ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
On weymouth street (#10649 - #10650, parkside condominiums) construct excavation for replacement of existing hot water pipe as directed. Construct utility pavement patch and sidewalk repair as directed by the inspector. >>>pre-construction meeting required<< complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused byconstruction operations. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Note - the following conditions must be addresssed prior to permit closure: provide the right of way inspector proof that they have registered with miss utility
|