ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Fire alarm - add fire alarm system to block 100 Date: December 23, 2014Permit type: Intake | Permit status: Approved | Completion date: November 18, 2014 | Permit id: 2014-238720-000 | |||||
Install (1) illuminated projecting sign - 25. 2 sq. Ft. - east elevation Date: June 2, 2015Permit type: Intake | Permit status: Closed | Completion date: May 11, 2015 | Permit id: 2015-168763-000 | |||||
Install (1) illuminated blade sign - (1) sign lighting Date: June 2, 2015Permit type: Intake | Permit status: Closed | Completion date: May 27, 2015 | Permit id: 2015-176153-000 | |||||
8. 29 sq ft illuminated sign attached to canopy on south elevation Date: July 1, 2015Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-190675-000 | |||||
Sign lighting Date: June 23, 2015Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-190677-000 | |||||
4/1 story, 143 apartment unit project. 1st floor retail Date: May 28, 2014Permit type: Intake | Permit status: Approved | Completion date: December 16, 2013 | Permit id: 2012-153459-000 | |||||
Dfs 03: engineered wood joist and beams Date: July 29, 2014Permit type: Intake | Permit status: Approved | Completion date: July 11, 2014 | Permit id: 2012-153459-Dfs | |||||
Dfs 04: metal panel cladding Date: September 19, 2014Permit type: Intake | Permit status: Approved | Completion date: August 1, 2014 | Permit id: 2012-153459-Dfs | |||||
Dfs 04 : plate connected roof trusses Date: September 23, 2014Permit type: Intake | Permit status: Approved | Completion date: September 15, 2014 | Permit id: 2012-153459-Dfs | |||||
Dfs 06 : sunscreens Date: November 24, 2014Permit type: Intake | Permit status: Approved | Completion date: November 5, 2014 | Permit id: 2012-153459-Dfs | |||||
Dfs 07 : steel stairs 1, 2, 3 (stairs only no handrails or guardrails) levels 01-02 only Date: January 26, 2015Permit type: Intake | Permit status: Approved | Completion date: December 12, 2014 | Permit id: 2012-153459-Dfs | |||||
Dfs 08 : tie back anchors Date: March 30, 2015Permit type: Intake | Permit status: Approved | Completion date: February 25, 2015 | Permit id: 2012-153459-Dfs | |||||
Dfs 09 : curtain wall Date: May 26, 2015Permit type: Intake | Permit status: Approved | Completion date: March 10, 2015 | Permit id: 2012-153459-Dfs | |||||
Dfs : seismic bracing mechanical and rtus Permit type: Intake | Permit status: Approved | Completion date: May 29, 2015 | Permit id: 2012-153459-Dfs | |||||
Dfs : seismic bracing mechanical and rtus Permit type: Process management | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2012-153459-Dfs | |||||
Dfs : seismic bracing mechanical and rtus Permit type: Process management | Permit status: Closed | Completion date: June 4, 2015 | Permit id: 2012-153459-Dfs | |||||
Dfs : seismic bracing mechanical and rtus Permit type: Life safety | Permit status: Not reqd | Completion date: May 29, 2015 | Permit id: 2012-153459-Dfs | |||||
Dfs : seismic bracing mechanical and rtus Permit type: Structural | Permit status: Approved | Completion date: June 1, 2015 | Permit id: 2012-153459-Dfs | |||||
Dfs : seismic bracing mechanical and rtus Permit type: Structural | Permit status: Required | Completion date: June 1, 2015 | Permit id: 2012-153459-Dfs | |||||
Dfs : seismic bracing mechanical and rtus Permit type: Special inspections review | Permit status: Approved | Completion date: June 1, 2015 | Permit id: 2012-153459-Dfs | |||||
Dfs : seismic bracing mechanical and rtus Permit type: Issuance | Permit status: Closed | Completion date: June 4, 2015 | Permit id: 2012-153459-Dfs | |||||
Rev 1 : see comments: 1. Lowered the floor to florr heights by three inches on all floors. 2. Reduced the height of elevator over run and the deletion of the adjoining roof top spaces resulting in reframing this area. 3. Deleted the exterior insulation at the wood framed floors and upgraded the stud cavity insulation. 4/1 story, 143 apartment unit project. 1st floor retail Date: January 7, 2015Permit type: Intake | Permit status: Approved | Completion date: June 17, 2014 | Permit id: 2012-153459-Rev | |||||
Rev 2 : revision to address changes shown on dfs 3 Date: August 6, 2014Permit type: Intake | Permit status: Approved | Completion date: July 21, 2014 | Permit id: 2012-153459-Rev | |||||
See 12-153461-fnd-01-mg for plans. Mechanical permit limited to work in garage and foundation. Includes seven garage exhaust fans and two fresh air fans for ticket booths, five ductless splits for elevator & elect rooms, nine wshps for lobbies and equipment rooms Date: October 16, 2013Permit type: Intake | Permit status: Closed | Completion date: June 26, 2013 | Permit id: 2013-172596-000 | |||||
Approval of a lot consolidation (lu 13-182172 lc) to create one parcel (lot 1) of historic lots 1-8, block 93 of east portland addition, as illustrated by exhibit c. 1, signed and dated march 26, 2014. Approval of a lot consolidation (lu 13-182169 lc) to create one parcel (lot 2) of historic lots 1-8, block 1 of east portland addition, as illustrated by exhibit c. 1, signed and dated march 26, 2014. Approval of a lot consolidation (lu 13-182174 lc) to create one parcel (lot 3) of historic lots 1-8, block 101 of east portland addition, as illustrated by exhibit c. 1, signed and dated march 26, 2014. Approval of a lot consolidation (lu 13-182173 lc) to create one parcel (lot 4) of historic lots 1-8, block 92 of east portland addition, as illustrated by exhibit c. 1, signed and dated march 26, 2014. Date: March 28, 2014Permit type: Land use review | Permit status: Completed | Completion date: July 23, 2013 | Permit id: 2013-182169-000 | |||||
1of storm: 262lf of 27in csp combo main, approx depth=13, in ne 9th. Contractor shall build new branch and cap on property per std p-262 and tap 27 sewer with 12 lateral approx 113lf downstream of mh#abg838. Contractor to verify all depths and locations in field. Contact x37869 Date: September 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 10, 2013 | Permit id: 2013-203232-000 | |||||
2of storm: 213lf of 27in csp combo main, approx depth=11. 5, in ne 9th. Contractor shall build new branch and cap on property per std p-262 and tap 27 sewer with 12 lateral approx 50lf downstream of mh abg845. Contractor to verify all depths and locations in field. Contact x37869 Date: September 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 10, 2013 | Permit id: 2013-203235-000 | |||||
3of storm: 213lf of 27 csp combo in ne 9th & ne holladay. Contractor to make new connection and tap base of manhole (abg860, approx 11ft deep) construct new 8 branch to property and cap on property. Contractor to verify all depths and locations in field. Contact x37869 Date: September 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 10, 2013 | Permit id: 2013-203236-000 | |||||
6of san: 262lf of 27in csp combo main, approx depth=13, in ne 9th. Contractor shall build new branch and cap on property per std p-262 and tap 27 sewer with 6 lateral approx 50lf downstream of mh#abg838. Contractor to verify all depths and locations in field. Contact x37869 Date: September 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 10, 2013 | Permit id: 2013-203245-000 | |||||
7of san: 262lf of 27in csp combo main, approx depth=12. 5, in ne 9th. Contractor shall build new branch and cap on property per std p-262 and tap 27 sewer with lateral approx 180lf downstream of mh#abg838. Contractor to verify all depths and locations in field. Contact x37869 Date: September 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 10, 2013 | Permit id: 2013-203246-000 | |||||
8of san: 213lf of 27in csp combo main, approx depth=12, in ne 9th. Contractor shall build new branch and cap on property per std p-262 and tap 27 sewer with 12 lateral approx 35lf downstream of mh#abg845. Contractor to verify all depths and locations in field. Contact x37869 Date: September 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 10, 2013 | Permit id: 2013-203249-000 | |||||
10of san: 244lf of 36in rcp combo main, approx depth=14, in ne 7th. Contractor shall build new branch and cap on property per std p-262 and tap 36 sewer with 8 lateral approx 13lf downstream of mh#aqc773. Contractor to verify all depths and locations in field. Contact x37869 Date: September 10, 2013Permit type: Intake | Permit status: Closed | Completion date: September 10, 2013 | Permit id: 2013-203255-000 | |||||
Underground plumbing fixtures for foundation permit Date: October 11, 2013Permit type: Intake | Permit status: Closed | Completion date: October 11, 2013 | Permit id: 2013-215972-000 | |||||
Sprinkler - (phase 1 )design and install complete automatic fire sprinkler system for 3 levels of underground parking Date: December 19, 2013Permit type: Intake | Permit status: Approved | Completion date: November 25, 2013 | Permit id: 2013-231488-000 | |||||
Two 20 cfm doas, two wshp, pthps for apartments, one 3-ton gp, misc exhausts, subduct fans on e-power w/generator on block 101 see 12-153459-co for plans. Date: July 2, 2014Permit type: Intake | Permit status: Closed | Completion date: December 17, 2013 | Permit id: 2013-234365-000 | |||||
Alarm - new fire alarm system for parking garage below grade (3 levels)(parking structure reviewed under 12-153461 fnd 01 mg) Date: January 15, 2014Permit type: Intake | Permit status: Approved | Completion date: December 17, 2013 | Permit id: 2013-239076-000 | |||||
Hvac controls 1 building Date: April 24, 2014Permit type: Intake | Permit status: Closed | Completion date: April 24, 2014 | Permit id: 2014-147967-000 | |||||
143 unit building. Largest unit is 1045 sqft - oar 918 reduced fees apply only to residential units. Inspections for all dwelling units must be completed in (4) inspections. If additional inspections are required, they will be billed at the current reinspection fee for each additional inspection. Date: August 5, 2014Permit type: Intake | Permit status: Closed | Completion date: June 18, 2014 | Permit id: 2014-171131-000 | |||||
Complete plumbing system install of floors 1-5, (927) fixtures Date: July 30, 2014Permit type: Intake | Permit status: Closed | Completion date: July 30, 2014 | Permit id: 2014-191230-000 | |||||
Storm sewer replacement in row via trenching per city std p-262; pbot note location. Date: September 8, 2014Permit type: Intake | Permit status: Closed | Completion date: September 8, 2014 | Permit id: 2014-209320-000 | |||||
Sprinkler install new fire sprinkler system per nfpa 13 & 14 20 edition and city of portland standards for new building Date: November 12, 2014Permit type: Intake | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-216730-000 | |||||
Gas piping water heaters and boilers, floors 1-6, garage by others Date: October 15, 2014Permit type: Intake | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-225373-000 | |||||
F25/ ti, ground floor grocery, separation walls, deli prep area, kitchen area, produce area, dairy area, coolers, seating area, coffee bar, restrooms, tile flooring, mechanical mezzanine, ladder, guardrail, ceiling, elec, plbg, paint, finish Date: November 16, 2015Permit type: Reviews | Permit status: Approved | Completion date: November 16, 2015 | Permit id: 2015-265521-000 | |||||
F25/ ti, 808 ne multnomah, green zebra, ground floor grocery, separation walls, deli prep area, kitchen area, produce area, dairy area, coolers, seating area, coffee bar, restrooms, tile flooring, mechanical mezzanine, ladder, guardrail, ceiling, elec, plbg, paint, finish Date: January 29, 2016Permit type: Intake | Permit status: Closed | Completion date: November 16, 2015 | Permit id: 2015-265524-000 | |||||
F17/ dfs for ladder and railing Date: March 29, 2016Permit type: Intake | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2015-265524-Dfs | |||||
B2/dfs for walk in cooler-freezer Date: April 4, 2016Permit type: Intake | Permit status: Closed | Completion date: March 26, 2016 | Permit id: 2015-265524-Dfs | |||||
B1/dfs for shelving anchorage Date: April 11, 2016Permit type: Intake | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2015-265524-Dfs | |||||
Sprinklers-revise existing fire sprinler system for added walls and elevator lobby to meet code 12-153459 rev 03 Date: December 9, 2015Permit type: Intake | Permit status: Approved | Completion date: November 17, 2015 | Permit id: 2015-265937-000 | |||||
F20/orangetheory fitness t. I. - ground floor suite f: reception area w/casework, office, restrooms w/showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: December 1, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-271322-000 | |||||
F20/orangetheory fitness t. I. - ground floor suite f: reception area w/casework, office, restrooms w/showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: January 20, 2016Permit type: Intake | Permit status: Closed | Completion date: December 1, 2015 | Permit id: 2015-271342-000 | |||||
F2/ revision to add hard lid ceiling Date: February 4, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2015-271342-Rev | |||||
F20/orangetheory fitness t. I. - hvac work Date: January 20, 2016Permit type: Intake | Permit status: Closed | Completion date: December 1, 2015 | Permit id: 2015-271351-000 | |||||
Sprinklers-ti, ground floor grocery-revise existing fire sprinkler syhstem for new green zebra tenant to meet code. Date: December 3, 2015Permit type: Intake | Permit status: Closed | Completion date: December 1, 2015 | Permit id: 2015-271358-000 | |||||
F22/ orange theory landlord work/ ground floor facade - remove 3 panels of transom glass and replace with louvers. See separate permit for full tenant improvement Date: December 1, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-271574-000 | |||||
F1/orange theory ti-landlord scope - install (3) wshp with osa and exhaust ducting, elec, plbg Date: December 3, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 3, 2015 | Permit id: 2015-272570-000 | |||||
F1/orange theory ti-landlord scope - install (3) wshp with osa and exhaust ducting, elec Date: March 24, 2016Permit type: Intake | Permit status: Closed | Completion date: December 4, 2015 | Permit id: 2015-273196-000 | |||||
Elwood building t. I. For orangetheory fitness to include: 2-showers, 2-water closets, 2-lavatories, 4-floor drains, 1-mop sink, 1-water heater, 1-df Date: January 5, 2016Permit type: Intake | Permit status: Closed | Completion date: December 4, 2015 | Permit id: 2015-273406-000 | |||||
Power, fire alarm, access, cctv, av, voice/data - ti, green zebra, ground floor grocery, separation walls, deli prep area, kitchen area, produce area, dairy area, coolers, seating area, coffee bar, restrooms, tile flooring, mechanical mezzanine, ladder, guardrail, ceiling, elec, plbg, paint, finish Date: December 16, 2015Permit type: Intake | Permit status: Closed | Completion date: December 5, 2015 | Permit id: 2015-273572-000 | |||||
Power - orange theory fitness t. I. - ground floor suite f: reception area w/casework, office, restrooms w/showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: January 21, 2016Permit type: Intake | Permit status: Closed | Completion date: December 5, 2015 | Permit id: 2015-273579-000 | |||||
Power - orange theory ti-landlord scope - install (3) wshp with osa and exhaust ducting, elec Date: January 25, 2016Permit type: Intake | Permit status: Closed | Completion date: December 5, 2015 | Permit id: 2015-273584-000 | |||||
Plumbing renovation at elwood building for orange theory fitness tirun feet 2-1/2 inch copper and a 4 inch ci stub for future use. Date: December 8, 2015Permit type: Intake | Permit status: Closed | Completion date: December 8, 2015 | Permit id: 2015-274557-000 | |||||
F22/ green zebra - water source heat pumps, condenser water supply Date: February 24, 2016Permit type: Intake | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-280281-000 | |||||
Installation of new 800a service and build out of grocery store green zebra(the build out of the grocery store is part of the facility permit program, see 15-273572 fa db) Date: February 5, 2016Permit type: Intake | Permit status: Closed | Completion date: January 8, 2016 | Permit id: 2015-283406-000 | |||||
808 ne multnomah st., green zebra plumbing fixtures and equipment: 1- water heater, 32- floor sinks,10- floor drains, 6- trench drains, 7- hand sinks, 3- prep sinks, 1- utensil sink, 2- hose reels, 1- ice machine, 1- espresso machine, 1- coffee brewer, 1- rinse sink, 2- dishwashers, 1- combi oven, 1- tilt kettle, 3- water dispensers, 1- dish sink, 1- 3 compartment sink, 1- dump sink, 2- water closets, 2- lavatories, 1- drinking fountain, 1-dw, 1- im Date: December 31, 2015Permit type: Intake | Permit status: Closed | Completion date: December 31, 2015 | Permit id: 2015-283579-000 | |||||
Adding elevator, wiring for future trash compactors & lighting in corridor & storage room Date: January 8, 2016Permit type: Intake | Permit status: Closed | Completion date: January 8, 2016 | Permit id: 2016-102637-000 | |||||
1st floor-orange theory- alteration to the fire sprinklers as needed for t. I.- 5 heads total Date: January 15, 2016Permit type: Intake | Permit status: Closed | Completion date: January 14, 2016 | Permit id: 2016-105505-000 | |||||
F3/ refrigeration installation, piping and fixtures Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 19, 2016 | Permit id: 2016-107608-000 | |||||
Adding (2) 6 a services for meter Date: February 12, 2016Permit type: Intake | Permit status: Closed | Completion date: January 20, 2016 | Permit id: 2016-107778-000 | |||||
Orange theory fitness- alteration to the fire sprinkler as needed for t. I.- 29 heads total Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-112009-000 | |||||
Hvac control - orange theory ti-landlord scope - install (3) wshp with osa and exhaust ducting, elec Date: February 1, 2016Permit type: Intake | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2016-113855-000 | |||||
Hvac controls - orangetheory fitness t. I. - ground floor suite f: reception area w/casework, office, restrooms w/showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: February 1, 2016Permit type: Intake | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2016-113865-000 | |||||
Hvac controls - ti, 808 ne multnomah, green zebra, ground floor grocery, separation walls, deli prep area, kitchen area, produce area, dairy area, coolers, seating area, coffee bar, restrooms, tile flooring, mechanical mezzanine, ladder, guardrail, ceiling, elec, plbg, paint, finish Date: February 1, 2016Permit type: Intake | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2016-113867-000 | |||||
808 ne multnomah, green zebra, ground floor grocery-installation of a captive aire core system for an exhaust hood. Date: February 10, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2016-116842-000 | |||||
New illuminated 31. 50sf sign on the east elevation mounted on raceway. Date: March 4, 2016Permit type: Intake | Permit status: Closed | Completion date: February 17, 2016 | Permit id: 2016-119737-000 | |||||
Data refund request routed to jsilleck 4/5/16 cm Date: February 11, 2016Permit type: Intake | Permit status: Closed | Completion date: February 11, 2016 | Permit id: 2016-120098-000 | |||||
New illuminted sign on existing awning 5. 85sf Date: March 4, 2016Permit type: Intake | Permit status: Closed | Completion date: February 17, 2016 | Permit id: 2016-122384-000 | |||||
B2/ pallet racking Date: February 29, 2016Permit type: Intake | Permit status: Closed | Completion date: February 18, 2016 | Permit id: 2016-122724-000 | |||||
Install (1) illuminated projecting sign, sq ft, north elevation, sign a. Date: February 25, 2016Permit type: Intake | Permit status: Closed | Completion date: February 23, 2016 | Permit id: 2016-125489-000 | |||||
Install (1) illuminated projecting sign under canopy, 31. 98 sq ft. Date: February 25, 2016Permit type: Intake | Permit status: Closed | Completion date: February 23, 2016 | Permit id: 2016-125490-000 | |||||
Install (1) illumianted projecting sign under canopy, 31. 98 sq ft Date: February 25, 2016Permit type: Intake | Permit status: Closed | Completion date: February 23, 2016 | Permit id: 2016-125495-000 | |||||
Install (3) sign circuits Date: February 23, 2016Permit type: Intake | Permit status: Closed | Completion date: February 23, 2016 | Permit id: 2016-125498-000 | |||||
Low voltage for (6) panels: (2) tele/data, (1) cctv, (1) fire alarm, (1) access control and (1) paging. Date: February 29, 2016Permit type: Electrical inspections | Permit status: Approved | Completion date: April 8, 2016 | Permit id: 2016-127990-000 | |||||
Orangetheory fitness t. I.-fire alarm for ti Date: March 8, 2016Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-130752-000 | |||||
Voice/data, fire alarm - orangetheory fitness t. I. - ground floor suite f: reception area w/casework, office, restrooms w/showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: March 9, 2016Permit type: Intake | Permit status: Closed | Completion date: March 9, 2016 | Permit id: 2016-132804-000 | |||||
Install (1) sign circuit Date: March 17, 2016Permit type: Intake | Permit status: Closed | Completion date: March 15, 2016 | Permit id: 2016-135309-000 | |||||
Green zebra- alteration to the fire alarm as needed for t. I.- devices total10- smoke detectors, 6- strobes, 21- h/s, 3- nac panels Date: April 12, 2016Permit type: Intake | Permit status: Closed | Completion date: April 12, 2016 | Permit id: 2016-149871-000 | |||||
Dfs 1: commins auto tight holdown system4/1 story, 143 apartment unit project. 1st floor retail Date: June 5, 2014Permit type: Intake | Permit status: Approved | Completion date: April 22, 2014 | Permit id: 2012-153459-Dfs | |||||
Dfs 2: pts 2nd floor4/1 story, 143 apartment unit project. 1st floor retail Date: May 28, 2014Permit type: Intake | Permit status: Approved | Completion date: April 22, 2014 | Permit id: 2012-153459-Dfs | |||||
Dfs : seismic bracing mechanical and rtus Date: August 26, 2015Permit type: Intake | Permit status: Approved | Completion date: May 29, 2015 | Permit id: 2012-153459-Dfs | |||||
Rev 3 : includes fire rating for walls at new elevator shaft (under permit 12-153461-rev-07-mg), mechanical mezzanine and back of house spaces for future tenant. Date: November 10, 2015Permit type: Intake | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2012-153459-Rev | |||||
Tele-data for new construction Date: September 22, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: August 28, 2015 | Permit id: 2014-216097-000 | |||||
F25 ti, ground floor grocery, separation walls, deli prep area, kitchen area, produce area, dairy area, coolers, seating area, coffee bar, restrooms, tile flooring, mechanical mezzanine, ladder, guardrail, ceiling, elec, plbg, paint, finish Date: November 16, 2015Permit type: Reviews | Permit status: Approved | Completion date: November 16, 2015 | Permit id: 2015-265521-000 | |||||
F25 ti, 808 ne multnomah, green zebra, ground floor grocery, separation walls, deli prep area, kitchen area, produce area, dairy area, coolers, seating area, coffee bar, restrooms, tile flooring, mechanical mezzanine, ladder, guardrail, ceiling, elec, plbg, paint, finish Date: January 29, 2016Permit type: Intake | Permit status: Closed | Completion date: November 16, 2015 | Permit id: 2015-265524-000 | |||||
F17 dfs for ladder and railing Date: March 29, 2016Permit type: Intake | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2015-265524-Dfs | |||||
B2 dfs for walk in cooler-freezer Date: April 4, 2016Permit type: Intake | Permit status: Closed | Completion date: March 26, 2016 | Permit id: 2015-265524-Dfs | |||||
B1 dfs for shelving anchorage Date: April 11, 2016Permit type: Intake | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2015-265524-Dfs | |||||
F20 orangetheory fitness t. I. - ground floor suite f: reception area w casework, office, restrooms w showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: December 1, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-271322-000 | |||||
F20 orangetheory fitness t. I. - ground floor suite f: reception area w casework, office, restrooms w showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: January 20, 2016Permit type: Intake | Permit status: Closed | Completion date: December 1, 2015 | Permit id: 2015-271342-000 | |||||
F2 revision to add hard lid ceiling Date: February 4, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2015-271342-Rev | |||||
F20 orangetheory fitness t. I. - hvac work Date: January 20, 2016Permit type: Intake | Permit status: Closed | Completion date: December 1, 2015 | Permit id: 2015-271351-000 | |||||
F22 orange theory landlord work ground floor facade - remove 3 panels of transom glass and replace with louvers. See separate permit for full tenant improvement Date: December 1, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-271574-000 | |||||
F1 orange theory ti-landlord scope - install (3) wshp with osa and exhaust ducting, elec, plbg Date: December 3, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 3, 2015 | Permit id: 2015-272570-000 | |||||
F1 orange theory ti-landlord scope - install (3) wshp with osa and exhaust ducting, elec Date: March 24, 2016Permit type: Intake | Permit status: Closed | Completion date: December 4, 2015 | Permit id: 2015-273196-000 | |||||
Power, fire alarm, access, cctv, av, voice data - ti, green zebra, ground floor grocery, separation walls, deli prep area, kitchen area, produce area, dairy area, coolers, seating area, coffee bar, restrooms, tile flooring, mechanical mezzanine, ladder, guardrail, ceiling, elec, plbg, paint, finish Date: December 16, 2015Permit type: Intake | Permit status: Closed | Completion date: December 5, 2015 | Permit id: 2015-273572-000 | |||||
Power - orange theory fitness t. I. - ground floor suite f: reception area w casework, office, restrooms w showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: January 21, 2016Permit type: Intake | Permit status: Closed | Completion date: December 5, 2015 | Permit id: 2015-273579-000 | |||||
Plumbing renovation at elwood building for orange theory fitness tirun feet 2-1 2 inch copper and a 4 inch ci stub for future use. Date: December 8, 2015Permit type: Intake | Permit status: Closed | Completion date: December 8, 2015 | Permit id: 2015-274557-000 | |||||
F22 green zebra - water source heat pumps, condenser water supply Date: February 24, 2016Permit type: Intake | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-280281-000 | |||||
F3 refrigeration installation, piping and fixtures Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 19, 2016 | Permit id: 2016-107608-000 | |||||
Hvac controls - orangetheory fitness t. I. - ground floor suite f: reception area w casework, office, restrooms w showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: February 1, 2016Permit type: Intake | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2016-113865-000 | |||||
Data refund request routed to jsilleck 4 5 16 cm Date: February 11, 2016Permit type: Intake | Permit status: Closed | Completion date: February 11, 2016 | Permit id: 2016-120098-000 | |||||
B2 pallet racking Date: February 29, 2016Permit type: Intake | Permit status: Closed | Completion date: February 18, 2016 | Permit id: 2016-122724-000 | |||||
Low voltage for (6) panels: (2) tele data, (1) cctv, (1) fire alarm, (1) access control and (1) paging. Date: February 29, 2016Permit type: Electrical inspections | Permit status: Approved | Completion date: April 8, 2016 | Permit id: 2016-127990-000 | |||||
Voice data, fire alarm - orangetheory fitness t. I. - ground floor suite f: reception area w casework, office, restrooms w showers, open area exercise studio, ceilings, finishes, flooring, plbg, elec Date: March 9, 2016Permit type: Intake | Permit status: Closed | Completion date: March 9, 2016 | Permit id: 2016-132804-000 | |||||
Green zebra- alteration to the fire alarm as needed for t. I.- devices total10- smoke detectors, 6- strobes, 21- h s, 3- nac panels Date: April 12, 2016Permit type: Intake | Permit status: Closed | Completion date: April 12, 2016 | Permit id: 2016-149871-000 | |||||
4 1 story, 143 apartment unit project. 1st floor retail Date: May 28, 2014Permit type: Intake | Permit status: Approved | Completion date: December 16, 2013 | Permit id: 2012-153459-000 | |||||
Dfs 1: commins auto tight holdown system4 1 story, 143 apartment unit project. 1st floor retail Date: June 5, 2014Permit type: Intake | Permit status: Approved | Completion date: April 22, 2014 | Permit id: 2012-153459-Dfs | |||||
Dfs 2: pts 2nd floor4 1 story, 143 apartment unit project. 1st floor retail Date: May 28, 2014Permit type: Intake | Permit status: Approved | Completion date: April 22, 2014 | Permit id: 2012-153459-Dfs | |||||
Rev 1 : see comments: 1. Lowered the floor to florr heights by three inches on all floors. 2. Reduced the height of elevator over run and the deletion of the adjoining roof top spaces resulting in reframing this area. 3. Deleted the exterior insulation at the wood framed floors and upgraded the stud cavity insulation. 4 1 story, 143 apartment unit project. 1st floor retail Date: January 7, 2015Permit type: Intake | Permit status: Approved | Completion date: June 17, 2014 | Permit id: 2012-153459-Rev | |||||
Two 20 cfm doas, two wshp, pthps for apartments, one 3-ton gp, misc exhausts, subduct fans on e-power w generator on block 101 see 12-153459-co for plans. Date: July 2, 2014Permit type: Intake | Permit status: Closed | Completion date: December 17, 2013 | Permit id: 2013-234365-000 |