ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Dw permit: construct mcdot standard: mc-301. 03 type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Contact the montgomery county department of transportation, division of highway services at 240-777-60 for a county arborist to inspect the site for tree removal or appropriate species for tree planting within county rights of way prior to driveway construction. The applicant may be required to obtain a separate roadside tree permit from the maryland department of natural resources forest service. Contact the local dnr - forest service office at 301-854-6060. Date: February 23, 2009Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 260677 | |||||
Demolition of single family dwelling-performance bond, tracking no. 30763 Date: April 24, 2006Permit type: Demolition or move permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 395080 | |||||
Electrical permit Date: November 4, 2009Permit status: Issued | Current use: Single family dwelling | Permit id: 524806 | |||||
Install 3/4" pla service from edison rd-main-20lb, service in accordance with washington gas plan no. 111853. Construct utility pavement patch in kind as directed by the inspector in the field. All above & below grade facilities shall be placed in public utility easements or adjacent to the right-of-way line unless approved otherwise by the mcdps right-of-way (row) inspector. Work shall comply with the current montgomery county specifications for utility construction permit. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting required contact mcdps inspector before and after installation. Date: July 1, 2010Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 265766 |