ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 Please pay balance due change the existing 3rd floor antifreeze fire sprinkler system to a wet system. We will add zone control valves to the existing system and new inspectors test per marriott standards Date: December 14, 2015 Contractor: Safety Team Llc ThePermit type: Fire | Permit status: In for review | Permit id: Bld2015-09802 | |||||
SCORE 100 Addition of two monitor modules on the third floor to monitor the new water flow switch and tamper switch on the fire sprinkler system. Date: February 16, 2016 Contractor: Aaa Fire Safety And Alarm IncPermit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-00478 | |||||
Zoning administration Date: February 10, 2016Permit status: Active | Permit id: Plnzad2016-0009 | |||||
SCORE 100 Addition of two monitor modules on the third floor to monitor the new water flow switch and tamper switch on the fire sprinkler system. Date: February 16, 2016 Contractor: Aaa Fire Safety And Alarm, IncPermit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-00478 | |||||
SCORE 99 Please pay balance due change the existing 3rd floor antifreeze fire sprinkler system to a wet system. We will add zone control valves to the existing system and new inspectors test per marriott standards Date: December 14, 2015 Contractor: Safety Team, Llc, ThePermit type: Fire | Permit status: In for review | Permit id: Bld2015-09802 | |||||
Zoning verification for 1 w. 4 s. Date: June 19, 2015Permit type: Zoning administration | Permit status: Active | Permit id: Plnzad2015-0048 |