ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: April 26, 2006Permit status: Finaled | Current use: Single family dwelling | Permit id: 418970 | |||||
Electrical permit Date: March 9, 2007Permit status: Finaled | Current use: Single family dwelling | Permit id: 447089 | |||||
Building permit# 423965 Date: August 2, 2006Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 429050 | |||||
Basement crawl space Date: November 14, 2005 Value: $37,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 403616 | |||||
Relocating bathroom, bedroom, and window seat Date: June 13, 2006 Value: $20,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 423965 | |||||
Detached garage Date: August 17, 2006 Value: $4,000Permit type: Building residential permit | Permit status: Finaled | Current use: Garage | Permit id: 430610 | |||||
Addition Date: December 28, 2006 Value: $35,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 437499 | |||||
Hot tub 40-sqft and fence 6-0"". Date: May 16, 2007 Value: $5,000Permit type: Building residential permit | Permit status: Issued | Current use: Hot tub | Permit id: 453522 | |||||
Install gas service in accordance with washington gas plan no. 492833. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: March 19, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 332557 |