ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
With low voltage devices for tv and telephone. Date: June 11, 2001Permit type: Electrical permit | Permit status: Finaled | Completion date: September 11, 2001 | Current use: Single family dwelling | Permit id: 250524 | |||||
Building residential Date: April 6, 2001 Value: $15,000Permit status: Finaled | Completion date: September 11, 2001 | Current use: Single family dwelling | Permit id: 243968 | |||||
Temporarily place a dumpster within the public right of way. The permittee agrees to hold montgomery county harmless from any liability associated with the placement of dumpsters in the public right of way. Dumpster locations, barricades and/or lights are to be placed as directed by the dps inspector. Date: June 4, 2001Permit type: Public right of way | Permit status: Completed | Current use: Dumpster | Permit id: 212150 | |||||
On hebard st (house #10413) repair gas main in accordance with washington gas plan no. 55821. Construct utility pavement patch in kind as directed by the inspector in the field. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current maryland state highway administration (msha) specifications and montgomery county specifications for utility construction permit. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector chris cary at 301-370-3686 before and after installation. Date: February 9, 2007Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 251640 | |||||
On hebard street (house #10413)pave cut, install 2 inch plastic gas service in accordance with washington gas plan no. 121448. Construct utility pavement patch in kind as directed by the inspector in the field. All above & below grade facilities shall be placed in public utility easements or adjacent to the right-of-way line unless approved otherwise by the mcdps right-of-way (row) inspector. Work shall comply with the current montgomery county specifications for utility construction permit. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector chris cary at 301-370-3686 before and after installation. Date: February 14, 2011Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 268075 |