Pre-construction meeting required contact mc. Dps inspector chris cary @ 301-370-3686 erect one new pole, excavate and backfill trench, build conduit, install cable, string overhead wire and associated equipment. Utility poles installed, replaced or relocated shall be placed in accordance with the "montgomery county specifications for utility construction permit" dated july, 2003. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Notify mc. Dps inspector when work is complete utility representative: ap @ 301-548-4325 pepco #53056311 Date: November 3, 2004Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 232298 |