide office # 1 with new wall and door, relocate lighting, mech, electrical - pwr Date: August 12, 2015Permit type: Intake | Permit status: Closed | Completion date: August 12, 2015 | Permit id: 2015-217182-000 | |||||
Hvac controls - phase 2; major renovations to the central east, ne, nw and upper mall areas of multipurpose student services building, - hvac controls Date: October 22, 2015Permit type: Intake | Permit status: Closed | Completion date: August 28, 2015 | Permit id: 2015-227249-000 | |||||
Data/fire alarm wiring - phase 2; major renovations to the central east, ne, nw and upper mall areas of multipurpose student services building - data/fa wiring Date: August 31, 2015Permit type: Intake | Permit status: Closed | Completion date: August 31, 2015 | Permit id: 2015-228720-000 | |||||
Fire alarm system remodel to extend the mass notification system . Phase two of a 4 phased project. Date: September 8, 2015Permit type: Intake | Permit status: Closed | Completion date: September 8, 2015 | Permit id: 2015-233318-000 | |||||
Pwr - radiography/dental departments, 2nd & 3rd floors; remodel, new walls, ceiling, cabinets, counters, new equipment and anchoring, finishes, elec - pwr Date: September 9, 2015Permit type: Intake | Permit status: Closed | Completion date: September 9, 2015 | Permit id: 2015-233609-000 | |||||
Voice/data - radiography/dental departments, 2nd & 3rd floors; remodel - voice/data Date: September 11, 2015Permit type: Intake | Permit status: Closed | Completion date: September 11, 2015 | Permit id: 2015-235416-000 | |||||
F19/ room 112, replace vav with fan coil, install frequency drive and air balance machine shop Date: October 6, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 6, 2015 | Permit id: 2015-246677-000 | |||||
Hazardous-switch out 5 gallon tank with a 5 gallon with wet leg. Date: October 26, 2015Permit type: Intake | Permit status: Approved | Completion date: October 8, 2015 | Permit id: 2015-247599-000 | |||||
Phase 2-sprinkler-adjust existing sprinkler system to accommodate remodel Date: November 10, 2015Permit type: Intake | Permit status: Closed | Completion date: October 21, 2015 | Permit id: 2015-254458-000 | |||||
Voice/data - phase 2; major renovations to the central east, ne, nw and upper mall areas of multipurpose student services building - voice/data Date: October 22, 2015Permit type: Intake | Permit status: Closed | Completion date: October 22, 2015 | Permit id: 2015-255215-000 | |||||
Control wiring - radiography/dental departments, 2nd & 3rd floors;imaging equipment - control wiring Date: October 27, 2015Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-257009-000 | |||||
Sprinkler - relocation of (2) sprinkler heads and raising of (1) sprinkler head Date: November 10, 2015Permit type: Intake | Permit status: Closed | Completion date: October 30, 2015 | Permit id: 2015-258497-000 | |||||
Pwr/controls - room 112, replace vav with fan coil, install frequency drive pwr Date: November 1, 2015Permit type: Intake | Permit status: Closed | Completion date: November 1, 2015 | Permit id: 2015-258922-000 | |||||
Alteration to at&t site to remove (1) gsm 850/19 antenna (3) one per sector (4)gsm 850/19 tmas (12)(4) per sector (1) lte 7 antenna per sector(3) totalreplace with(3)lte 700/19 (1)per sector lte 19 rrh total of 3 Date: February 5, 2016Permit type: Application | Permit status: Approved | Completion date: December 3, 2015 | Permit id: 2015-272396-000 | |||||
Private property tree removal permit Date: December 15, 2015Permit type: A - research | Permit status: Title 11 permit required | Completion date: December 15, 2015 | Permit id: 2015-277207-000 | |||||
B1/ server room - replace a/c mini split system and outdoor unit in mech room Date: January 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 7, 2016 | Permit id: 2016-102111-000 | |||||
B1/ library server room - replace a/c min split and outdoor unit in mech room Date: January 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 7, 2016 | Permit id: 2016-102120-000 | |||||
Plumbing renovation at pcc sylvania hp building Date: February 9, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 9, 2016 | Permit id: 2016-118796-000 | |||||
Plumbing renovation at pcc sylvania hp buildingsewer Date: February 9, 2016Permit type: Intake | Permit status: Closed | Completion date: February 9, 2016 | Permit id: 2016-118803-000 | |||||
Plumbing renovationat pcc sylvania cc building phase 32-sinks,1-wall box Date: March 18, 2016Permit type: Intake | Permit status: Closed | Completion date: March 18, 2016 | Permit id: 2016-137431-000 | |||||
B2/install new split system heat pump and (2) indoor head units/outdoor unit to be mounted on wall with bracket. Date: March 23, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139880-000 | |||||
Elec - install new split system heat pump and (2) indoor head units - pwr Permit type: Intake | Permit status: Closed | Completion date: March 26, 2016 | Permit id: 2016-141065-000 | |||||
Stats-install new split system heat pump and (2) indoor head units - stats Date: March 26, 2016Permit type: Intake | Permit status: Closed | Completion date: March 26, 2016 | Permit id: 2016-141066-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Application | Permit status: Approved | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Issuance/intake | Permit status: Intake | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Process management | Permit status: Closed | Completion date: June 23, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Erosion control | Permit status: Approved | Completion date: July 5, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Site development | Permit status: Approved | Completion date: July 5, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Life safety | Permit status: Approved | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Structural | Permit status: Not reqd | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: July 1, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Fire bureau | Permit status: Not reqd | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Environmental services | Permit status: Approved | Completion date: July 11, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Transportation | Permit status: Not reqd | Completion date: July 7, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Transportation | Permit status: Approved | Completion date: July 8, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Transportation | Permit status: Closed | Completion date: July 8, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 22, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Parks bureau | Permit status: Approved | Completion date: July 1, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Permit expiration | Permit status: Extended | Completion date: December 30, 2015 | Permit id: 2011-150363-000 | |||||
Provide power and data to temporary work cubiclesfaxed Date: May 21, 2012Permit type: Electrical inspections | Permit status: Approved | Completion date: October 22, 2015 | Permit id: 2012-142710-000 | |||||
Relocate generator voip iifaxed Date: October 4, 2012Permit type: Electrical inspections | Permit status: Approved | Completion date: October 22, 2015 | Permit id: 2012-190102-000 | |||||
Install fire systemfaxed Date: June 27, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: October 22, 2015 | Permit id: 2013-172960-000 | |||||
Install fire alarmfaxed Date: November 6, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2013-225085-000 | |||||
Replace existing mechanical equipfaxed Date: October 3, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: March 13, 2015 | Permit id: 2014-221245-000 | |||||
F22/ dfs01 for skylight Date: November 4, 2015Permit type: Intake | Permit status: Closed | Completion date: September 30, 2015 | Permit id: 2015-153303-Dfs | |||||
F21/ rev 01 - additional steel support for the new skylight, change to framing Date: November 9, 2015Permit type: Intake | Permit status: Closed | Completion date: October 20, 2015 | Permit id: 2015-153303-Rev | |||||
F19/ phase 3 - revised office layout and associated electrical and mechanical Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: February 18, 2016 | Permit id: 2015-153303-Rev | |||||
F19/revised vav controls, hydronic piping and ductwork correlating with changes on main permit revision 02 (15-153303 rev 02 fa) Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: February 18, 2016 | Permit id: 2015-153304-Rev | |||||
Pwr - phase 2; major renovations to the central east, ne, nw and upper mall areas of multipurpose student services building, concrete work, wall demo, flooring, ceilings, plbg, elec - pwr Date: July 14, 2015Permit type: Intake | Permit status: Closed | Completion date: May 7, 2015 | Permit id: 2015-166876-000 | |||||
Plumbing renovation at pcc sylvania cc building3 sinks, fs Date: July 8, 2015Permit type: Intake | Permit status: Closed | Completion date: May 28, 2015 | Permit id: 2015-177164-000 | |||||
F18/ new equipment, ductwork to existing systems, balance and relocate thermostats Date: July 16, 2015Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-191100-000 | |||||
Pwr - bunker #2 & #3 re-roof project - remove rtus for re-roof and replace same equipment when roofing is complete - pwr Permit type: Intake | Permit status: Closed | Completion date: July 17, 2015 | Permit id: 2015-203263-000 | |||||
B1/ st2 bunker remodel, new entry doors and windows Date: July 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 20, 2015 | Permit id: 2015-203812-000 | |||||
B1/ st2 bunker remodel, new entry door Date: August 20, 2015Permit type: Intake | Permit status: Closed | Completion date: July 20, 2015 | Permit id: 2015-203818-000 | |||||
Add a biodeisel fueling system to existing tanking area adjacent to auto shop Permit type: Application | Permit status: Approved | Completion date: September 17, 2007 | Permit id: 2007-162973-000 | |||||
Add a biodeisel fueling system to existing tanking area adjacent to auto shop Permit type: Planning and zoning | Permit status: Approved | Completion date: September 17, 2007 | Permit id: 2007-162973-000 | |||||
Add a biodeisel fueling system to existing tanking area adjacent to auto shop Permit type: Erosion control | Permit status: Not reqd | Completion date: September 17, 2007 | Permit id: 2007-162973-000 | |||||
Add a biodeisel fueling system to existing tanking area adjacent to auto shop Permit type: Environmental services | Permit status: Approved | Completion date: September 17, 2007 | Permit id: 2007-162973-000 | |||||
B2 level 1, room 1 - divide office # 1 with new wall and door, relocate lighting, mech, electrical Date: July 29, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 29, 2015 | Permit id: 2015-209045-000 | |||||
B2 level 1, room 1 - relocate diffusers Date: August 5, 2015Permit type: Intake | Permit status: Closed | Completion date: July 29, 2015 | Permit id: 2015-209056-000 | |||||
Data fire alarm wiring - phase 2; major renovations to the central east, ne, nw and upper mall areas of multipurpose student services building - data fa wiring Date: August 31, 2015Permit type: Intake | Permit status: Closed | Completion date: August 31, 2015 | Permit id: 2015-228720-000 | |||||
Pwr - radiography dental departments, 2nd & 3rd floors; remodel, new walls, ceiling, cabinets, counters, new equipment and anchoring, finishes, elec - pwr Date: September 9, 2015Permit type: Intake | Permit status: Closed | Completion date: September 9, 2015 | Permit id: 2015-233609-000 | |||||
Voice data - radiography dental departments, 2nd & 3rd floors; remodel - voice data Date: September 11, 2015Permit type: Intake | Permit status: Closed | Completion date: September 11, 2015 | Permit id: 2015-235416-000 | |||||
F19 room 112, replace vav with fan coil, install frequency drive and air balance machine shop Date: October 6, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 6, 2015 | Permit id: 2015-246677-000 | |||||
Voice data - phase 2; major renovations to the central east, ne, nw and upper mall areas of multipurpose student services building - voice data Date: October 22, 2015Permit type: Intake | Permit status: Closed | Completion date: October 22, 2015 | Permit id: 2015-255215-000 | |||||
Control wiring - radiography dental departments, 2nd & 3rd floors;imaging equipment - control wiring Date: October 27, 2015Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-257009-000 | |||||
Pwr controls - room 112, replace vav with fan coil, install frequency drive pwr Date: November 1, 2015Permit type: Intake | Permit status: Closed | Completion date: November 1, 2015 | Permit id: 2015-258922-000 | |||||
Alteration to at&t site to remove (1) gsm 850 19 antenna (3) one per sector (4)gsm 850 19 tmas (12)(4) per sector (1) lte 7 antenna per sector(3) totalreplace with(3)lte 700 19 (1)per sector lte 19 rrh total of 3 Date: February 5, 2016Permit type: Application | Permit status: Approved | Completion date: December 3, 2015 | Permit id: 2015-272396-000 | |||||
B1 server room - replace a c mini split system and outdoor unit in mech room Date: January 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 7, 2016 | Permit id: 2016-102111-000 | |||||
B1 library server room - replace a c min split and outdoor unit in mech room Date: January 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 7, 2016 | Permit id: 2016-102120-000 | |||||
B2 install new split system heat pump and (2) indoor head units outdoor unit to be mounted on wall with bracket. Date: March 23, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139880-000 | |||||
Elec - install new split system heat pump and (2) indoor head units - pwr Permit type: Intake | Permit status: Closed | Completion date: March 26, 2016 | Permit id: 2016-141065-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Application | Permit status: Approved | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Issuance/intake | Permit status: Intake | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Process management | Permit status: Closed | Completion date: June 23, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Erosion control | Permit status: Approved | Completion date: July 5, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Site development | Permit status: Approved | Completion date: July 5, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Life safety | Permit status: Approved | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Structural | Permit status: Not reqd | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: July 1, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Fire bureau | Permit status: Not reqd | Completion date: June 21, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Environmental services | Permit status: Approved | Completion date: July 11, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Transportation | Permit status: Not reqd | Completion date: July 7, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Transportation | Permit status: Approved | Completion date: July 8, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Transportation | Permit status: Closed | Completion date: July 8, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 22, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Parks bureau | Permit status: Approved | Completion date: July 1, 2011 | Permit id: 2011-150363-000 | |||||
Legalize temporary access road and paving - option 1 will approve the eventual removal and replanting of the areas within the environmental zones Permit type: Permit expiration | Permit status: Extended | Completion date: December 30, 2015 | Permit id: 2011-150363-000 | |||||
F7 st bldg renovation phase 2 - 1st floor convert office space into classrooms, 2nd floor convert classrooms into office space and renovate portions of 2nd floor, 3rd floor renovate floor labs Date: October 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 24, 2013 | Permit id: 2013-209239-000 | |||||
F7 st bldg renovation phase 2 modify existing hvac system, provide new exhauast snorkels at labs Date: October 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 24, 2013 | Permit id: 2013-209243-000 | |||||
New ductwork connecting into an existing air handler unit for new enclosed entry, plans w co Date: August 27, 2014Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157023-000 | |||||
F12 ct building - little theater renovation including new stage floor and demo of small room Date: September 4, 2014Permit type: Intake | Permit status: Closed | Completion date: July 31, 2014 | Permit id: 2014-191843-000 | |||||
F18 phase 2 level 2 office space renovation, open office area, conference rooms, computer lab and other spaces Date: September 18, 2014Permit type: Intake | Permit status: Closed | Completion date: August 26, 2014 | Permit id: 2014-204049-000 | |||||
F18 phase 2 level 2 office space renovation - new ductwork, vavs and controls Date: September 18, 2014Permit type: Intake | Permit status: Closed | Completion date: August 26, 2014 | Permit id: 2014-204062-000 | |||||
Voice data - phase 2 level 2 office space renovation, open office area, conference rooms, computer lab and other spaces - voice data Date: February 26, 2015Permit type: Intake | Permit status: Closed | Completion date: September 18, 2014 | Permit id: 2014-214488-000 | |||||
F29 phase 2; major renovations to the central east, ne, nw and upper mall areas of multipurpose student services building, concrete work, wall demo, flooring, ceilings, plbg, elec, etc Date: June 23, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-153303-000 | |||||
F22 dfs01 for skylight Date: November 4, 2015Permit type: Intake | Permit status: Closed | Completion date: September 30, 2015 | Permit id: 2015-153303-Dfs | |||||
F21 rev 01 - additional steel support for the new skylight, change to framing Date: November 9, 2015Permit type: Intake | Permit status: Closed | Completion date: October 20, 2015 | Permit id: 2015-153303-Rev | |||||
F19 phase 3 - revised office layout and associated electrical and mechanical Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: February 18, 2016 | Permit id: 2015-153303-Rev | |||||
F29 new vavs, controls, hydronic piping, ductwork throughout Date: June 23, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-153304-000 | |||||
F19 revised vav controls, hydronic piping and ductwork correlating with changes on main permit revision 02 (15-153303 rev 02 fa) Date: March 7, 2016Permit type: Intake | Permit status: Closed | Completion date: February 18, 2016 | Permit id: 2015-153304-Rev | |||||
B2 gas line to portable kiln Date: May 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 18, 2015 | Permit id: 2015-172520-000 | |||||
B2 gas line to existing portable kiln Date: May 21, 2015Permit type: Intake | Permit status: Closed | Completion date: May 18, 2015 | Permit id: 2015-172541-000 | |||||
B1 bunker #2 & #3 re-roof project - remove rtus for re-roof and replace same equipment when roofing is complete Date: June 12, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 12, 2015 | Permit id: 2015-185316-000 | |||||
F15 kiln yard - seismic bracing (non-structural components) of brick kilns Date: June 19, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2015-188677-000 | |||||
F18 radiography dental departments, 2nd & 3rd floors; remodel, new walls, ceiling, cabinets, counters, new equipment and anchoring, finishes, elec, plbg Date: June 23, 2015Permit type: Reviews | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-191084-000 | |||||
F18 new equipment, ductwork to existing systems, balance and relocate thermostats Date: July 16, 2015Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-191100-000 | |||||
Pwr - bunker #2 & #3 re-roof project - remove rtus for re-roof and replace same equipment when roofing is complete - pwr Permit type: Intake | Permit status: Closed | Completion date: July 17, 2015 | Permit id: 2015-203263-000 | |||||
B1 st2 bunker remodel, new entry doors and windows Date: July 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 20, 2015 | Permit id: 2015-203812-000 | |||||
B1 st2 bunker remodel, new entry door Date: August 20, 2015Permit type: Intake | Permit status: Closed | Completion date: July 20, 2015 | Permit id: 2015-203818-000 | |||||
Build a new 6 sq ft accessory sculpture building for art department Date: August 19, 2003Client: Southwest Neighborhoods, Inc. | Permit type: New construction | Permit status: Final | Completion date: July 5, 2005 | Current use: Business | Permit id: 2002-152652-000 | |||||
Remove (3) existing anntenas and replace w 9 panel ant. Date: November 7, 2005Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: March 1, 2006 | Current use: Utility | Permit id: 2005-130902-000 | |||||
New three story college services building for maintenance shops and admin offices Date: October 24, 2005Client: Southwest Neighborhoods, Inc. | Permit type: New construction | Permit status: Final | Completion date: June 19, 2008 | Current use: Factory/industrial | Permit id: 2005-128108-000 | |||||
24 x 36 detached greenhouse for horticulture use Date: February 24, 2006Client: Southwest Neighborhoods, Inc. | Permit type: New construction | Permit status: Under inspection | Current use: Educational | Permit id: 2005-139020-000 | |||||
Demo gate house Date: August 10, 2006Client: Southwest Neighborhoods, Inc. | Permit type: Demolition | Permit status: Issued | Current use: Educational | Permit id: 2006-153373-000 | |||||
Public safety radio tower Date: January 28, 2009Client: Southwest Neighborhoods, Inc. | Permit type: New construction | Permit status: Final | Completion date: July 14, 2009 | Current use: Utility | Permit id: 2008-163780-000 | |||||
New 648 sf green house used primarily for horticultural or agricultural purposes and not human habitation. Date: January 22, 2010Client: Southwest Neighborhoods, Inc. | Permit type: New construction | Permit status: Final | Completion date: April 5, 2010 | Current use: Utility | Permit id: 2009-148274-000 | |||||
Alter pavement to add solar powered ticket station, reconfigure landscaping, add new bio swale Date: September 16, 2011Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: January 6, 2012 | Current use: Utility | Permit id: 2011-176286-000 | |||||
Install french drain at rear of health technology building at loading dock entrance and tie into existing manhole, pave over new line Date: February 1, 2012Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: June 21, 2012 | Current use: Educational | Permit id: 2012-109368-000 | |||||
Demolish four existing storage containers for future classroom storage Date: September 7, 2012Client: Southwest Neighborhoods, Inc. | Permit type: Demolition | Permit status: Final | Completion date: September 27, 2012 | Current use: Utility | Permit id: 2012-119943-000 | |||||
New exterior elevator to serve 2nd floor of cc building and roof level; associated site work and landscaping Date: April 9, 2013Client: Southwest Neighborhoods, Inc. | Permit type: Addition | Permit status: Final | Completion date: January 8, 2014 | Current use: Educational | Permit id: 2012-207263-000 | |||||
Relocate 3 antennas and adding 6 for total of 9 antennas Date: June 7, 2013Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: December 13, 2013 | Current use: Utility | Permit id: 2013-103661-000 | |||||
New 16 sf open sided structure for kilns and pottery class; 68" high concrete wall at back wall and partial walls at sides; new stormwater planter at entrance, replace 6 fence at perimeter Date: May 28, 2014Client: Southwest Neighborhoods, Inc. | Permit type: New construction | Permit status: Final | Completion date: September 26, 2014 | Current use: Business | Permit id: 2014-115082-000 | |||||
Demolish 5 sf existing open sided kiln shed, remove all debris Date: May 6, 2014Client: Southwest Neighborhoods, Inc. | Permit type: Demolition | Permit status: Final | Completion date: May 16, 2014 | Current use: Storage | Permit id: 2014-115073-000 | |||||
Alteration to at&t site to remove (1) gsm 850 19 antenna (3) one per sector (4)gsm 850 19 tmas (12)(4) per sector (1) lte 7 antenna per sector(3) total replace with(3)lte 700 19 (1)per sector lte 19 rrh total of 3 Date: February 5, 2016Client: Southwest Neighborhoods, Inc. | Permit type: Addition | Permit status: Final | Completion date: December 23, 2016 | Current use: Utility | Permit id: 2015-272396-000 |