ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 86 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 5, 2013 Contractor: Cody OramPermit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: December 13, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 5, 2013 Contractor: Vivint Solar Developer LlcPermit type: Residential alteration-addn | Permit status: Completed | Completion date: December 13, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 92 18 sf re-roof if a re-roof project is proposed, the following specifications apply. Existing roofing material shingles proposed roofing material shingles manufacturer owens corning brand and model true definition color (if cool roof required) sierra gray built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) na required building inspector field verification (if applicable) yes note self-certification of interior attic space by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: February 8, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: February 6, 2017Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
Final Date: April 11, 2005Permit status: Pass | Permit id: Pds2004-1004-20 | |||||
Final Date: December 12, 2013Permit status: Pass | Permit id: Pds2013-Resalt- |