Fire alarm - add fire alarm system to block 101 Date: December 23, 2014Permit type: Intake | Permit status: Approved | Completion date: November 18, 2014 | Permit id: 2014-238726-000 | |||||
Alarm-das system for block 101 and parking garage Permit type: Intake | Permit status: Approved | Completion date: April 15, 2015 | Permit id: 2015-111139-000 | |||||
Alarm-das system for block 101 and parking garage Permit type: Intake | Permit status: Closed | Completion date: April 15, 2015 | Permit id: 2015-111139-000 | |||||
Install (1) illuminated projecting sign - 25. 2 sq. Ft. - east elevation Date: June 2, 2015Permit type: Intake | Permit status: Closed | Completion date: May 13, 2015 | Permit id: 2015-170294-000 | |||||
Hazardous/tank - installation of emergency back up generator with 6 gallon sub-base tank Permit type: Intake | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2015-170814-000 | |||||
Hazardous/tank - installation of emergency back up generator with 6 gallon sub-base tank Permit type: Intake | Permit status: Closed | Completion date: May 14, 2015 | Permit id: 2015-170814-000 | |||||
Install (1) illuminated blade sign - (1) sign lighting Date: June 2, 2015Permit type: Intake | Permit status: Closed | Completion date: May 27, 2015 | Permit id: 2015-176182-000 | |||||
13. 67 sq ft illuminated wall sign on south elevation Date: June 29, 2015Permit type: Intake | Permit status: Closed | Completion date: June 2, 2015 | Permit id: 2015-179593-000 | |||||
(proposed story tower mixed use residential (238 units) and ground floor retail.)(2/4/14 corrections recieved - scope revised to include 337 living units) Date: April 18, 2014Permit type: Intake | Permit status: Approved | Completion date: November 20, 2013 | Permit id: 2012-153461-000 | |||||
Dfs 1, pt cables level 2, garageproposed story tower mixed use residential (238 units) and ground floor retail. Date: December 16, 2013Permit type: Intake | Permit status: Approved | Completion date: November 12, 2013 | Permit id: 2012-153461-Dfs | |||||
Dfs 2, metal stairs, garageproposed story tower mixed use residential (238 units) and ground floor retail. Date: January 10, 2014Permit type: Intake | Permit status: Approved | Completion date: December 18, 2013 | Permit id: 2012-153461-Dfs | |||||
Dfs 3, pt cables level 1, garage area a & b proposed story tower mixed use residential (238 units) and ground floor retail. Date: January 17, 2014Permit type: Intake | Permit status: Approved | Completion date: January 2, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 5, pt cables level 1, garage area a & b proposed story tower mixed use residential (238 units) and ground floor retail. Date: January 30, 2014Permit type: Intake | Permit status: Approved | Completion date: January 10, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 6- attachment of mechanical equipment Date: January 30, 2014Permit type: Intake | Permit status: Approved | Completion date: January 24, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 07 - deferred submittal for fnd permit parking garage lid level post tension cables for area c Date: February 18, 2014Permit type: Intake | Permit status: Approved | Completion date: January 31, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 08 for fnd permit - parking garage lid level post tension cables for area b Date: February 21, 2014Permit type: Intake | Permit status: Approved | Completion date: February 13, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 09 for fnd permit - parking garage lid level post tension cables for area b Date: April 3, 2014Permit type: Intake | Permit status: Approved | Completion date: February 27, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs for fnd permit - parking garage pt beams area c Date: March 19, 2014Permit type: Intake | Permit status: Approved | Completion date: March 7, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 11 for fnd permit - parking garage pt beams area b Date: April 3, 2014Permit type: Intake | Permit status: Approved | Completion date: March 20, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 12 - 2nd floor pt cables Date: May 1, 2014Permit type: Intake | Permit status: Approved | Completion date: April 7, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 13 - 3rd floor pt cables Date: May 16, 2014Permit type: Intake | Permit status: Approved | Completion date: May 15, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 14 - 4th floor pt cables Date: May 28, 2014Permit type: Intake | Permit status: Approved | Completion date: May 21, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 15: 5th -16th floor pt cables Date: June 12, 2014Permit type: Intake | Permit status: Approved | Completion date: June 4, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 16: metal panel clading Date: September 19, 2014Permit type: Intake | Permit status: Approved | Completion date: June 5, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 17: pt cables level 17 thru 19 Date: September 24, 2014Permit type: Intake | Permit status: Approved | Completion date: September 3, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 19 : pts Date: October 13, 2014Permit type: Intake | Permit status: Approved | Completion date: September 24, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 19 : fireproofing Date: January 7, 2015Permit type: Intake | Permit status: Approved | Completion date: November 17, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs for glass canopy, elevator box and security rail Date: May 1, 2015Permit type: Intake | Permit status: Approved | Completion date: December 1, 2014 | Permit id: 2012-153461-Dfs | |||||
Dfs 21: fireproofing Date: May 1, 2015Permit type: Intake | Permit status: Approved | Completion date: April 16, 2015 | Permit id: 2012-153461-Dfs | |||||
Dfs 21: stairs 1,2,3 & 4 levels 1 to roof Date: April 3, 2015Permit type: Intake | Permit status: Approved | Completion date: February 13, 2015 | Permit id: 2012-153461-Dfs | |||||
Dfs 23 : for point supported glass canopies and skylight Date: April 20, 2015Permit type: Intake | Permit status: Approved | Completion date: February 4, 2015 | Permit id: 2012-153461-Dfs | |||||
Dfs 23 : mezzanine stairs Date: March 30, 2015Permit type: Intake | Permit status: Approved | Completion date: February 25, 2015 | Permit id: 2012-153461-Dfs | |||||
Dfs 25 : tie back anchors Date: March 30, 2015Permit type: Intake | Permit status: Approved | Completion date: February 25, 2015 | Permit id: 2012-153461-Dfs | |||||
Dfs 26 : glass guardrail Date: April 20, 2015Permit type: Intake | Permit status: Approved | Completion date: March 30, 2015 | Permit id: 2012-153461-Dfs | |||||
Dfs 27 : seismic bracing mechanical and rtus Date: May 26, 2015Permit type: Intake | Permit status: Approved | Completion date: May 11, 2015 | Permit id: 2012-153461-Dfs | |||||
Dfs 28 : curtain wall Permit type: Intake | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2012-153461-Dfs | |||||
Dfs 28 : curtain wall Permit type: Process management | Permit status: Closed | Completion date: June 5, 2015 | Permit id: 2012-153461-Dfs | |||||
Excavation/ shoring for proposed story tower mixed use residential (238 units) and ground floor retail. Date: August 20, 2013Permit type: Intake | Permit status: Approved | Completion date: March 20, 2013 | Permit id: 2012-153461-Exc | |||||
Fnd-01 garage/foundation for 3 new buildings no occupancy this pemit proposed story tower mixed use residential (238 units) and ground floor retail. Date: October 17, 2013Permit type: Intake | Permit status: Approved | Completion date: June 26, 2013 | Permit id: 2012-153461-Fnd | |||||
Revision to fnd 01, for boom and man hoists cut outs, and pour strip in area b (fnd-01 garage/foundation for 3 new buildings no occupancy this pemit)proposed story tower mixed use residential (238 units) and ground floor retail. Date: December 16, 2013Permit type: Intake | Permit status: Approved | Completion date: December 9, 2013 | Permit id: 2012-153461-Rev | |||||
Revision to fnd 01, see document for list of changesproposed story tower mixed use residential (238 units) and ground floor retail. Date: January 7, 2015Permit type: Intake | Permit status: Approved | Completion date: January 9, 2014 | Permit id: 2012-153461-Rev | |||||
Rev-3 for fnd permit - parking garage area a revisons to lid; parking garage area a & b: relocation of mechanical shafts (approved pts already reflect this change) Date: March 19, 2014Permit type: Intake | Permit status: Approved | Completion date: March 6, 2014 | Permit id: 2012-153461-Rev | |||||
Rev-4 for 2nd floor changes, and 21st floor changes (see comments for detail descirptions for each sheet.) Date: May 9, 2014Permit type: Intake | Permit status: Approved | Completion date: April 30, 2014 | Permit id: 2012-153461-Rev | |||||
Rev-5 for 3rd and 4th floor changes Date: May 9, 2014Permit type: Intake | Permit status: Approved | Completion date: May 5, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Intake | Permit status: Approved | Completion date: August 21, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Process management | Permit status: Closed | Completion date: August 21, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Process management | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Process management | Permit status: Closed | Completion date: November 20, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Process management | Permit status: Closed | Completion date: December 3, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Process management | Permit status: Closed | Completion date: December 22, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Planning and zoning | Permit status: Approved | Completion date: December 16, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Life safety | Permit status: Approved | Completion date: November 20, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Life safety | Permit status: Approved | Completion date: December 8, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Structural | Permit status: Approved | Completion date: September 19, 2014 | Permit id: 2012-153461-Rev | |||||
See documents for list of changes Permit type: Issuance | Permit status: Closed | Completion date: December 22, 2014 | Permit id: 2012-153461-Rev | |||||
Str 01: garage interiors and site package, includes living machine, all interior garage work, all site development, the balance of the structural work not previously permitted which includes the above the garage lid stem walls and walkway bridge elements. Note: structural sheets or details previously approved will be identified for reference only. Aproposed story tower mixed use residential (238 units) and ground floor retail. Date: December 8, 2014Permit type: Intake | Permit status: Approved | Completion date: December 23, 2013 | Permit id: 2012-153461-Str | |||||
Two 25 cfm doas, pthp for apartments, one 6, one 4 and one 2-ton wshp, elevator pressurization, restroom exhaust in wrapped joist, dryer and range exhaust, subduct trash, dryer, range & restroom on e-pwr, see 12-153462-co for plans Date: May 5, 2014Permit type: Intake | Permit status: Closed | Completion date: November 6, 2013 | Permit id: 2013-225369-000 | |||||
Two 15 cfm and one 45 cfm doas, four wshp, pthps for apartments, stair pressurization, elev. Lobbies, one 10t, one 5-ton gp w/smoke detection, one 2. 5t and one 2t gp, 20 cfm spa erv, elevator ds, e-gen plans w/12-153461-mg Date: May 5, 2014Permit type: Intake | Permit status: Closed | Completion date: November 20, 2013 | Permit id: 2013-230551-000 | |||||
Hvac controls 101 building Date: April 24, 2014Permit type: Intake | Permit status: Closed | Completion date: April 24, 2014 | Permit id: 2014-147919-000 | |||||
Plumbing fixtures for new construction; 48 backflow preventers, 337 cw, 337dw, 22 floor drains, 6 hb, 91 roof drains, 735 sink, 395 (tub/shower/sp), 395 wc, 3 wh, 9 other fixtures Date: May 12, 2014Permit type: Intake | Permit status: Closed | Completion date: May 12, 2014 | Permit id: 2014-155452-000 | |||||
337 unit building. Largest unit is 1746 sqft - oar 918 reduced fees apply only to residential units. Inspections for all dwelling units must be completed in (4) inspections. If additional inspections are required, they will be billed at the current reinspection fee for each additional inspection. Date: August 5, 2014Permit type: Intake | Permit status: Closed | Completion date: June 18, 2014 | Permit id: 2014-171147-000 | |||||
Gas piping and condenser water rough in piping Date: October 15, 2014Permit type: Intake | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-225378-000 | |||||
Sprinkler-install new fire sprinkler system per nfpa 13/14 20 edition and city of portalnd standards for new construction. Date: November 26, 2014Permit type: Intake | Permit status: Approved | Completion date: November 5, 2014 | Permit id: 2014-234251-000 | |||||
Convert bike storage to leasing office, change light fixtures and add new receptacles and house panel Date: October 5, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 12, 2015 | Permit id: 2015-246476-000 | |||||
F6/lloyd block ground flr leasing office - demo existing bike storage stalls and convert to leasing office, new wall partitions, relites, cabintry, finishing, lighting modifications, elec Date: October 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 8, 2015 | Permit id: 2015-248451-000 | |||||
F3/ install 3 ton heat pump, associated piping, connect to existing ductwork and grilles Date: November 30, 2015Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269089-000 | |||||
Power - lloyd block ground flr leasing office - demo existing bike storage stalls and convert to leasing office, new wall partitions, relites, cabintry, finishing, lighting modifications, elec Permit type: Intake | Permit status: Closed | Completion date: December 5, 2015 | Permit id: 2015-273575-000 | |||||
F24/ garden bar, ti; landlord work at concrete slab, Date: February 12, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120641-000 | |||||
F24/ garden bar, ti; landlord work , two new restrooms, Date: April 8, 2016Permit type: Intake | Permit status: Closed | Completion date: February 12, 2016 | Permit id: 2016-120644-000 | |||||
Garden bar- landlord work- alterations to the fire sprinklers as needed for t. I.- 2 heads total Date: February 12, 2016Permit type: Intake | Permit status: Closed | Completion date: February 12, 2016 | Permit id: 2016-120805-000 | |||||
Plumbing renovation at astor tower for garden bar ti2-gi, 4-fs, 1-ms, 1-im, 2-hs, 2-wc, 2-lav Date: February 22, 2016Permit type: Intake | Permit status: Closed | Completion date: February 22, 2016 | Permit id: 2016-124159-000 | |||||
Power - garden bar, ti; landlord work , two new restrooms Date: March 3, 2016Permit type: Intake | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2016-130188-000 | |||||
B1/ garden bar - tenant build-out hvac equipment, ducting and condenser water supply Date: March 28, 2016Permit type: Intake | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2016-139664-000 | |||||
B1/ tenant build-out including hvac, equipment, ducting and condenser water supply. See separate permits for landlord work Date: March 23, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139745-000 | |||||
Power - garden bar - tenant build-out hvac equipment, ducting and condenser water supply Permit type: Intake | Permit status: Closed | Completion date: April 2, 2016 | Permit id: 2016-144367-000 | |||||
F18/ little big burger tenant build-out Date: April 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2016-147254-000 | |||||
F18/ little big burger tenant build-out - hvac including equipment, ducting and condenser water supply Date: April 12, 2016Permit type: Intake | Permit status: Closed | Completion date: April 7, 2016 | Permit id: 2016-147282-000 | |||||
Hvac control - garden bar, ti; landlord work , two new restrooms, Date: April 8, 2016Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148033-000 | |||||
Hvac control - little big burger tenant build-out - hvac including equipment, ducting and condenser water supply Date: April 8, 2016Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148037-000 | |||||
Dfs 28 : curtain wall Date: November 10, 2015Permit type: Intake | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2012-153461-Dfs | |||||
Dfs 29 : steel stairs connecting p1 to l1 in blk 1 (zebra market ti) Date: March 22, 2016Permit type: Intake | Permit status: Approved | Completion date: March 2, 2016 | Permit id: 2012-153461-Dfs | |||||
Rev 7 : includes new elevator shaft from p1 to l1, and entry bridge on green street Date: November 10, 2015Permit type: Intake | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Intake | Permit status: Approved | Completion date: January 29, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Process management | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Process management | Permit status: Closed | Completion date: February 9, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Life safety | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Structural | Permit status: Approved | Completion date: February 3, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and/or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Issuance | Permit status: Closed | Completion date: February 9, 2016 | Permit id: 2012-153461-Rev | |||||
Tele-data for new construction Date: September 22, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: September 16, 2015 | Permit id: 2014-216099-000 | |||||
Alarm-das system for block 101 and parking garage Date: August 14, 2015Permit type: Intake | Permit status: Approved | Completion date: April 15, 2015 | Permit id: 2015-111139-000 | |||||
Hazardous/tank - installation of emergency back up generator with 6 gallon sub-base tank Date: August 28, 2015Permit type: Intake | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2015-170814-000 | |||||
F6 lloyd block ground flr leasing office - demo existing bike storage stalls and convert to leasing office, new wall partitions, relites, cabintry, finishing, lighting modifications, elec Date: October 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 8, 2015 | Permit id: 2015-248451-000 | |||||
F3 install 3 ton heat pump, associated piping, connect to existing ductwork and grilles Date: November 30, 2015Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269089-000 | |||||
Power - lloyd block ground flr leasing office - demo existing bike storage stalls and convert to leasing office, new wall partitions, relites, cabintry, finishing, lighting modifications, elec Permit type: Intake | Permit status: Closed | Completion date: December 5, 2015 | Permit id: 2015-273575-000 | |||||
F24 garden bar, ti; landlord work at concrete slab, Date: February 12, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120641-000 | |||||
F24 garden bar, ti; landlord work , two new restrooms, Date: April 8, 2016Permit type: Intake | Permit status: Closed | Completion date: February 12, 2016 | Permit id: 2016-120644-000 | |||||
B1 garden bar - tenant build-out hvac equipment, ducting and condenser water supply Date: March 28, 2016Permit type: Intake | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2016-139664-000 | |||||
B1 tenant build-out including hvac, equipment, ducting and condenser water supply. See separate permits for landlord work Date: March 23, 2016Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2016-139745-000 | |||||
Power - garden bar - tenant build-out hvac equipment, ducting and condenser water supply Permit type: Intake | Permit status: Closed | Completion date: April 2, 2016 | Permit id: 2016-144367-000 | |||||
F18 little big burger tenant build-out Date: April 7, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2016-147254-000 | |||||
F18 little big burger tenant build-out - hvac including equipment, ducting and condenser water supply Date: April 12, 2016Permit type: Intake | Permit status: Closed | Completion date: April 7, 2016 | Permit id: 2016-147282-000 | |||||
(proposed story tower mixed use residential (238 units) and ground floor retail.)(2 4 14 corrections recieved - scope revised to include 337 living units) Date: April 18, 2014Permit type: Intake | Permit status: Approved | Completion date: November 20, 2013 | Permit id: 2012-153461-000 | |||||
Excavation shoring for proposed story tower mixed use residential (238 units) and ground floor retail. Date: August 20, 2013Permit type: Intake | Permit status: Approved | Completion date: March 20, 2013 | Permit id: 2012-153461-Exc | |||||
Fnd-01 garage foundation for 3 new buildings no occupancy this pemit proposed story tower mixed use residential (238 units) and ground floor retail. Date: October 17, 2013Permit type: Intake | Permit status: Approved | Completion date: June 26, 2013 | Permit id: 2012-153461-Fnd | |||||
Revision to fnd 01, for boom and man hoists cut outs, and pour strip in area b (fnd-01 garage foundation for 3 new buildings no occupancy this pemit)proposed story tower mixed use residential (238 units) and ground floor retail. Date: December 16, 2013Permit type: Intake | Permit status: Approved | Completion date: December 9, 2013 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Intake | Permit status: Approved | Completion date: January 29, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Process management | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Process management | Permit status: Closed | Completion date: February 9, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Life safety | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Structural | Permit status: Approved | Completion date: February 3, 2016 | Permit id: 2012-153461-Rev | |||||
Rev 8 : revise ground floor structural lid by intstalling 4 - 6 of cell-crete with a denisty of pcf to encapsulate and or partially encapsulate the electrical conduit as to creat a suitable surface for the geoform to bear on. This is only in areas where multiple electrical conduits in the interstitial space prevent the geofoam to bear directly on the lid. Permit type: Issuance | Permit status: Closed | Completion date: February 9, 2016 | Permit id: 2012-153461-Rev | |||||
Two 15 cfm and one 45 cfm doas, four wshp, pthps for apartments, stair pressurization, elev. Lobbies, one 10t, one 5-ton gp w smoke detection, one 2. 5t and one 2t gp, 20 cfm spa erv, elevator ds, e-gen plans w 12-153461-mg Date: May 5, 2014Permit type: Intake | Permit status: Closed | Completion date: November 20, 2013 | Permit id: 2013-230551-000 | |||||
Plumbing fixtures for new construction; 48 backflow preventers, 337 cw, 337dw, 22 floor drains, 6 hb, 91 roof drains, 735 sink, 395 (tub shower sp), 395 wc, 3 wh, 9 other fixtures Date: May 12, 2014Permit type: Intake | Permit status: Closed | Completion date: May 12, 2014 | Permit id: 2014-155452-000 | |||||
Sprinkler-install new fire sprinkler system per nfpa 13 14 20 edition and city of portalnd standards for new construction. Date: November 26, 2014Permit type: Intake | Permit status: Approved | Completion date: November 5, 2014 | Permit id: 2014-234251-000 | |||||
Hazardous tank - installation of emergency back up generator with 6 gallon sub-base tank Date: August 28, 2015Permit type: Intake | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2015-170814-000 |