ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Rebuild bond tracking ps14a79556 Date: June 27, 2014Permit type: Demolition or move p | Permit status: Completed | Completion date: July 23, 2015 | Current use: Single family dwelling | Permit id: 666155 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: August 10, 2015Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 723636 | |||||
Electrical permit Date: September 1, 2015Permit status: Issued | Current use: Single family dwelling | Permit id: 725943 | |||||
Demo/rebuild Date: June 30, 2014 Value: $300,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 666153 | |||||
Mechanical permit Date: October 7, 2003Permit status: Issued | Current use: Single family dwelling | Permit id: 320124 | |||||
Replace 1 pole,1 ooverhead transformer, build conduit; install cable and associated equipment in accordance with pepco plan no. 3448264. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: July 2, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 316177 | |||||
A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Abandon and install gas service in accordance with washington gas plan no. 333235. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work.
|