ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apartment # 3r. Install new window stops as follows. Kitchen and bathroom. Note . Tenant refused one w/g due to a/c at bedroom. At the time of this Date: July 19, 2010 Value: $191Permit type: Gc | Permit id: Eb04691 | |||||
Apartment # 3r. Install new window stops as follows. Kitchen and bathroom. Note . Tenant refused one w g due to a c at bedroom. At the time of this Date: July 19, 2010 Value: $191Permit type: Gc | Permit id: Eb04691 | |||||
Apt # 2l bathroom. Trace and repair all concealed water leaks from above apartments, roof or exterior wall. Water comes down when rains and when tenan Date: December 17, 2012Permit type: Gc | Permit id: Ed11687 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: February 9, 2015Permit type: Delead | Permit id: Ef14872 | |||||
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: March 23, 2015Permit type: Delead | Permit id: Ef17735 | |||||
R/c 20141419802 apt 3l: as per the requirement contract with hpd, provide and install 2 window guards throughout apartment. Remove all work rela Date: March 11, 2015Permit type: Gc | Permit id: Ef14832 | |||||
R c 20141419802 apt 3l: as per the requirement contract with hpd, provide and install 2 window guards throughout apartment. Remove all work rela Date: March 11, 2015Permit type: Gc | Permit id: Ef14832 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 22, 2010Permit type: Delead | Permit id: Eb04708 |