ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved | Completion date: January 13, 2015 | Permit id: 2015-104097-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Application | Permit status: Approved | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Issuance/intake | Permit status: Intake | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: March 12, 2015 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: August 20, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: August 12, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: July 9, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Planning and zoning | Permit status: Approved | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Life safety | Permit status: Approved | Completion date: August 25, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Life safety | Permit status: Not reqd | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Structural | Permit status: Approved | Completion date: August 28, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Structural | Permit status: Required | Completion date: August 12, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Special inspections review | Permit status: Approved | Completion date: August 13, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Fire bureau | Permit status: Approved | Completion date: July 11, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Transportation | Permit status: Approved | Completion date: March 19, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Transportation | Permit status: Approved | Completion date: March 14, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Transportation | Permit status: Closed | Completion date: March 14, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 10, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Parks bureau | Permit status: Approved | Completion date: March 11, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Permit expiration | Permit status: Extended | Completion date: May 15, 2015 | Permit id: 2014-124516-000 | |||||
Hot tub wiring. Date: June 20, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: July 15, 2014 | Permit id: 2014-172519-000 | |||||
Fire sprinkler - relocate existing fire hose valve supply main from north side of dock to the south side of the dock Date: November 19, 2014Permit type: Intake | Permit status: Approved | Completion date: October 22, 2014 | Permit id: 2014-227590-000 | |||||
Solar - 3. 08kw roof top mounted system - non-prescriptive / floating home Date: August 28, 2015Permit type: Application | Permit status: Approved | Completion date: August 7, 2015 | Permit id: 2015-214029-000 | |||||
Extend bedrooms heater circuit and wire newly framed interior walls with 4 plugs and 3 wall sconces. Add new dryer and washer circuit. Date: October 6, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 9, 2015 | Permit id: 2015-247237-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Application | Permit status: Approved | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Issuance/intake | Permit status: Intake | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: March 12, 2015 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: August 20, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: July 9, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: August 12, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: March 25, 2016 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Planning and zoning | Permit status: Approved | Completion date: March 28, 2016 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Planning and zoning | Permit status: Approved | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Site development | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Life safety | Permit status: Approved | Completion date: August 25, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Life safety | Permit status: Not reqd | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Structural | Permit status: Approved | Completion date: August 28, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Structural | Permit status: Required | Completion date: August 12, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Special inspections review | Permit status: Approved | Completion date: August 13, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Fire bureau | Permit status: Approved | Completion date: July 11, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Transportation | Permit status: Approved | Completion date: March 19, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Transportation | Permit status: Approved | Completion date: March 14, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Transportation | Permit status: Closed | Completion date: March 14, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 10, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Parks bureau | Permit status: Approved | Completion date: March 11, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Permit expiration | Permit status: Extended | Completion date: May 15, 2015 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Permit expiration | Permit status: Extended | Completion date: November 17, 2015 | Permit id: 2014-124516-000 | |||||
Ac system to replace existing ac system Date: July 9, 2015Permit type: Mechanical inspections | Permit status: Approved | Completion date: August 28, 2015 | Permit id: 2015-199121-000 | |||||
Solar - 3. 08kw roof top mounted system - non-prescriptive floating home Date: August 28, 2015Permit type: Application | Permit status: Approved | Completion date: August 7, 2015 | Permit id: 2015-214029-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Application | Permit status: Approved | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Issuance/intake | Permit status: Intake | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: March 12, 2015 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: August 20, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: July 9, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: August 12, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Process management | Permit status: Closed | Completion date: March 25, 2016 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Planning and zoning | Permit status: Approved | Completion date: March 28, 2016 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Planning and zoning | Permit status: Approved | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Site development | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Life safety | Permit status: Approved | Completion date: August 25, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Life safety | Permit status: Not reqd | Completion date: March 7, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Structural | Permit status: Approved | Completion date: August 28, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Structural | Permit status: Required | Completion date: August 12, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Special inspections review | Permit status: Approved | Completion date: August 13, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Fire bureau | Permit status: Approved | Completion date: July 11, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Transportation | Permit status: Approved | Completion date: March 19, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Transportation | Permit status: Approved | Completion date: March 14, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Transportation | Permit status: Closed | Completion date: March 14, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 10, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Parks bureau | Permit status: Approved | Completion date: March 11, 2014 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Permit expiration | Permit status: Extended | Completion date: May 15, 2015 | Permit id: 2014-124516-000 | |||||
Demo stairway from east boat moorage walkway to existing east end of lower gangway; replace lower gangway; install new marginal walkway connecting at the end of new gangway through the existing east covered boat moorage building to the existing main walkway at east side of boat moorage building Permit type: Permit expiration | Permit status: Extended | Completion date: November 17, 2015 | Permit id: 2014-124516-000 | |||||
This permit set up to final structural, mechanical, plumbing and electrical for floating structure original permit issued 7 3 91 under permit 91-104090. (see comments) also see comments regarding walkways on either side of structure shown on plans. Date: August 9, 2007Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: March 21, 2008 | Current use: Floating home | Permit id: 2007-153408-000 | |||||
9 09 - j eldredge - final inspection approval of this floatiing home is based upon code standards for the early 90s, when the residence was constructed. Set up for final inspection of floating home - see parent iq folder Date: August 3, 2010Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: September 9, 2010 | Current use: Floating home | Permit id: 2010-159232-000 | |||||
Add 1 sq ft to existing floating home to enlarge living room Date: May 11, 2010Client: Southeast Uplift Neighborhood Program | Permit type: Addition | Permit status: Final | Completion date: November 30, 2010 | Current use: Floating home | Permit id: 2010-127387-000 | |||||
New 3,5 sf parking canopy; new curbs, paving, and stormwater planters Date: June 25, 2012Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: July 23, 2013 | Current use: Storage | Permit id: 2012-116757-000 | |||||
New 5 sf trash enclosure Date: June 25, 2012Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: March 20, 2013 | Current use: Utility | Permit id: 2012-116762-000 | |||||
New 4 sf bike storage Date: June 25, 2012Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: March 6, 2013 | Current use: Utility | Permit id: 2012-116766-000 | |||||
New 2,4 sf parking canopy Date: June 25, 2012Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: March 6, 2013 | Current use: Storage | Permit id: 2012-116761-000 | |||||
Repair and replacement of eight 6 x 12 stringers under existing floating home. No change in in size or configuration of morage or slip. Add 9 fixtures Date: March 28, 2012Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: May 10, 2012 | Current use: Floating home | Permit id: 2012-124000-000 | |||||
Solar installation of 3. 36kw rooftop pv system, prescriptive. Date: August 13, 2013Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: August 26, 2013 | Current use: Floating home | Permit id: 2013-191868-000 | |||||
Legalize construction of a 96 sf floating storage building - no habitable space Date: December 11, 2013Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: March 19, 2014 | Current use: Accessory structure | Permit id: 2013-236877-000 | |||||
Remove existing stairway from east boat moorage walkway to middle of the existing lower gangway; replace lower gangway; reconnect the stairway at the original location between the new gangway and the existing main walkway at east side of boat moorage building Date: July 20, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Issued | Current use: Storage | Permit id: 2014-124516-000 | |||||
Construct new 416 sf accessory structure on existing float at slip 14, includes bedroom, bathroom and living room, not to be used as adu. Plumbing, mechanical, electrical permits to be obtained separately Date: November 14, 2016Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Issued | Current use: Accessory structure | Permit id: 2016-203489-000 | |||||
Renovating existing 6 sf float deck and attaching it to house boat float Date: October 24, 2008Permit type: Alteration | Permit status: Final | Completion date: December 3, 2008 | Current use: Floating home | Permit id: 2008-171771-000 |