| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition or move p Date: May 28, 2015Permit status: Finaled | Completion date: August 5, 2015 | Current use: Single family dwelling | Permit id: 711727 | |||||
1 alarm system and low voltage Date: November 14, 2002Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 292464 | |||||
Building residential Date: May 8, 2001 Value: $2,000Permit status: Issued | Current use: Shed | Permit id: 247496 | |||||
Bore roadway; dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3480248. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: May 2, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 352268 | |||||
Permittee must complete work before 7/1/15and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Abandon gas service in accordance with washington gas plan no. 497274. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: April 15, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 332809 |