ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apt.#3: front room install (3) window guard complete. Kitchen install (2) window guard complete. Date: July 1, 2005 Value: $164Permit type: Gc | Permit id: E600081 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: November 4, 2005Permit type: Delead | Permit id: E613305 | |||||
As per rc # 2005002889802 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on 55 ft. Of pipe in Date: October 14, 2005Permit type: Asbest | Permit id: E610955 | |||||
Erp doh lead abatement violation: as per rc #2005002112103-secondary (abax) and attached scope of work thoroughly remove all lead violations as per n Date: October 14, 2005Permit type: Delead | Permit id: E610954 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 2 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: November 1, 2005Permit type: Delead | Permit id: E612830 | |||||
Install fresh air vent intake in boiler room reequirement for dob sign off. Repair holes in boiler room ceiling heat related emergency no Date: January 11, 2006Permit type: Heat | Permit id: E619417 | |||||
Remove existing heating plant and install new boiler. Install new cast iron/ steel #2 oil boiler to supply adequate heat and hot water to building. Date: October 18, 2005Permit type: Heat | Permit id: E609969 | |||||
As per mini rc # 2006000099702 (environmental management solutions) perform air sampling and analysis in accordance with hpd mini requirement contract Date: October 24, 2005Permit type: Asbest | Permit id: E610953 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immedialty to esb fuel unit. 212-863-8779 Date: September 28, 2005Permit type: Util | Permit id: E608750 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 4 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: November 1, 2005Permit type: Delead | Permit id: E612687 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 7 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: November 3, 2005Permit type: Delead | Permit id: E613157 | |||||
As per mini rc#2006000093402 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 05 samples for asbestos content utilizi Date: October 11, 2005Permit type: Asbest | Permit id: E610438 | |||||
Remove existing heating plant and install new boiler. Install new cast iron steel #2 oil boiler to supply adequate heat and hot water to building. Date: October 18, 2005Permit type: Heat | Permit id: E609969 |