ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
F16/ mechanical replacement; new water condenser system, boiler condenser system Date: April 27, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 27, 2015 | Permit id: 2015-159827-000 | |||||
F16/ mechanical replacement; new water condenser system, boiler condenser system Permit type: Intake | Permit status: Closed | Completion date: April 27, 2015 | Permit id: 2015-159828-000 | |||||
Pwr - mechanical replacement; new water condenser system, boiler condenser system - pwr Date: May 6, 2015Permit type: Intake | Permit status: Closed | Completion date: May 6, 2015 | Permit id: 2015-166112-000 | |||||
Plumbing renovation at multnomah county court housecondensate drains and sump pump Date: May 11, 2015Permit type: Intake | Permit status: Closed | Completion date: May 11, 2015 | Permit id: 2015-167868-000 | |||||
Hvac control wiring - mechanical replacement; new water condenser system, boiler condenser system - hvac control wiring Date: June 5, 2015Permit type: Intake | Permit status: Closed | Completion date: June 5, 2015 | Permit id: 2015-181215-000 | |||||
Electric surge destroyed existing fire suppresion control panel main control board. Replace existing fire suppresion control panel. Provide one for one change-out of existing detection devices. Utilize addressable monitor modules for existing conventional devices. Replace existing conventional smoke detectors with addressable smoke detection. Application and 3 sets of plans and calcs provided. Pr# cp08. 11. 04f Date: December 15, 2011Permit type: Intake | Permit status: Closed | Completion date: December 15, 2011 | Permit id: 2011-201524-000 | |||||
F 10/ floors 3,5 & 7 ceiling lighting efficiency replacement & repairpr# cp08. 11. 62 Date: June 29, 2015Permit type: Intake | Permit status: Closed | Completion date: March 12, 2012 | Permit id: 2012-119585-000 | |||||
Lighting upgrades pr# cp08. 11. 62 Date: July 19, 2013Permit type: Intake | Permit status: Closed | Completion date: July 19, 2013 | Permit id: 2013-182087-000 | |||||
Meeting with client Date: July 23, 2014Permit type: Reviews | Permit status: Approved | Completion date: July 23, 2014 | Permit id: 2014-188393-000 | |||||
Approval of replacement rooftop chiller to be installed in the same location as the existing unit, with the addition supplemental horizontal structure per the approved site plans, exhibits c-1 through c-4, signed and dated 11/05/2015, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 4. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-217763 hr. Date: November 9, 2015Permit type: Land use review | Permit status: Completed | Completion date: August 21, 2015 | Permit id: 2015-217763-000 | |||||
Fire alarm wiring - replace scan alert with aes redio mesh Date: October 2, 2015Permit type: Intake | Permit status: Closed | Completion date: October 2, 2015 | Permit id: 2015-245931-000 | |||||
Plumbing renovation at mcc to replace wh in basement Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-112039-000 | |||||
F16/ mechanical replacement; new water condenser system, boiler condenser system, water heater tanks Permit type: Intake | Permit status: Closed | Completion date: April 27, 2015 | Permit id: 2015-159828-000 | |||||
Approval of replacement rooftop chiller to be installed in the same location as the existing unit, with the addition supplemental horizontal structure per the approved site plans, exhibits c-1 through c-4, signed and dated 11 05 2015, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 4. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-217763 hr. Date: November 9, 2015Permit type: Land use review | Permit status: Completed | Completion date: August 21, 2015 | Permit id: 2015-217763-000 | |||||
F 10 floors 3,5 & 7 ceiling lighting efficiency replacement & repairpr# cp08. 11. 62 Date: June 29, 2015Permit type: Intake | Permit status: Closed | Completion date: March 12, 2012 | Permit id: 2012-119585-000 | |||||
F16 mechanical replacement; new water condenser system, boiler condenser system Date: April 27, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 27, 2015 | Permit id: 2015-159827-000 | |||||
F16 mechanical replacement; new water condenser system, boiler condenser system, water heater tanks Permit type: Intake | Permit status: Closed | Completion date: April 27, 2015 | Permit id: 2015-159828-000 | |||||
Multnomah co. Court house room 214 , converting jury room to child "drop in center" for 6 children maximum. Move & add one each nonbearing wall. Date: September 26, 2000Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: June 8, 2001 | Current use: Assembly | Permit id: 2000-169316-000 | |||||
Add hc ramp to rm 604 Date: July 12, 2002Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 14, 2003 | Current use: Assembly | Permit id: 2002-130319-000 | |||||
Ada upgrade to existing bathroom; new window; new hvac & plumbing Date: August 30, 2002Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Issued | Current use: Business | Permit id: 2002-138112-000 | |||||
Ti remodel sw and se corner of 6th floor maintain fully sprinkled and alarmed under separate permit from the fire marshals office.(comments) Date: September 10, 2003Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 13, 2004 | Current use: Business | Permit id: 2003-107554-000 | |||||
Scaffold for sidewalk protection during installation of power cables Date: March 5, 2004Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: April 11, 2005 | Current use: Utility | Permit id: 2004-009601-000 | |||||
Construct one joint use pole offset foundations that will be adjacent to basement vault on sw 5th ave Date: September 27, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 15, 2008 | Current use: Business | Permit id: 2007-161409-000 |