ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Install a roof/sump pump within the county right of way wiht the following conditions: roof/sump pump drain will be connected into the county storm drain structure or pipe as directed by the dps field inspector. Date: October 17, 2003Permit type: Public right of way | Permit status: Finaled | Current use: Public right-of-way | Permit id: 224828 |