ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Steel plate fee and technology fee paid; install 4" sanitary sewer lateral to existing 10" sewer main; abandon/remove old sanitary sewer line; attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before start of work and before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work. Date: October 25, 2010Permit type: Excavation; sewer lateral connection over 4" pipe (trench), excavation; clean out (sewer) | Permit status: Permit expired | Expiration date: April 29, 2011 | Permit id: Pa58285 | |||||
SCORE 100 Construction staging area Date: November 2, 2010 Contractor: Jerone ScottPermit status: Expired | Expiration date: December 2, 2010 | Permit id: Pa10015822 | |||||
SCORE 100 Steel plate fee and technology fee paid; install 4" sanitary sewer lateral to existing 10" sewer main; abandon remove old sanitary sewer line; attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before start of work and before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work. Date: October 25, 2010 Contractor: Jerone ScottPermit type: Excavation; sewer lateral connection over 4" pipe (trench), excavation; clean out (sewer) | Permit status: Permit expired | Expiration date: April 29, 2011 | Permit id: Pa58285 |