New construction 6 story apartment, first floor pt deck wood framing up next five floors Date: March 10, 2015Permit type: Intake | Permit status: Closed | Completion date: March 6, 2015 | Permit id: 2015-129549-000 | |||||
Gas piping to 7 outlets, plans w/co Date: March 10, 2015Permit type: Intake | Permit status: Closed | Completion date: March 10, 2015 | Permit id: 2015-131081-000 | |||||
San: 284 lf of 9 vsp main, approx d=9, in sw market st. Contractor shall build new branch per std p-262 and tap smh abq101 (approx d=9). Can allow pipe slope to 1% due to conflict w/utilities. Contractor to verify all depths and locations in field. Contact x37869 Date: April 10, 2015Permit type: Intake | Permit status: Closed | Completion date: April 10, 2015 | Permit id: 2015-147519-000 | |||||
Stm: 259 lf of 18 csp main, approx d=12, in sw market st. Contractor shall build new 6 branch per std p-262 and tap storm-only sewer. Contractor to verify all depths and locations in field. Contact x37869 Date: April 10, 2015Permit type: Intake | Permit status: Closed | Completion date: April 10, 2015 | Permit id: 2015-147521-000 | |||||
62 unit building. Largest unit is 9 sqft - oar 918 reduced fees apply only to residential units. Date: April 29, 2015Permit type: Intake | Permit status: Closed | Completion date: April 15, 2015 | Permit id: 2015-149625-000 | |||||
Sprinkler - install new fire suppression systems in new 6 story bldgincluding fire pump, manual wet standpipe, and combo standpipe, u/g to 5 out Date: May 26, 2015Permit type: Intake | Permit status: Approved | Completion date: April 16, 2015 | Permit id: 2015-149891-000 | |||||
Hourly inspection for underground conduit Date: April 27, 2015Permit type: Intake | Permit status: Closed | Completion date: April 27, 2015 | Permit id: 2015-159467-000 | |||||
Alarm - install fire alarm system in new 6 story apt bldg Date: June 2, 2015Permit type: Intake | Permit status: Approved | Completion date: May 1, 2015 | Permit id: 2015-162388-000 | |||||
54,0 sf, 6 story apartment building (5/1) Date: February 24, 2015Permit type: Application | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-206964-000 | |||||
Dfs for continuous rod hold down system Date: June 4, 2015Permit type: Application | Permit status: Approved | Completion date: April 17, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for post tension Date: June 11, 2015Permit type: Application | Permit status: Approved | Completion date: April 27, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Application | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Issuance/intake | Permit status: Intake | Completion date: June 5, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Process management | Permit status: Closed | Completion date: June 8, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Planning and zoning | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Life safety | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Structural | Permit status: Required | Completion date: July 6, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 3 : for precast concrete and attachments Permit type: Special inspections review | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Permit type: Application | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Permit type: Issuance/intake | Permit status: Intake | Completion date: June 19, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Permit type: Process management | Permit status: Closed | Completion date: June 22, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Permit type: Planning and zoning | Permit status: Approved | Completion date: June 22, 2015 | Permit id: 2014-206964-Dfs | |||||
Garage exhaust, 8. 5-ton gas pack for corridors, heat pump splits and pthps for apartments, restroom and kitchen subduct exhaust, dryer subduct on e-pwr, elevator vent w/mod interlocked w/fa, see 14-206964-co for plans Date: February 24, 2015Permit type: Intake | Permit status: Closed | Completion date: November 18, 2014 | Permit id: 2014-206969-000 | |||||
Hazardous/tank - installation of sub-base diesel fuel tank for an emergency generator. Date: July 24, 2015Permit type: Intake | Permit status: Approved | Completion date: July 23, 2015 | Permit id: 2015-206248-000 | |||||
Alarm-install of emergency responder radio system as per 5 fire code Date: March 16, 2016Permit type: Intake | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2016-123555-000 | |||||
Install (1) non-illuminated fascia sign, 3. 2 sq ft, south elevation. Date: March 4, 2016Permit type: Intake | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2016-127782-000 | |||||
Das system Date: March 8, 2016Permit type: Electrical inspections | Permit status: Approved | Completion date: March 18, 2016 | Permit id: 2016-131766-000 | |||||
Adding (1) dogwash sink and (2) backflow devices. Date: April 4, 2016Permit type: Intake | Permit status: Closed | Completion date: April 4, 2016 | Permit id: 2016-144911-000 | |||||
Installation of car parking lifts Date: April 19, 2016Permit type: Electrical inspections | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2016-155032-000 | |||||
Dfs 3 : for precast concrete and attachments Date: July 22, 2015Permit type: Application | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for aluminum storefront windows and doors Date: July 22, 2015Permit type: Application | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 5 : glass canopies over steel structure Date: September 24, 2015Permit type: Application | Permit status: Approved | Completion date: August 4, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs 6 : mechanical parking devices Date: September 11, 2015Permit type: Application | Permit status: Approved | Completion date: August 7, 2015 | Permit id: 2014-206964-Dfs | |||||
Dfs for attachment of equipment Date: November 30, 2015Permit type: Application | Permit status: Approved | Completion date: August 11, 2015 | Permit id: 2014-206964-Dfs | |||||
Revision to room 505, 5th floor joists and hangers redesigned to support concrete houskeeping pad loads and waterheaters. See documents for kga description Date: November 30, 2015Permit type: Application | Permit status: Approved | Completion date: October 16, 2015 | Permit id: 2014-206964-Rev | |||||
Revise permit for rfi and rfi 20. 1 revisions on sheet a712 show that masonry ledgers angles have plywood backup instead of gypsum sheating. Revise for rfi 154 to show the connections at the roof that have been clarified on drawing a/s110. Date: December 18, 2015Permit type: Application | Permit status: Approved | Completion date: November 3, 2015 | Permit id: 2014-206964-Rev | |||||
2 amp - 3 phase - temporary servicefor construction power Date: March 10, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: July 23, 2015 | Permit id: 2015-131589-000 | |||||
4th floor low volt wiring and hvac controls Date: March 12, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 15, 2015 | Permit id: 2015-132659-000 | |||||
5th floor low volt wiring and hvac controls Date: March 12, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 9, 2015 | Permit id: 2015-132664-000 | |||||
Hazardous tank - installation of sub-base diesel fuel tank for an emergency generator. Date: July 24, 2015Permit type: Intake | Permit status: Approved | Completion date: July 23, 2015 | Permit id: 2015-206248-000 | |||||
54,0 sf, 6 story apartment building (5 1) Date: February 24, 2015Permit type: Application | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-206964-000 | |||||
Revise permit for rfi and rfi 20. 1 revisions on sheet a712 show that masonry ledgers angles have plywood backup instead of gypsum sheating. Revise for rfi 154 to show the connections at the roof that have been clarified on drawing a s110. Date: December 18, 2015Permit type: Application | Permit status: Approved | Completion date: November 3, 2015 | Permit id: 2014-206964-Rev | |||||
Garage exhaust, 8. 5-ton gas pack for corridors, heat pump splits and pthps for apartments, restroom and kitchen subduct exhaust, dryer subduct on e-pwr, elevator vent w mod interlocked w fa, see 14-206964-co for plans Date: February 24, 2015Permit type: Intake | Permit status: Closed | Completion date: November 18, 2014 | Permit id: 2014-206969-000 | |||||
Gas piping to 7 outlets, plans w co Date: March 10, 2015Permit type: Intake | Permit status: Closed | Completion date: March 10, 2015 | Permit id: 2015-131081-000 | |||||
San: 284 lf of 9 vsp main, approx d=9, in sw market st. Contractor shall build new branch per std p-262 and tap smh abq101 (approx d=9). Can allow pipe slope to 1% due to conflict w utilities. Contractor to verify all depths and locations in field. Contact x37869 Date: April 10, 2015Permit type: Intake | Permit status: Closed | Completion date: April 10, 2015 | Permit id: 2015-147519-000 | |||||
Sprinkler - install new fire suppression systems in new 6 story bldgincluding fire pump, manual wet standpipe, and combo standpipe, u g to 5 out Date: May 26, 2015Permit type: Intake | Permit status: Approved | Completion date: April 16, 2015 | Permit id: 2015-149891-000 |