ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: August 29, 2001Permit id: 01-08-170 | Parcel: 008150083000 | |||||
Date: January 22, 2002Permit id: 02-01-082 | Parcel: 008150083000 | |||||
Date: November 23, 2004Permit id: 04-11-207 | Parcel: 008150083000 | |||||
Date: September 13, 2006Permit id: 06-09-161 | Parcel: 008150093000 | |||||
Date: April 24, 2007Permit id: 07-04-135 | Parcel: 008150093000 | |||||
Date: January 10, 2008Permit id: 08-01-034 | Parcel: 008150093000 | |||||
Date: February 8, 2012Permit id: 12-02-031 | Parcel: 008150093000 | |||||
Date: September 6, 2013Permit id: 13-09-021 | Parcel: 008150093000 | |||||
W. O. 99351 p. M. 30842229 utility potholing Date: January 3, 2013Permit id: 13-0005 | Parcel: 008150093000 | |||||
W. O. 99351 p. M. 30842229 geotechnical boring g-13; data collection at the intersection of west capitol ave and. Harbor blvd. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal conditi Date: May 21, 2013Permit id: 13-0201 | Parcel: 008150093000 | |||||
W. O. 99351 p. M. 30842229 field survey work to stake the proposed gas pipeline alignment. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Date: May 29, 2013Permit id: 13-0215 | Parcel: 008150083000 | |||||
W. O. 99351 p. M. 30842229 utility potholing and geotechnical boring data collection along west capitol ave from west of northport drive to jefferson blvd., along jefferson blvd. From west capitol ave to 15the street and portions on 15th street. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment Date: July 2, 2013Permit id: 13-0245 | Parcel: 008150093000 | |||||
Pg&e Date: August 19, 2013Permit id: 13-0282 | Parcel: 008150093000 | |||||
W. O. 99351 p. M. 30842229 installation of advanced project information signs for proposed l-172-a pipeline along west capitol ave from northport to jefferson bl., along jefferson blvd., from west capitol ave to 15th street and portions of 15th street. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroa Date: August 9, 2013Permit id: 13-0276 | Parcel: 008150093000 | |||||
Wtr and ss connections for new city hall Date: November 1, 2002Permit id: 01-1410 | |||||
Civic center--w. O. #5427 Date: November 1, 2002Permit id: 01-3423 | |||||
To be billed-install conduit along jefferson bl and w. Cap for new city hall Date: November 1, 2002Permit id: 80-3070 | Parcel: 008150083000 | |||||
To be billed Date: November 1, 2002Permit id: 80-4039 | |||||
Emergency generator (city hall) Date: November 30, 2004Permit id: 04-1445 | Parcel: 008150093000 | |||||
W. O. 14000install bicycle storage facility Date: April 7, 2008Permit id: 08-0119 | Parcel: 008150093000 | |||||
Wo#141 streetscape project. Complete reconstruction of west capitol ave from jefferson to garden st. (jay d, project engr) Date: October 31, 2008Permit id: 08-0288 | Parcel: 008150093000 | |||||
Close west bound west capitol ave., no. 1 lane. Offload and place sculpture componebts. Estimate time of lane closure 3 hrs. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or Date: March 8, 2011Permit id: 11-0050 | Parcel: 008150093000 |