ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: August 13, 2002Permit status: Finaled | Completion date: August 16, 2002 | Current use: Single family dwelling | Permit id: 285095 | |||||
Shed Date: April 18, 2008 Value: $1,600Permit type: Building residential | Permit status: Issued | Current use: Shed | Permit id: 482986 | |||||
Shed Date: April 15, 2013 Value: $1,300Permit type: Building residential permit | Permit status: Finaled | Current use: Shed | Permit id: 631563 | |||||
On mitscher st (house #11110) provide access from sewer manholes to rehab 8 inch sewer main by installing a liner inside pipe in accordance with wssc plan ci3980a04 and specifications. Construct utility pavement patch in kind as directed. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current maryland state highway administration (msha) specifications and montgomery county specifications for utility construction permit. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector chris cary at 301-370-3686 before and after installation. Date: April 9, 2007Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 252268 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree
|