ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Franklin street ne between 12th street ne and brentwood road ne, replace 1661 of existing main. Douglas street ne between 10th street ne and 12th street ne, replace 5 of exist maindwg; bca # 2273 -4 & 5. Only 1,2 per permit before permanent restoration--then continue the balance. Original paid permit fee was 3,322 paid on 12 15 06. Extension fee 19. Only, per j.. Amaya must coordinate with other utilities as needed to access row. Date: November 30, 2006 Contractor: Washington GasPermit type: Excavation; install 2 inch plastic within existing | Permit status: Permit expired | Expiration date: March 22, 2007 | Permit id: Pa24006 | |||||
SCORE 100 Abandon 1,005 of steel and 76 of 4" cast iron gas mains by inserting 1325 and direct burial of 95 of 2" plastic gas mains. Request for staging area and day permit. Wr #441136 & bca # 10295-1. Must complete first 1,2 feet, and fully restore before completing final portion. Holiday restrictions in place. Required coordination between utilities and ddot accessing row--nearby ddot project for spot resurfacing. 8699 16th nw & roxanna and 6201 16th street nw & north portal and 38 primrose between 14th & northgate nw. Must inform impacted residents and give notice to ancs notices and signs posted 7 days before start. Day renewal. Date: March 16, 2007 Contractor: Washington GasPermit type: Excavation; install 2 inch plastic pipe within existing | Permit status: Permit expired | Expiration date: April 22, 2007 | Permit id: Pa25692 | |||||
SCORE 100 Franklin street ne b t 12th street, ne & brentwood road ne replace 1661 of existing main. Douglas street ne b t 10th street & 12th street ne replace 5 of existing main. Bca #2273 4 & 5. Wr #227699. Permit # 58500. Old number 43816. Notification signs must be up to date, comprehensive, and removed upon completion must inform neighbors, anc and council as appropriate must complete first 1,2 ft and fully restore before completing and fully restoring subsequent 1,2 ft. Portions. Must coordinate with other utilities regarding access to row. Any disturbed area shall be restored to its original condition according to dc standard specs for highway and structures and standard drawings for highway and structures (blue book 2005) any lane closure or changes to traffic pattern should be approved by tsa. Any connections to public utility lines should be approved by wasa or appropriate agency wheel chair ramps must be ada compliant. Date: April 2, 2007 Contractor: Washington GasPermit type: Excavation; replacement/brookland phase 2 | Permit status: Permit expired | Expiration date: August 30, 2007 | Permit id: Pa26012 | |||||
SCORE 100 Extension of permit#a26012. Franklin st b t 12th st & brentwood rd,ne replace 1661of existing main douglas st,neb t 10th st & 12th st,nereplace 560ofexist main bca#2273 4& 5 wr#227699 request for staging area permit & 90-day duration. Cut in roadway cut 4x5 . Attached plans and conditions are part of this permit Date: August 22, 2007 Contractor: Washington GasPermit type: Excavation; extension of permit #pa26012 | Permit status: Permit expired | Expiration date: November 30, 2007 | Permit id: Pa29661 |