Abandon gas service in accordance with washington gas plan no. 701506. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: September 2, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354226 | |||||
Relocating 1 pole and associated equipment away from proposed entrance to new wheaton libraryin accordance with pepco plan no. 3507183. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: July 11, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 353239 | |||||
Building-257926 wheaton library Date: October 1, 2001Permit type: Electrical permit | Permit status: Issued | Current use: Educational building | Permit id: 259756 | |||||
Abandongas service in accordance with washington gas plan no. 677189. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: June 21, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 352676 | |||||
Low voltage only/wheaton public library Date: January 26, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Educational building | Permit id: 589654 | |||||
Customer wants to use eplans,this is a new construction 2 story library and recreation center with a one story underground garage. There is some early site/ civil work being done to relocate hermitage ave, this is being handled in the civil permits. Karens case.... Value: $52,000,000Permit type: Commercial building | Permit status: Open | Current use: Assembly building | Permit id: 742325 | |||||
Demo library Permit type: Demolition or move permit | Permit status: Open | Current use: Business building | Permit id: 741201 |