Building Permits at 1193 St Marks Avenue Brooklyn NY 11213


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1193 St Marks Avenue Brooklyn NY 11213 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Apartment #1r; north 1 room:- demo the entire defective ceiling in north 1 room approx; 168 sqft and install new sheet rock (water resistant). Co

Permit type: Gc | Permit id: Ef07111
0951193 St Marks Avenue Brooklyn Ny 11213
Apt#: 1. At bath room on the upper level trace and repair concealed water leak at ceiling. And at bath room upper level repair the ceiling with simili
Date:  June 25, 2012

Permit type: Gc | Permit id: Ec32028
2012/06/250951193 St Marks Avenue Brooklyn Ny 11213
Gas heating unit.
Date:  January 25, 2010

Permit type: Heat | Permit id: Ea22852
2010/01/250951193 St Marks Avenue Brooklyn Ny 11213
At apt. # 1 demolish the loose plaster at rear bedroom (n1 room) ceiling approx. 2 sq. Ft. And replace with 5/8 thick sheetrock. Tape and compound.
Date:  October 22, 2014

Permit type: Gc | Permit id: Ef08177
2014/10/220951193 St Marks Avenue Brooklyn Ny 11213
Apt 1: replace with new the refill valve, handle, and flapper ball in order to restore the toilet tank to pwo at the bathroom. Remove all work rela
Date:  April 17, 2012

Permit type: Plumb | Permit id: Ec27319
2012/04/170951193 St Marks Avenue Brooklyn Ny 11213
Cellar :- make all necessary repairs needed to restore the gas fired hot water heater to proper working order. Restore hot water to the entire apt.
Date:  September 23, 2014

Permit type: Heat | Permit id: Ef07110
2014/09/230951193 St Marks Avenue Brooklyn Ny 11213
At apt. # 1 at bedroom (front) demolish approx. 1 sq. Ft. Of loose plaster at ceiling and replace with 5/8 thick sheetrock. Tape and compound. P
Date:  July 16, 2013

Permit type: Gc | Permit id: Ee00611
2013/07/160951193 St Marks Avenue Brooklyn Ny 11213
Apartment #1r; north 1 room:- demo the entire defective ceiling in north 1 room approx; 168 sqft and install new sheet rock (water resistant). Co

Permit type: Gc | Permit id: Ef07111
0951193 St Marks Avenue Brooklyn Ny 11213
Apartment #1r; north 1 room:- demo the entire defective ceiling in north 1 room approx; 168 sqft and install new sheet rock (water resistant). Co

Permit type: Gc | Permit id: Ef07111
0951193 St Marks Avenue Brooklyn Ny 11213
At apt. # 1 at bedroom (front) demolish approx. 1 sq. Ft. Of loose plaster at ceiling and replace with 5 8 thick sheetrock. Tape and compound. P
Date:  July 16, 2013

Permit type: Gc | Permit id: Ee00611
2013/07/160951193 St Marks Avenue Brooklyn Ny 11213
At apt. # 1 demolish the loose plaster at rear bedroom (n1 room) ceiling approx. 2 sq. Ft. And replace with 5 8 thick sheetrock. Tape and compound.
Date:  October 22, 2014

Permit type: Gc | Permit id: Ef08177
2014/10/220951193 St Marks Avenue Brooklyn Ny 11213
Apartment #1r; north 1 room:- demo the entire defective ceiling in north 1 room approx; 168 sqft and install new sheet rock (water resistant). Co

Permit type: Gc | Permit id: Ef07111
0951193 St Marks Avenue Brooklyn Ny 11213
Apartment #1r; north 1 room:- demo the entire defective ceiling in north 1 room approx; 168 sqft and install new sheet rock (water resistant). Co

Permit type: Gc | Permit id: Ef07111
0951193 St Marks Avenue Brooklyn Ny 11213
(apt#1fl): reset hot water to 1 degrees as per h. P. D code remove all work related debris. No s. W. P. Contractor must sign and return bid
Date:  March 14, 2012

Permit type: Plumb | Permit id: Ec24413
2012/03/140951193 St Marks Avenue Brooklyn Ny 11213
1st floor apt. Bedroom. Trace and repair leak coming from apt. Above 1st floor apt. Plaster paint app. 16 sq. Ft. Of ceiling in bedroom. Remove all
Date:  September 2, 2011

Permit type: Gc | Permit id: Ec05618
2011/09/020951193 St Marks Avenue Brooklyn Ny 11213
Apt # 1st fl: replace with new the broken glass pane at lower and upper sash window in the 3rd room from north (bedroom #1) in the 1st floor apartm
Date:  October 19, 2010

Permit type: Gc | Permit id: Eb12488
2010/10/190951193 St Marks Avenue Brooklyn Ny 11213
Provide single fuel drop to the above address with prime and start. #2 fuel- fill 2 gl tank, please report problems immediately to the esb fuel unit
Date:  February 15, 2012

Permit type: Util | Permit id: Ec20899
2012/02/150951193 St Marks Avenue Brooklyn Ny 11213
(apt#1fl) @ basement (gas fired boiler): make all necessary repairs to gas fired boiler. Restore to proper working condition. Restore heat to entire b
Date:  February 23, 2012

Permit type: Heat | Permit id: Ec21347
2012/02/230951193 St Marks Avenue Brooklyn Ny 11213
1st floor apt. Kitchen. Replace drain lines at kitchen sink. Remove all work related debris. Contractor must sign and return bid. Not
Date:  December 19, 2011

Permit type: Plumb | Permit id: Ec15543
2011/12/190951193 St Marks Avenue Brooklyn Ny 11213
(apt#1) @ basement entrance: properly repair the broken/ defective door hinges and lock. Door is off its hinges at bastment front door at public hall,
Date:  March 26, 2012

Permit type: Gc | Permit id: Ec25458
2012/03/260951193 St Marks Avenue Brooklyn Ny 11213
At staircase from ground floor to basement re-secure to stringer the riser & treads 5th & 6th from the top of stairs. Supply and install a new met
Date:  April 29, 2013

Permit type: Gc | Permit id: Ed20888
2013/04/290951193 St Marks Avenue Brooklyn Ny 11213
Install a new glass lite but similar to the vestibule door at 1st floor public hallway. Remove all work related debris. Contractor must sign
Date:  February 3, 2012

Permit type: Gc | Permit id: Ec19538
2012/02/030951193 St Marks Avenue Brooklyn Ny 11213
Cellar: pump out stagnant water and sewage from cellar: clear main sewer house trap - from trap to street and from house trap into building. Pump out
Date:  November 3, 2008

Permit type: Stopag | Permit id: E913676
2008/11/030951193 St Marks Avenue Brooklyn Ny 11213
Move thermostat from 1st floor vacant apartment and install thermostat at second floor hallway. Restore gas boiler to proper working order.
Date:  November 5, 2008

Permit type: Heat | Permit id: E914048
2008/11/050951193 St Marks Avenue Brooklyn Ny 11213
Clear stoppage pump out all raw sewage and stagnant water at basement. Vaccum dry, broom sweep, and spread lime to sanitize. Contractor must

Permit type: Stopag | Permit id: E913782
0951193 St Marks Avenue Brooklyn Ny 11213
Light pilot light to hot water heater in basement, remove all work related debris. Contractor must sign and return bid. Note: contractor
Date:  April 18, 2013
Value:   $54

Permit type: Gc | Permit id: Ed20890
2013/04/1854951193 St Marks Avenue Brooklyn Ny 11213
Boiler room: adjust the temperature control knob for the water heater to 1 degree ferh. Supply hot water to the fixtures at apartment #2. Remove all
Date:  January 27, 2010
Value:   $29

Permit type: Heat | Permit id: Ea24075
2010/01/2729951193 St Marks Avenue Brooklyn Ny 11213
Public area : at public hall : install (1) balluster on 1st flight of stairs 4th tread. Remove all work related debris.
Date:  July 2, 2007
Value:   $125

Permit type: Gc | Permit id: E734469
2007/07/02125951193 St Marks Avenue Brooklyn Ny 11213
Clear stoppage pump out all raw sewage and stagnant water at basement. Vaccum dry, broom sweep, and spread lime to sanitize. Contractor must

Permit type: Stopag | Permit id: E913782
0951193 St Marks Avenue Brooklyn Ny 11213
Clear stoppage pump out all raw sewage and stagnant water at basement. Vaccum dry, broom sweep, and spread lime to sanitize. Contractor must

Permit type: Stopag | Permit id: E913782
0951193 St Marks Avenue Brooklyn Ny 11213
Clear stoppage pump out all raw sewage and stagnant water at basement. Vaccum dry, broom sweep, and spread lime to sanitize. Contractor must

Permit type: Stopag | Permit id: E913782
0951193 St Marks Avenue Brooklyn Ny 11213
(apt#1) @ basement entrance: properly repair the broken defective door hinges and lock. Door is off its hinges at bastment front door at public hall,
Date:  March 26, 2012

Permit type: Gc | Permit id: Ec25458
2012/03/260951193 St Marks Avenue Brooklyn Ny 11213
Clear stoppage pump out all raw sewage and stagnant water at basement. Vaccum dry, broom sweep, and spread lime to sanitize. Contractor must

Permit type: Stopag | Permit id: E913782
0951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler/hot water heater
Date:  September 4, 2009

Permit type: Util | Permit id: Ea08864
2009/09/040951193 St Marks Avenue Brooklyn Ny 11213
Apartment #2 bedroom #1. Demo , provide and install ne
Date:  July 28, 2009

Permit type: Gc | Permit id: Ea04575
2009/07/280951193 St Marks Avenue Brooklyn Ny 11213
Roof/ apt. 2. Cut out all blisters and nail down. Install app. 1625 sq ft. Of lb. Cap sheet over entire roof. Flash all roof penetrations. Repair app
Date:  June 7, 2011

Permit type: Gc | Permit id: Eb33215
2011/06/070951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler/hot water heater
Date:  July 1, 2012

Permit type: Util | Permit id: Ed00908
2012/07/010951193 St Marks Avenue Brooklyn Ny 11213
As per rc # 2010000114501 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, 59 ft of pipe insulat
Date:  October 9, 2009

Permit type: Asbest | Permit id: Ea12542
2009/10/090951193 St Marks Avenue Brooklyn Ny 11213
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio
Date:  June 30, 2011

Permit type: Delead | Permit id: Eb35485
2011/06/300951193 St Marks Avenue Brooklyn Ny 11213
Apt 2: at the bathroom replace with new the defective water closet set complete. Remove all work related debris. Contractor must sign and retu
Date:  February 17, 2012

Permit type: Plumb | Permit id: Ec20891
2012/02/170951193 St Marks Avenue Brooklyn Ny 11213
Make all corrections to boiler and hot water heater to bring to code. Pay any additional to d. O. B. Inconjunction with omo#ea10660. Note: contract
Date:  October 13, 2009

Permit type: Plumb | Permit id: Ea12385
2009/10/130951193 St Marks Avenue Brooklyn Ny 11213
Apt # 1: 1. Trace, locate and repair water leak from bathroom the ceiling located at 1st floor apartment. Repair ceiling with sheetrock sft. Tape
Date:  October 6, 2010

Permit type: Gc | Permit id: Eb10746
2010/10/060951193 St Marks Avenue Brooklyn Ny 11213
As per mini rc # 2010000181801 (cuno enviornmental corp,) perform air sampling and analysis in accordance with hpd mini requirement contract specific
Date:  November 12, 2009

Permit type: Asbest | Permit id: Ea12544
2009/11/120951193 St Marks Avenue Brooklyn Ny 11213
#2oil boiler: make all necessary repairs to #2 oil boiler to restore to proper working order to provide an adequate supply of heat to all the apart
Date:  January 26, 2011

Permit type: Heat | Permit id: Eb20809
2011/01/260951193 St Marks Avenue Brooklyn Ny 11213
At apt 2 - in bathroom: repair the 3 piece shower body with new seats, washers,spindles,sleeves,escutchions etc. Remove all work related debris
Date:  April 23, 2013

Permit type: Gc | Permit id: Ed20889
2013/04/230951193 St Marks Avenue Brooklyn Ny 11213
At apartment #2 clear the stoppage in the bathtub at the bathroom . Remove all work related debris. Contractor must sign and return bid
Date:  November 29, 2010

Permit type: Stopag | Permit id: Eb15855
2010/11/290951193 St Marks Avenue Brooklyn Ny 11213
Apt. #2 @ living room/ bathroom. Plaster and paint app. 14 sq. Ft. Of living room ceiling and app. 4 sq. Ft. Of bathroom ceiling. Remove all work
Date:  April 11, 2011

Permit type: Gc | Permit id: Eb27634
2011/04/110951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler/hot water heater
Date:  July 1, 2013

Permit type: Util | Permit id: Ee02799
2013/07/010951193 St Marks Avenue Brooklyn Ny 11213
Install (2) gas line and meter bars. Install new flue pipe to hot water heater and boiler. Replace flute in chimmey and check for leak. Make all ne
Date:  December 1, 2009

Permit type: Plumb | Permit id: Ea17357
2009/12/010951193 St Marks Avenue Brooklyn Ny 11213
-clear main sewer house trap from trap to street and from house trap into building. Pump out all water and sewage from basement vacuum dry spread lim
Date:  January 28, 2011

Permit type: Stopag | Permit id: Eb20808
2011/01/280951193 St Marks Avenue Brooklyn Ny 11213
As per mini rc # 2010000070201 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 02 samples for asbestos content uti
Date:  October 8, 2009

Permit type: Asbest | Permit id: Ea12538
2009/10/080951193 St Marks Avenue Brooklyn Ny 11213
Cellar. Provide proper sized meter bar, with locking gas cock, at cellar to accept gas meter for heat and hot water. File job, pressure test piping to
Date:  September 29, 2009

Permit type: Plumb | Permit id: Ea10660
2009/09/290951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler/hot water heater
Date:  July 1, 2010

Permit type: Util | Permit id: Eb02911
2010/07/010951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler/hot water heater
Date:  July 1, 2011

Permit type: Util | Permit id: Ec00479
2011/07/010951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler/hot water heater
Date:  July 1, 2014

Permit type: Util | Permit id: Ef01837
2014/07/010951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler hot water heater
Date:  March 6, 2012

Permit type: Util | Permit id: Ec22788
2012/03/060951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler hot water heater
Date:  July 1, 2014

Permit type: Util | Permit id: Ef01837
2014/07/010951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler hot water heater
Date:  July 1, 2011

Permit type: Util | Permit id: Ec00479
2011/07/010951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler hot water heater
Date:  July 1, 2010

Permit type: Util | Permit id: Eb02911
2010/07/010951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler hot water heater
Date:  July 1, 2013

Permit type: Util | Permit id: Ee02799
2013/07/010951193 St Marks Avenue Brooklyn Ny 11213
Apt. #2 @ living room bathroom. Plaster and paint app. 14 sq. Ft. Of living room ceiling and app. 4 sq. Ft. Of bathroom ceiling. Remove all work
Date:  April 11, 2011

Permit type: Gc | Permit id: Eb27634
2011/04/110951193 St Marks Avenue Brooklyn Ny 11213
Roof apt. 2. Cut out all blisters and nail down. Install app. 1625 sq ft. Of lb. Cap sheet over entire roof. Flash all roof penetrations. Repair app
Date:  June 7, 2011

Permit type: Gc | Permit id: Eb33215
2011/06/070951193 St Marks Avenue Brooklyn Ny 11213
Nationalgrid provide gas to boiler hot water heater
Date:  September 4, 2009

Permit type: Util | Permit id: Ea08864
2009/09/040951193 St Marks Avenue Brooklyn Ny 11213
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.