Construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Driveway apron(s) to be constructed with a 13 x 17 minimum size pipe with end sections. Construct a temporary stabilized construction entrance. Prior to release of this permit, the temporary entrance will be removed and complete repair shall be made of any and all damages done to the existing improvements in the public right of way. Place a temporary 6" cmp in the right of way ditch for drainage of temporary sediment control pond. Mcdot standard: mc 301. 03 Date: July 20, 2001Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 212050 |