For access to cellar . Contact super ,call mr abraham 718 501 80 replace defective water feeder to gas boiler and restore to proper working orde Date: December 15, 2015Permit type: Heat | Permit id: Eg08320 | |||||
Job description: perform extermination for bedbug infestation in the follow apartment and locations: in apartment 1f, 2f, 2r and 3f, treat for bed b Date: July 28, 2015Permit type: Exterm | Permit id: Eg01202 | |||||
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar at cellar . Total yards alternative enforcement p Date: November 10, 2015Permit type: Gc | Permit id: Eg06612 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2014Permit type: Util | Permit id: Ef02476 | |||||
7a program contact : super, abrahan at 718 807 -80 1) install temporary 4x 4 shoring 12 . O. C. Under apt 1f , bathroom area, with two row Date: February 11, 2016Permit type: Gc | Permit id: Eg11738 | |||||
Bldg make all necessary repairs in order to repair cold water leak at riser at front of bldg between 1st and 2nd floor effecting the basemnet 1 inch Date: February 18, 2015Permit type: Plumb | Permit id: Ef15579 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: June 14, 2011Permit type: Util | Permit id: Eb34020 | |||||
7a referral for payment purposes only bsmt: make all necessary repairs to gas fired boiler to restore to proper working condition. Correct wiring on Date: October 31, 2013Permit type: Heat | Permit id: Ee09343 | |||||
Work at cellar : 1) replace , separate the broken defective 3/4 cold water line and check valve to boiler work in apt 2r (second floor) 2) Date: November 30, 2015Permit type: Plumb | Permit id: Eg06616 | |||||
Heat related replace with new defective return pipe to boiler at cellar and boiler room appr. 55 l. F restore boiler to pwo. Restore h Date: October 20, 2014Permit type: Plumb | Permit id: Ef08556 | |||||
Basement and boiler room 1. Clear main sewer house trap from trap to street . Pump out all water and sewage from basement and boile Date: March 12, 2015Permit type: Stopag | Permit id: Ef16858 | |||||
As per mini rc # 2015000226603 (cardno atc), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification o Date: April 28, 2015Permit type: Asbest | Permit id: Ef19885 | |||||
Gas fired boiler: make all necessary repairs to gas fired boiler. Replace drain cock, install new low water cutoff, install new thermostat, install Date: February 25, 2015Permit type: Heat | Permit id: Ef16128 | |||||
As per mini rc # 2015000226603 (cardno atc) and hpd specification, perform polarized light microscopy (plm) analysis of 6 samples for asbestos conten Date: April 28, 2015Permit type: Asbest | Permit id: Ef19884 | |||||
7a program contact : super, abrahan at 718 807 -80 1) properly repair the broken or defective metal door at entrance to building .(reset and Date: February 3, 2016Permit type: Gc | Permit id: Eg10040 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2012Permit type: Util | Permit id: Ed01627 | |||||
1) snake out, clear obstruction in sewer line. Clean and disinfect affected cellar area. 2) provide a video recording of the sewer line from the Date: September 11, 2015Permit type: Stopag | Permit id: Eg03321 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2013Permit type: Util | Permit id: Ee01554 | |||||
Public parts : properly repair the building entrance door and install mortise lock at the entrance door . Also properly repair the vestibule door . Date: March 26, 2015Permit type: Gc | Permit id: Ef17844 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: March 6, 2012Permit type: Util | Permit id: Ec23264 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2013Permit type: Util | Permit id: Ee01554 | |||||
Work at cellar : 1) replace , separate the broken defective 3 4 cold water line and check valve to boiler work in apt 2r (second floor) 2) Date: November 30, 2015Permit type: Plumb | Permit id: Eg06616 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2011Permit type: Util | Permit id: Ec02208 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2014Permit type: Util | Permit id: Ef02476 | |||||
Remove the accumulation of refuse and or rubbish and maintain in a clean condition the cellar at cellar . Total yards alternative enforcement p Date: November 10, 2015Permit type: Gc | Permit id: Eg06612 | |||||
SCORE 100 Plumbing Date: November 29, 2017 Contractor: Top Dog Plbg And Htg CorpPermit status: Permit issued | Permit id: 32152896801 | |||||
SCORE 100 Equipment work Date: August 8, 2017 Contractor: A And A Building ConsultantsPermit status: Permit issued | Permit id: 32152896801 | |||||
SCORE 100 Date: August 8, 2017 Contractor: Antonio JaramilloClient: Shapsi Pfeifer | Client Address: 3 Roebling Street Brooklyn Ny 11211 | Client Phone: (908) 783-8251 | Client Company: Ralph Avenue Estates Llc | Permit status: Initial | Permit id: 321528968 | |||||
SCORE 99 Date: November 29, 2017 Contractor: Duane PoladianClient: Shapsi Pfeifer | Client Address: 3 Roebling Street Brooklyn Ny 11211 | Client Phone: (908) 783-8251 | Client Company: Ralph Avenue Estates Llc | Permit status: Initial | Permit id: 321528968 | |||||
Apt. 1f>>>>> trace, locate and repair water leak in north bathroom from above. Restore ceilimg appr. 26 s. F. With sheetrock. Tape,compound Date: December 28, 2015Permit type: Gc | Permit id: Eg09323 | |||||
National grid provide gas to boiler / hot water heater. Date: March 26, 2010Permit type: Util | Permit id: Eb02835 | |||||
P/i new gas meter bar and reconnect existing 1 1/2 gas line for existing boilr and hot water heater. File with building department and coordinate w Date: March 22, 2010Permit type: Plumb | Permit id: Ea29612 | |||||
National grid provide gas to boiler / hot water heater. Date: March 6, 2012Permit type: Util | Permit id: Ec23061 | |||||
Apt 1f: exterminate entire apartment for roaches. Call nikolaos leonardos for access 718. 238. 7297 remove all work related debris. Contrac Date: December 11, 2014Permit type: Exterm | Permit id: Ef11519 | |||||
Apt 1f: as per the requirements contract with hpd, provide and install (6) window guards throughout entire apartment. Remove all work related deb Date: April 16, 2012Permit type: Gc | Permit id: Ec26359 | |||||
At apt 1f: trace and repair the concealed source of water leaks at apt 2f affecting apartment 1f at both bathrooms in each apartment. At apt. 1f: rep Permit type: Plumb | Permit id: Eg00107 | |||||
National grid provide gas to boiler / hot water heater. Date: July 1, 2013Permit type: Util | Permit id: Ee02042 | |||||
Note: work in apt 1f. Contact # 1) remove loose (unkeyed) loose gwb at #2 bath ceiling and wall over the bath door. Approx. 48sf, completed finish ta Permit type: Gc | Permit id: Eg13300 | |||||
119 ralph ave. As per requirement contract specification, remove malfunctioning hot water tank at cellars boiler room and replace it with one of Date: August 18, 2015Permit type: Heat | Permit id: Eg02262 | |||||
National grid provide gas to boiler / hot water heater. Date: July 1, 2011Permit type: Util | Permit id: Ec01442 | |||||
Due to the damage by the fdny trying to gain access at apartment 1f and 2f , repair or replace apartment entrance door complete with mortise lock an Date: August 3, 2015Permit type: Gc | Permit id: Eg00108 | |||||
Contact : latashe christopher tel# 718 440-0171 1) repair the broken or defective connection waste line at sink in the kitchen located at apt 1 Date: February 5, 2016Permit type: Stopag | Permit id: Eg11742 | |||||
National grid provide gas to boiler / hot water heater. Date: July 1, 2014Permit type: Util | Permit id: Ef02054 | |||||
Apt # 1f @ south bathroom : replace with new the defective and leaky faucet at washbasin at south bathroom and restore washbasin to proper working con Date: August 10, 2015Permit type: Plumb | Permit id: Eg01136 | |||||
Vendor was called on site to investigate a leak from the f line. The 7a administrator was on site to facilitate access. Fdny shut off the water Date: July 23, 2015Permit type: Plumb | Permit id: Eg01022 | |||||
At apt 1f: trace and repair the concealed source of water leaks at apt 2f affecting apartment 1f at both bathrooms in each apartment. At apt. 1f: rep Permit type: Plumb | Permit id: Eg00107 | |||||
Note: work in apt 1f. Contact # 1) remove loose (unkeyed) loose gwb at #2 bath ceiling and wall over the bath door. Approx. 48sf, completed finish ta Permit type: Gc | Permit id: Eg13300 | |||||
Note: work in apt 1f. Contact # 1) remove loose (unkeyed) loose gwb at #2 bath ceiling and wall over the bath door. Approx. 48sf, completed finish ta Permit type: Gc | Permit id: Eg13300 | |||||
At apt 1f: trace and repair the concealed source of water leaks at apt 2f affecting apartment 1f at both bathrooms in each apartment. At apt. 1f: rep Permit type: Plumb | Permit id: Eg00107 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2014Permit type: Util | Permit id: Ef02054 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2011Permit type: Util | Permit id: Ec01442 | |||||
Note: work in apt 1f. Contact # 1) remove loose (unkeyed) loose gwb at #2 bath ceiling and wall over the bath door. Approx. 48sf, completed finish ta Permit type: Gc | Permit id: Eg13300 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2012Permit type: Util | Permit id: Ed00801 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2013Permit type: Util | Permit id: Ee02042 | |||||
National grid provide gas to boiler hot water heater. Date: March 24, 2010Permit type: Util | Permit id: Ea30159 | |||||
At apt 1f: trace and repair the concealed source of water leaks at apt 2f affecting apartment 1f at both bathrooms in each apartment. At apt. 1f: rep Permit type: Plumb | Permit id: Eg00107 | |||||
P i new gas meter bar and reconnect existing 1 1 2 gas line for existing boilr and hot water heater. File with building department and coordinate w Date: March 22, 2010Permit type: Plumb | Permit id: Ea29612 | |||||
Note: work in apt 1f. Contact # 1) remove loose (unkeyed) loose gwb at #2 bath ceiling and wall over the bath door. Approx. 48sf, completed finish ta Permit type: Gc | Permit id: Eg13300 | |||||
At apt 1f: trace and repair the concealed source of water leaks at apt 2f affecting apartment 1f at both bathrooms in each apartment. At apt. 1f: rep Permit type: Plumb | Permit id: Eg00107 |