ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Building permit# 336052 Date: July 12, 2004Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 351325 | |||||
Garage addition Date: March 4, 2004 Value: $40,000Permit type: Building residential permit | Permit status: Finaled | Current use: Residential accessorystructure | Permit id: 336052 | |||||
Dw permit: construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 01 Date: November 3, 2008Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 259901 | |||||
On piping rock drive (#119) construct conduit, install cable and associated equipment in accordance with pepco plan id#53023242. >>>pre-construction meeting required>>pre-construction meeting required>pre-construction meeting requiredpre-construction meeting required<< Date: May 17, 2004Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 229414 | |||||
Under the pavement cut moratorium until 6/15/16. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Install gas service in accordance with washington gas plan no. 323433. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector pr Date: June 2, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 314909 |