ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
In apt. 1 supply and install a new vanity complete with faucet and all needed piping. Note: contractor must contact hpd @ (718) 636-3015, 30 Date: December 6, 2010Permit type: Gc | Permit id: Eb15948 | |||||
Apt. 1 trace and repair leak coming from apt. Over apt. 1. Repair app. 40sq. Ft. Of kitchen ceiling and paint. Note: contractor must contact hpd @ (718) 636 Date: December 6, 2010Permit type: Gc | Permit id: Eb15951 | |||||
Apt#; 3. Replace broken defective shower body with new anti scalding shower body complete with all restoration to wall including tile replacement. Thi Date: September 23, 2010Permit type: Gc | Permit id: Eb09065 | |||||
Public area: (south side yard); remove (1) refigerator and (2) doors from yard. Remove all work related debris. No s. W. P. Contractor must sig Date: September 4, 2009Permit type: Gc | Permit id: Ea07868 | |||||
Pump out stagnant water and sewage from cellar: clear main sewer house trap from trap to street and from house trap into building. Pump out all water Date: January 25, 2011Permit type: Stopag | Permit id: Eb20697 | |||||
P/a@ bsmt. Stairs. Install wooden treads #1 and #6 from bottom at stairs leading to bsmt. Note: contractor must contact hpd @ (718) 636-3015, 3024, 30 Date: December 3, 2010Permit type: Gc | Permit id: Eb15952 | |||||
As per mini rc # 2010000070201 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 01 samples for asbestos content uti Date: March 16, 2010Permit type: Asbest | Permit id: Ea28897 | |||||
As per mini rc # 2010000181801 (cuno environmental corp) perform air sampling and analysis in accordance with hpd mini requirement contract specifica Date: March 30, 2010Permit type: Asbest | Permit id: Ea28899 | |||||
As per rc # 2010000115001 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on 18 ft of pipe insu Date: March 17, 2010Permit type: Asbest | Permit id: Ea28898 | |||||
Complete rewire of boiler, install new 24 volt transfer. Install new probe cut off. Repair leak on cold water feed piping. Make all necessary rep Date: December 13, 2010Permit type: Heat | Permit id: Eb16656 | |||||
At building: supply and install a new gallon a. O. Smith hot water heater complete with flue. Restore hot water to the building. Remove work relat Date: March 15, 2010Permit type: Heat | Permit id: Ea28734 | |||||
Nationalgrid provide gas to boiler/hot watr heater Date: March 6, 2012Permit type: Util | Permit id: Ec23104 | |||||
Make all necessary repairs to gas fired boiler to restore to proper working order. Restore heat to entire building. Note:contractor must contact h Date: November 21, 2008Permit type: Heat | Permit id: E915196 | |||||
At apt# 2 bathroom replace defective showerbody with anti scald type with trim and restorations of areas affected by plumbing repairs, restore water Date: November 16, 2010Permit type: Gc | Permit id: Eb14542 | |||||
Nationalgrid provide gas to boiler/hot watr heater Date: July 1, 2011Permit type: Util | Permit id: Ec01036 | |||||
Nationalgrid provide gas to boiler/hot watr heater Date: July 1, 2010Permit type: Util | Permit id: Eb02547 | |||||
Nationalgrid provide gas to boiler/hot watr heater Date: July 1, 2009Permit type: Util | Permit id: Ea02280 | |||||
Nationalgrid provide gas to boiler/hot watr heater Date: September 12, 2008Permit type: Util | Permit id: E908894 |