| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 9-6-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approval subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing 7. 2 kw pv system on rooftop. Date: August 30, 2017 Contractor: Sme Inc Of SeattlePermit type: Electrical | Permit status: Permit closed | Completion date: October 20, 2017 | Expiration date: August 30, 2018 | Current use: Single family / duplex | Permit id: 6616387 |