ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
This work is permittedafter 5/20/18. Must request permit extension. (revised on 11/30/16) the pavement cut moratoriumexpires on 5/20/18. Replace sewer lateral and install new manhole in accordance with wssc permit, plans and specifications. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must have preconstruction meeting with dps row inspector prior to beginning of construction work.
|