ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild bond tracking ps13a58770 Date: May 3, 2013Permit type: Demolition or move p | Permit status: Finaled | Completion date: May 29, 2013 | Current use: Single family dwelling | Permit id: 628060 | |||||
Manual j submitted Date: July 31, 2013Permit type: Mechanical permit | Permit status: Finaled | Completion date: December 16, 2013 | Current use: Single family dwelling | Permit id: 642223 | |||||
Electrical permit Date: July 27, 2012Permit status: Finaled | Current use: Single family dwelling | Permit id: 606641 | |||||
200amp temp pole Date: December 27, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 621996 | |||||
400amp new home Date: May 23, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 636155 | |||||
Generator Date: October 16, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 651788 | |||||
Construct mcdot standard: mc-301. 03 type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. Date: March 12, 2013Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 289695 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Install gas service in accordance with washington gas plan no. 177721. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Date: July 3, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 296284 | |||||
Dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3413973. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row Date: August 21, 2013Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 299384 | |||||
Per applicant- exact replacement Date: July 8, 2015Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 719454 | |||||
Per applicant- exactreplacement Date: July 8, 2015Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 719454 | |||||
Install gas service in accordance with washington gas plan no. 415834. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 25, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 325615 |