ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Finishing basement Date: January 16, 2014 Value: $35,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 660690 | |||||
Electrical permit Date: December 14, 2006Permit status: Finaled | Current use: Single family dwelling | Permit id: 441038 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: February 6, 2014Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 662656 | |||||
Building permit# 281376 Date: November 28, 2006Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 439644 | |||||
Mfgr: apex homes, inc. Model: #2860-2story with #18 garage Date: February 21, 2002 Value: $100,000Permit type: Building residential permit | Permit status: Stop work | Current use: Modular | Permit id: 257901 | |||||
House type change-no change to driveway Date: August 13, 2002 Value: $125,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 281376 | |||||
Deck and 48"" fence Date: August 8, 2011 Value: $18,000Permit type: Building residential permit | Permit status: Finaled | Current use: Deck | Permit id: 576518 | |||||
Installation of wireless equipment onexisting pepco polein accordance with crown castleplan, shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: January 13, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 350632 |