Building Permits at 1061 Ne 9th Ave Portland OR


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1061 Ne 9th Ave Portland OR over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Fire alarm - add fire alarm system to block 101
Date:  December 23, 2014

Permit type: Intake | Permit status: Approved | Completion date: November 18, 2014 | Permit id: 2014-238726-000
2014/12/230951061 Ne 9th Ave Portland Or
Alarm-das system for block 101 and parking garage

Permit type: Intake | Permit status: Approved | Completion date: April 15, 2015 | Permit id: 2015-111139-000
0951061 Ne 9th Ave Portland Or
Alarm-das system for block 101 and parking garage

Permit type: Intake | Permit status: Closed | Completion date: April 15, 2015 | Permit id: 2015-111139-000
0951061 Ne 9th Ave Portland Or
Install (1) illuminated projecting sign - 25. 2 sq. Ft. - east elevation
Date:  June 2, 2015

Permit type: Intake | Permit status: Closed | Completion date: May 13, 2015 | Permit id: 2015-170294-000
2015/06/020951061 Ne 9th Ave Portland Or
Hazardous/tank - installation of emergency back up generator with 6 gallon sub-base tank

Permit type: Intake | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2015-170814-000
0951061 Ne 9th Ave Portland Or
Hazardous/tank - installation of emergency back up generator with 6 gallon sub-base tank

Permit type: Intake | Permit status: Closed | Completion date: May 14, 2015 | Permit id: 2015-170814-000
0951061 Ne 9th Ave Portland Or
Install (1) illuminated blade sign - (1) sign lighting
Date:  June 2, 2015

Permit type: Intake | Permit status: Closed | Completion date: May 27, 2015 | Permit id: 2015-176182-000
2015/06/020951061 Ne 9th Ave Portland Or
13. 67 sq ft illuminated wall sign on south elevation
Date:  June 29, 2015

Permit type: Intake | Permit status: Closed | Completion date: June 2, 2015 | Permit id: 2015-179593-000
2015/06/290951061 Ne 9th Ave Portland Or
(proposed story tower mixed use residential (238 units) and ground floor retail.)(2/4/14 corrections recieved - scope revised to include 337 living units)
Date:  April 18, 2014

Permit type: Intake | Permit status: Approved | Completion date: November 20, 2013 | Permit id: 2012-153461-000
2014/04/180951061 Ne 9th Ave Portland Or
Dfs 1, pt cables level 2, garageproposed story tower mixed use residential (238 units) and ground floor retail.
Date:  December 16, 2013

Permit type: Intake | Permit status: Approved | Completion date: November 12, 2013 | Permit id: 2012-153461-Dfs
2013/12/160951061 Ne 9th Ave Portland Or
Dfs 2, metal stairs, garageproposed story tower mixed use residential (238 units) and ground floor retail.
Date:  January 10, 2014

Permit type: Intake | Permit status: Approved | Completion date: December 18, 2013 | Permit id: 2012-153461-Dfs
2014/01/100951061 Ne 9th Ave Portland Or
Dfs 3, pt cables level 1, garage area a & b proposed story tower mixed use residential (238 units) and ground floor retail.
Date:  January 17, 2014

Permit type: Intake | Permit status: Approved | Completion date: January 2, 2014 | Permit id: 2012-153461-Dfs
2014/01/170951061 Ne 9th Ave Portland Or
Dfs 5, pt cables level 1, garage area a & b proposed story tower mixed use residential (238 units) and ground floor retail.
Date:  January 30, 2014

Permit type: Intake | Permit status: Approved | Completion date: January 10, 2014 | Permit id: 2012-153461-Dfs
2014/01/300951061 Ne 9th Ave Portland Or
Dfs 6- attachment of mechanical equipment
Date:  January 30, 2014

Permit type: Intake | Permit status: Approved | Completion date: January 24, 2014 | Permit id: 2012-153461-Dfs
2014/01/300951061 Ne 9th Ave Portland Or
Dfs 07 - deferred submittal for fnd permit parking garage lid level post tension cables for area c
Date:  February 18, 2014

Permit type: Intake | Permit status: Approved | Completion date: January 31, 2014 | Permit id: 2012-153461-Dfs
2014/02/180951061 Ne 9th Ave Portland Or
Dfs 08 for fnd permit - parking garage lid level post tension cables for area b
Date:  February 21, 2014

Permit type: Intake | Permit status: Approved | Completion date: February 13, 2014 | Permit id: 2012-153461-Dfs
2014/02/210951061 Ne 9th Ave Portland Or
Dfs 09 for fnd permit - parking garage lid level post tension cables for area b
Date:  April 3, 2014

Permit type: Intake | Permit status: Approved | Completion date: February 27, 2014 | Permit id: 2012-153461-Dfs
2014/04/030951061 Ne 9th Ave Portland Or
Dfs for fnd permit - parking garage pt beams area c
Date:  March 19, 2014

Permit type: Intake | Permit status: Approved | Completion date: March 7, 2014 | Permit id: 2012-153461-Dfs
2014/03/190951061 Ne 9th Ave Portland Or
Dfs 11 for fnd permit - parking garage pt beams area b
Date:  April 3, 2014

Permit type: Intake | Permit status: Approved | Completion date: March 20, 2014 | Permit id: 2012-153461-Dfs
2014/04/030951061 Ne 9th Ave Portland Or
Dfs 12 - 2nd floor pt cables
Date:  May 1, 2014

Permit type: Intake | Permit status: Approved | Completion date: April 7, 2014 | Permit id: 2012-153461-Dfs
2014/05/010951061 Ne 9th Ave Portland Or
Dfs 13 - 3rd floor pt cables
Date:  May 16, 2014

Permit type: Intake | Permit status: Approved | Completion date: May 15, 2014 | Permit id: 2012-153461-Dfs
2014/05/160951061 Ne 9th Ave Portland Or
Dfs 14 - 4th floor pt cables
Date:  May 28, 2014

Permit type: Intake | Permit status: Approved | Completion date: May 21, 2014 | Permit id: 2012-153461-Dfs
2014/05/280951061 Ne 9th Ave Portland Or
Dfs 15: 5th -16th floor pt cables
Date:  June 12, 2014

Permit type: Intake | Permit status: Approved | Completion date: June 4, 2014 | Permit id: 2012-153461-Dfs
2014/06/120951061 Ne 9th Ave Portland Or
Dfs 16: metal panel clading
Date:  September 19, 2014

Permit type: Intake | Permit status: Approved | Completion date: June 5, 2014 | Permit id: 2012-153461-Dfs
2014/09/190951061 Ne 9th Ave Portland Or
Dfs 17: pt cables level 17 thru 19
Date:  September 24, 2014

Permit type: Intake | Permit status: Approved | Completion date: September 3, 2014 | Permit id: 2012-153461-Dfs
2014/09/240951061 Ne 9th Ave Portland Or
Dfs 19 : pts
Date:  October 13, 2014

Permit type: Intake | Permit status: Approved | Completion date: September 24, 2014 | Permit id: 2012-153461-Dfs
2014/10/130951061 Ne 9th Ave Portland Or
Dfs 19 : fireproofing
Date:  January 7, 2015

Permit type: Intake | Permit status: Approved | Completion date: November 17, 2014 | Permit id: 2012-153461-Dfs
2015/01/070951061 Ne 9th Ave Portland Or
Dfs for glass canopy, elevator box and security rail
Date:  May 1, 2015

Permit type: Intake | Permit status: Approved | Completion date: December 1, 2014 | Permit id: 2012-153461-Dfs
2015/05/010951061 Ne 9th Ave Portland Or
Dfs 21: fireproofing
Date:  May 1, 2015

Permit type: Intake | Permit status: Approved | Completion date: April 16, 2015 | Permit id: 2012-153461-Dfs
2015/05/010951061 Ne 9th Ave Portland Or
Dfs 21: stairs 1,2,3 & 4 levels 1 to roof
Date:  April 3, 2015

Permit type: Intake | Permit status: Approved | Completion date: February 13, 2015 | Permit id: 2012-153461-Dfs
2015/04/030951061 Ne 9th Ave Portland Or
Dfs 23 : for point supported glass canopies and skylight
Date:  April 20, 2015

Permit type: Intake | Permit status: Approved | Completion date: February 4, 2015 | Permit id: 2012-153461-Dfs
2015/04/200951061 Ne 9th Ave Portland Or
Dfs 23 : mezzanine stairs
Date:  March 30, 2015

Permit type: Intake | Permit status: Approved | Completion date: February 25, 2015 | Permit id: 2012-153461-Dfs
2015/03/300951061 Ne 9th Ave Portland Or
Dfs 25 : tie back anchors
Date:  March 30, 2015

Permit type: Intake | Permit status: Approved | Completion date: February 25, 2015 | Permit id: 2012-153461-Dfs
2015/03/300951061 Ne 9th Ave Portland Or
Dfs 26 : glass guardrail
Date:  April 20, 2015

Permit type: Intake | Permit status: Approved | Completion date: March 30, 2015 | Permit id: 2012-153461-Dfs
2015/04/200951061 Ne 9th Ave Portland Or
Dfs 27 : seismic bracing mechanical and rtus
Date:  May 26, 2015

Permit type: Intake | Permit status: Approved | Completion date: May 11, 2015 | Permit id: 2012-153461-Dfs
2015/05/260951061 Ne 9th Ave Portland Or
Dfs 28 : curtain wall

Permit type: Intake | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2012-153461-Dfs
0951061 Ne 9th Ave Portland Or
Dfs 28 : curtain wall

Permit type: Process management | Permit status: Closed | Completion date: June 5, 2015 | Permit id: 2012-153461-Dfs
0951061 Ne 9th Ave Portland Or
Excavation/ shoring for proposed story tower mixed use residential (238 units) and ground floor retail.
Date:  August 20, 2013

Permit type: Intake | Permit status: Approved | Completion date: March 20, 2013 | Permit id: 2012-153461-Exc
2013/08/200951061 Ne 9th Ave Portland Or
Fnd-01 garage/foundation for 3 new buildings no occupancy this pemit proposed story tower mixed use residential (238 units) and ground floor retail.
Date:  October 17, 2013

Permit type: Intake | Permit status: Approved | Completion date: June 26, 2013 | Permit id: 2012-153461-Fnd
2013/10/170951061 Ne 9th Ave Portland Or
Revision to fnd 01, for boom and man hoists cut outs, and pour strip in area b (fnd-01 garage/foundation for 3 new buildings no occupancy this pemit)proposed story tower mixed use residential (238 units) and ground floor retail.
Date:  December 16, 2013

Permit type: Intake | Permit status: Approved | Completion date: December 9, 2013 | Permit id: 2012-153461-Rev
2013/12/160951061 Ne 9th Ave Portland Or
Revision to fnd 01, see document for list of changesproposed story tower mixed use residential (238 units) and ground floor retail.
Date:  January 7, 2015

Permit type: Intake | Permit status: Approved | Completion date: January 9, 2014 | Permit id: 2012-153461-Rev
2015/01/070951061 Ne 9th Ave Portland Or
Rev-3 for fnd permit - parking garage area a revisons to lid; parking garage area a & b: relocation of mechanical shafts (approved pts already reflect this change)
Date:  March 19, 2014

Permit type: Intake | Permit status: Approved | Completion date: March 6, 2014 | Permit id: 2012-153461-Rev
2014/03/190951061 Ne 9th Ave Portland Or
Rev-4 for 2nd floor changes, and 21st floor changes (see comments for detail descirptions for each sheet.)
Date:  May 9, 2014

Permit type: Intake | Permit status: Approved | Completion date: April 30, 2014 | Permit id: 2012-153461-Rev
2014/05/090951061 Ne 9th Ave Portland Or
Rev-5 for 3rd and 4th floor changes
Date:  May 9, 2014

Permit type: Intake | Permit status: Approved | Completion date: May 5, 2014 | Permit id: 2012-153461-Rev
2014/05/090951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Intake | Permit status: Approved | Completion date: August 21, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Process management | Permit status: Closed | Completion date: August 21, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Process management | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Process management | Permit status: Closed | Completion date: November 20, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Process management | Permit status: Closed | Completion date: December 3, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Process management | Permit status: Closed | Completion date: December 22, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Planning and zoning | Permit status: Approved | Completion date: December 16, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Life safety | Permit status: Approved | Completion date: November 20, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Life safety | Permit status: Approved | Completion date: December 8, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Structural | Permit status: Approved | Completion date: September 19, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
See documents for list of changes

Permit type: Issuance | Permit status: Closed | Completion date: December 22, 2014 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Str 01: garage interiors and site package, includes living machine, all interior garage work, all site development, the balance of the structural work not previously permitted which includes the above the garage lid stem walls and walkway bridge elements. Note: structural sheets or details previously approved will be identified for reference only. Aproposed story tower mixed use residential (238 units) and ground floor retail.
Date:  December 8, 2014

Permit type: Intake | Permit status: Approved | Completion date: December 23, 2013 | Permit id: 2012-153461-Str
2014/12/080951061 Ne 9th Ave Portland Or
Two 25 cfm doas, pthp for apartments, one 6, one 4 and one 2-ton wshp, elevator pressurization, restroom exhaust in wrapped joist, dryer and range exhaust, subduct trash, dryer, range & restroom on e-pwr, see 12-153462-co for plans
Date:  May 5, 2014

Permit type: Intake | Permit status: Closed | Completion date: November 6, 2013 | Permit id: 2013-225369-000
2014/05/050951061 Ne 9th Ave Portland Or
Two 15 cfm and one 45 cfm doas, four wshp, pthps for apartments, stair pressurization, elev. Lobbies, one 10t, one 5-ton gp w/smoke detection, one 2. 5t and one 2t gp, 20 cfm spa erv, elevator ds, e-gen plans w/12-153461-mg
Date:  May 5, 2014

Permit type: Intake | Permit status: Closed | Completion date: November 20, 2013 | Permit id: 2013-230551-000
2014/05/050951061 Ne 9th Ave Portland Or
Hvac controls 101 building
Date:  April 24, 2014

Permit type: Intake | Permit status: Closed | Completion date: April 24, 2014 | Permit id: 2014-147919-000
2014/04/240951061 Ne 9th Ave Portland Or
Plumbing fixtures for new construction; 48 backflow preventers, 337 cw, 337dw, 22 floor drains, 6 hb, 91 roof drains, 735 sink, 395 (tub/shower/sp), 395 wc, 3 wh, 9 other fixtures
Date:  May 12, 2014

Permit type: Intake | Permit status: Closed | Completion date: May 12, 2014 | Permit id: 2014-155452-000
2014/05/120951061 Ne 9th Ave Portland Or
337 unit building. Largest unit is 1746 sqft - oar 918 reduced fees apply only to residential units. Inspections for all dwelling units must be completed in (4) inspections. If additional inspections are required, they will be billed at the current reinspection fee for each additional inspection.
Date:  August 5, 2014

Permit type: Intake | Permit status: Closed | Completion date: June 18, 2014 | Permit id: 2014-171147-000
2014/08/050951061 Ne 9th Ave Portland Or
Gas piping and condenser water rough in piping
Date:  October 15, 2014

Permit type: Intake | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-225378-000
2014/10/150951061 Ne 9th Ave Portland Or
Sprinkler-install new fire sprinkler system per nfpa 13/14 20 edition and city of portalnd standards for new construction.
Date:  November 26, 2014

Permit type: Intake | Permit status: Approved | Completion date: November 5, 2014 | Permit id: 2014-234251-000
2014/11/260951061 Ne 9th Ave Portland Or
Convert bike storage to leasing office, change light fixtures and add new receptacles and house panel
Date:  October 5, 2015

Permit type: Electrical inspections | Permit status: Approved | Completion date: October 12, 2015 | Permit id: 2015-246476-000
2015/10/050951061 Ne 9th Ave Portland Or
F6/lloyd block ground flr leasing office - demo existing bike storage stalls and convert to leasing office, new wall partitions, relites, cabintry, finishing, lighting modifications, elec
Date:  October 8, 2015

Permit type: Reviews | Permit status: Approved | Completion date: October 8, 2015 | Permit id: 2015-248451-000
2015/10/080951061 Ne 9th Ave Portland Or
F3/ install 3 ton heat pump, associated piping, connect to existing ductwork and grilles
Date:  November 30, 2015

Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269089-000
2015/11/300951061 Ne 9th Ave Portland Or
Power - lloyd block ground flr leasing office - demo existing bike storage stalls and convert to leasing office, new wall partitions, relites, cabintry, finishing, lighting modifications, elec

Permit type: Intake | Permit status: Closed | Completion date: December 5, 2015 | Permit id: 2015-273575-000
0951061 Ne 9th Ave Portland Or
F24/ garden bar, ti; landlord work at concrete slab,
Date:  February 12, 2016

Permit type: Reviews | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120641-000
2016/02/120951061 Ne 9th Ave Portland Or
F24/ garden bar, ti; landlord work , two new restrooms,
Date:  April 8, 2016

Permit type: Intake | Permit status: Closed | Completion date: February 12, 2016 | Permit id: 2016-120644-000
2016/04/080951061 Ne 9th Ave Portland Or
Garden bar- landlord work- alterations to the fire sprinklers as needed for t. I.- 2 heads total
Date:  February 12, 2016

Permit type: Intake | Permit status: Closed | Completion date: February 12, 2016 | Permit id: 2016-120805-000
2016/02/120951061 Ne 9th Ave Portland Or
Plumbing renovation at astor tower for garden bar ti2-gi, 4-fs, 1-ms, 1-im, 2-hs, 2-wc, 2-lav
Date:  February 22, 2016

Permit type: Intake | Permit status: Closed | Completion date: February 22, 2016 | Permit id: 2016-124159-000
2016/02/220951061 Ne 9th Ave Portland Or
Power - garden bar, ti; landlord work , two new restrooms
Date:  March 3, 2016

Permit type: Intake | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2016-130188-000
2016/03/030951061 Ne 9th Ave Portland Or
B1/ garden bar - tenant build-out hvac equipment, ducting and condenser water supply
Date:  March 28, 2016

Permit type: Intake | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2016-139664-000
2016/03/280951061 Ne 9th Ave Portland Or
B1/ tenant build-out including hvac, equipment, ducting and condenser water supply. See separate permits for landlord work
Date:  March 23, 2016

Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139745-000
2016/03/230951061 Ne 9th Ave Portland Or
Power - garden bar - tenant build-out hvac equipment, ducting and condenser water supply

Permit type: Intake | Permit status: Closed | Completion date: April 2, 2016 | Permit id: 2016-144367-000
0951061 Ne 9th Ave Portland Or
F18/ little big burger tenant build-out
Date:  April 7, 2016

Permit type: Reviews | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2016-147254-000
2016/04/070951061 Ne 9th Ave Portland Or
F18/ little big burger tenant build-out - hvac including equipment, ducting and condenser water supply
Date:  April 12, 2016

Permit type: Intake | Permit status: Closed | Completion date: April 7, 2016 | Permit id: 2016-147282-000
2016/04/120951061 Ne 9th Ave Portland Or
Hvac control - garden bar, ti; landlord work , two new restrooms,
Date:  April 8, 2016

Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148033-000
2016/04/080951061 Ne 9th Ave Portland Or
Hvac control - little big burger tenant build-out - hvac including equipment, ducting and condenser water supply
Date:  April 8, 2016

Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148037-000
2016/04/080951061 Ne 9th Ave Portland Or
Dfs 28 : curtain wall
Date:  November 10, 2015

Permit type: Intake | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2012-153461-Dfs
2015/11/100951061 Ne 9th Ave Portland Or
Dfs 29 : steel stairs connecting p1 to l1 in blk 1 (zebra market ti)
Date:  March 22, 2016

Permit type: Intake | Permit status: Approved | Completion date: March 2, 2016 | Permit id: 2012-153461-Dfs
2016/03/220951061 Ne 9th Ave Portland Or
Rev 7 : includes new elevator shaft from p1 to l1, and entry bridge on green street
Date:  November 10, 2015

Permit type: Intake | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2012-153461-Rev
2015/11/100951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Intake | Permit status: Approved | Completion date: January 29, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Process management | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Process management | Permit status: Closed | Completion date: February 9, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Life safety | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Structural | Permit status: Approved | Completion date: February 3, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Issuance | Permit status: Closed | Completion date: February 9, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Tele-data for new construction
Date:  September 22, 2014

Permit type: Electrical inspections | Permit status: Approved | Completion date: September 16, 2015 | Permit id: 2014-216099-000
2014/09/220951061 Ne 9th Ave Portland Or
Alarm-das system for block 101 and parking garage
Date:  August 14, 2015

Permit type: Intake | Permit status: Approved | Completion date: April 15, 2015 | Permit id: 2015-111139-000
2015/08/140951061 Ne 9th Ave Portland Or
Hazardous/tank - installation of emergency back up generator with 6 gallon sub-base tank
Date:  August 28, 2015

Permit type: Intake | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2015-170814-000
2015/08/280951061 Ne 9th Ave Portland Or
F6 lloyd block ground flr leasing office - demo existing bike storage stalls and convert to leasing office, new wall partitions, relites, cabintry, finishing, lighting modifications, elec
Date:  October 8, 2015

Permit type: Reviews | Permit status: Approved | Completion date: October 8, 2015 | Permit id: 2015-248451-000
2015/10/080951061 Ne 9th Ave Portland Or
F3 install 3 ton heat pump, associated piping, connect to existing ductwork and grilles
Date:  November 30, 2015

Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269089-000
2015/11/300951061 Ne 9th Ave Portland Or
Power - lloyd block ground flr leasing office - demo existing bike storage stalls and convert to leasing office, new wall partitions, relites, cabintry, finishing, lighting modifications, elec

Permit type: Intake | Permit status: Closed | Completion date: December 5, 2015 | Permit id: 2015-273575-000
0951061 Ne 9th Ave Portland Or
F24 garden bar, ti; landlord work at concrete slab,
Date:  February 12, 2016

Permit type: Reviews | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120641-000
2016/02/120951061 Ne 9th Ave Portland Or
F24 garden bar, ti; landlord work , two new restrooms,
Date:  April 8, 2016

Permit type: Intake | Permit status: Closed | Completion date: February 12, 2016 | Permit id: 2016-120644-000
2016/04/080951061 Ne 9th Ave Portland Or
B1 garden bar - tenant build-out hvac equipment, ducting and condenser water supply
Date:  March 28, 2016

Permit type: Intake | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2016-139664-000
2016/03/280951061 Ne 9th Ave Portland Or
B1 tenant build-out including hvac, equipment, ducting and condenser water supply. See separate permits for landlord work
Date:  March 23, 2016

Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139745-000
2016/03/230951061 Ne 9th Ave Portland Or
Power - garden bar - tenant build-out hvac equipment, ducting and condenser water supply

Permit type: Intake | Permit status: Closed | Completion date: April 2, 2016 | Permit id: 2016-144367-000
0951061 Ne 9th Ave Portland Or
F18 little big burger tenant build-out
Date:  April 7, 2016

Permit type: Reviews | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2016-147254-000
2016/04/070951061 Ne 9th Ave Portland Or
F18 little big burger tenant build-out - hvac including equipment, ducting and condenser water supply
Date:  April 12, 2016

Permit type: Intake | Permit status: Closed | Completion date: April 7, 2016 | Permit id: 2016-147282-000
2016/04/120951061 Ne 9th Ave Portland Or
(proposed story tower mixed use residential (238 units) and ground floor retail.)(2 4 14 corrections recieved - scope revised to include 337 living units)
Date:  April 18, 2014

Permit type: Intake | Permit status: Approved | Completion date: November 20, 2013 | Permit id: 2012-153461-000
2014/04/180951061 Ne 9th Ave Portland Or
Excavation shoring for proposed story tower mixed use residential (238 units) and ground floor retail.
Date:  August 20, 2013

Permit type: Intake | Permit status: Approved | Completion date: March 20, 2013 | Permit id: 2012-153461-Exc
2013/08/200951061 Ne 9th Ave Portland Or
Fnd-01 garage foundation for 3 new buildings no occupancy this pemit proposed story tower mixed use residential (238 units) and ground floor retail.
Date:  October 17, 2013

Permit type: Intake | Permit status: Approved | Completion date: June 26, 2013 | Permit id: 2012-153461-Fnd
2013/10/170951061 Ne 9th Ave Portland Or
Revision to fnd 01, for boom and man hoists cut outs, and pour strip in area b (fnd-01 garage foundation for 3 new buildings no occupancy this pemit)proposed story tower mixed use residential (238 units) and ground floor retail.
Date:  December 16, 2013

Permit type: Intake | Permit status: Approved | Completion date: December 9, 2013 | Permit id: 2012-153461-Rev
2013/12/160951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Intake | Permit status: Approved | Completion date: January 29, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Process management | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Process management | Permit status: Closed | Completion date: February 9, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Life safety | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Structural | Permit status: Approved | Completion date: February 3, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid.

Permit type: Issuance | Permit status: Closed | Completion date: February 9, 2016 | Permit id: 2012-153461-Rev
0951061 Ne 9th Ave Portland Or
Two 15 cfm and one 45 cfm doas, four wshp, pthps for apartments, stair pressurization, elev. Lobbies, one 10t, one 5-ton gp w smoke detection, one 2. 5t and one 2t gp, 20 cfm spa erv, elevator ds, e-gen plans w 12-153461-mg
Date:  May 5, 2014

Permit type: Intake | Permit status: Closed | Completion date: November 20, 2013 | Permit id: 2013-230551-000
2014/05/050951061 Ne 9th Ave Portland Or
Plumbing fixtures for new construction; 48 backflow preventers, 337 cw, 337dw, 22 floor drains, 6 hb, 91 roof drains, 735 sink, 395 (tub shower sp), 395 wc, 3 wh, 9 other fixtures
Date:  May 12, 2014

Permit type: Intake | Permit status: Closed | Completion date: May 12, 2014 | Permit id: 2014-155452-000
2014/05/120951061 Ne 9th Ave Portland Or
Sprinkler-install new fire sprinkler system per nfpa 13 14 20 edition and city of portalnd standards for new construction.
Date:  November 26, 2014

Permit type: Intake | Permit status: Approved | Completion date: November 5, 2014 | Permit id: 2014-234251-000
2014/11/260951061 Ne 9th Ave Portland Or
Hazardous tank - installation of emergency back up generator with 6 gallon sub-base tank
Date:  August 28, 2015

Permit type: Intake | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2015-170814-000
2015/08/280951061 Ne 9th Ave Portland Or
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.