| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Temp power pole Date: November 11, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 13, 2014 | Permit id: 2014-236513-000 | |||||
Plumbing for new 5story multi use building Date: December 5, 2014Permit type: Intake | Permit status: Closed | Completion date: December 5, 2014 | Permit id: 2014-246132-000 | |||||
Sprinkler - fire sprinkler system for new building Permit type: Intake | Permit status: Approved | Completion date: January 8, 2015 | Permit id: 2015-102114-000 | |||||
Sprinkler - fire sprinkler system for new building Permit type: Intake | Permit status: Closed | Completion date: January 8, 2015 | Permit id: 2015-102114-000 | |||||
Sprinkler - fire sprinkler system for new building Permit type: Fire bureau | Permit status: Completed | Completion date: January 8, 2015 | Permit id: 2015-102114-000 | |||||
Underground conduits - hourly rate Date: February 4, 2015Permit type: Intake | Permit status: Closed | Completion date: February 4, 2015 | Permit id: 2015-114745-000 | |||||
New office building - shell Date: March 5, 2015Permit type: Intake | Permit status: Closed | Completion date: February 20, 2015 | Permit id: 2015-122175-000 | |||||
San conn: 243 lf of 24 vsp combo main, approx d=13, in ne davis st. Contractor shall build new 6 branch per std p-262 and tap 24 sewer. Contractor to verify all depths and locations in field Date: March 20, 2015Permit type: Intake | Permit status: Closed | Completion date: March 20, 2015 | Permit id: 2015-137474-000 | |||||
Six 5-ton gas packs, four 5-ton split heat pumps with economizer mixing boxes and barometric reliev w/mod interlocked w/economizer function Permit type: Planning and zoning | Permit status: Approved | Completion date: March 24, 2015 | Permit id: 2015-139116-000 | |||||
Alarm- install fire alarm system for new building Date: June 17, 2015Permit type: Intake | Permit status: Approved | Completion date: May 15, 2015 | Permit id: 2015-171568-000 | |||||
New 5 story mixed use building with 4 stories of wood frame over 1 story concrete podium. Upper floor proposed wholesale or industrial service use, mid floors proposed manufacturing, first floor proposed retail and parking. Date: November 21, 2014Permit type: Application | Permit status: Approved | Completion date: June 27, 2014 | Permit id: 2014-176360-000 | |||||
Dfs for seismic rod hold down system Date: February 19, 2015Permit type: Application | Permit status: Approved | Completion date: February 9, 2015 | Permit id: 2014-176360-Dfs | |||||
Dfs for post tension deck Date: March 6, 2015Permit type: Application | Permit status: Approved | Completion date: February 26, 2015 | Permit id: 2014-176360-Dfs | |||||
Dfs for curtain walls Date: May 5, 2015Permit type: Application | Permit status: Approved | Completion date: March 31, 2015 | Permit id: 2014-176360-Dfs | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Permit type: Application | Permit status: Approved | Completion date: March 2, 2015 | Permit id: 2014-176360-Rev | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Permit type: Issuance/intake | Permit status: Intake | Completion date: March 2, 2015 | Permit id: 2014-176360-Rev | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Permit type: Process management | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2014-176360-Rev | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Permit type: Process management | Permit status: Closed | Completion date: March 10, 2015 | Permit id: 2014-176360-Rev | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Permit type: Planning and zoning | Permit status: Not reqd | Completion date: March 2, 2015 | Permit id: 2014-176360-Rev | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Permit type: Life safety | Permit status: Approved | Completion date: March 4, 2015 | Permit id: 2014-176360-Rev | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Permit type: Structural | Permit status: Required | Completion date: March 4, 2015 | Permit id: 2014-176360-Rev | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Permit type: Structural | Permit status: Approved | Completion date: March 4, 2015 | Permit id: 2014-176360-Rev | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Permit type: Issuance | Permit status: Approved | Completion date: March 10, 2015 | Permit id: 2014-176360-Rev | |||||
Revision to update sheet at11 added 2x4 compression post notesrevision to dfs o1 Permit type: Application | Permit status: Approved | Completion date: March 31, 2015 | Permit id: 2014-176360-Rev | |||||
Revision to update sheet at11 added 2x4 compression post notesrevision to dfs o1 Permit type: Issuance/intake | Permit status: Intake | Completion date: March 31, 2015 | Permit id: 2014-176360-Rev | |||||
Revision to update sheet at11 added 2x4 compression post notesrevision to dfs o1 Permit type: Process management | Permit status: Closed | Completion date: April 8, 2015 | Permit id: 2014-176360-Rev | |||||
Revision to update sheet at11 added 2x4 compression post notesrevision to dfs o1 Permit type: Process management | Permit status: Closed | Completion date: May 3, 2015 | Permit id: 2014-176360-Rev | |||||
Revision to update sheet at11 added 2x4 compression post notesrevision to dfs o1 Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 27, 2015 | Permit id: 2014-176360-Rev | |||||
Revision to update sheet at11 added 2x4 compression post notesrevision to dfs o1 Permit type: Life safety | Permit status: Approved | Completion date: April 14, 2015 | Permit id: 2014-176360-Rev | |||||
Revision to update sheet at11 added 2x4 compression post notesrevision to dfs o1 Permit type: Structural | Permit status: Approved | Completion date: April 10, 2015 | Permit id: 2014-176360-Rev | |||||
Revision to update sheet at11 added 2x4 compression post notesrevision to dfs o1 Permit type: Issuance | Permit status: Approved | Completion date: May 3, 2015 | Permit id: 2014-176360-Rev | |||||
Approval of an adjustment to reduce the size of the required loading space (33. 266. 310. D) for a new 1/8 block speculative mixed-use industrial building at 1 ne 6th avenue from an a stall (35 by feet with 13 feet clearance) to a b stall (18 by 9 feet with feet clearance). This approval is granted based on the approved revised drawing set, exhibits c. 1 through c. 3, all signed and dated october 22, 2014, and subject to the following condition:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 3. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-196123 ad. Date: October 24, 2014Permit type: Land use review | Permit status: Completed | Completion date: August 12, 2014 | Permit id: 2014-196123-000 | |||||
Pbot pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: October 23, 2014 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: October 9, 2014 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Not reqd | Completion date: October 9, 2014 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Received | Completion date: September 23, 2014 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: September 23, 2014 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Completed | Completion date: October 22, 2014 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Billed | Completion date: January 21, 2015 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: October 23, 2014 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: October 24, 2014 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Bond/insurance pw | Permit status: Approved | Completion date: November 18, 2014 | Permit id: 2014-216595-000 | |||||
Pbot pw permit Permit type: Pre-issuance pw | Permit status: Signed | Completion date: November 18, 2014 | Permit id: 2014-216595-000 | |||||
Install cctv cameras, (1) limited energy circuit Date: August 1, 2015Permit type: Intake | Permit status: Closed | Completion date: August 1, 2015 | Permit id: 2015-210514-000 | |||||
Install thermostat for roof top hvac equipment Date: September 16, 2015Permit type: Intake | Permit status: Closed | Completion date: September 16, 2015 | Permit id: 2015-237235-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Application | Permit status: Approved | Completion date: February 25, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Issuance/intake | Permit status: Intake | Completion date: February 25, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: March 1, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: April 11, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: March 31, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Planning and zoning | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Site development | Permit status: Not reqd | Completion date: March 1, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Life safety | Permit status: Approved | Completion date: April 18, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Structural | Permit status: Not reqd | Completion date: March 3, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Fire bureau | Permit status: Approved | Completion date: April 18, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Environmental services | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Environmental services | Permit status: Approved | Completion date: March 8, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Transportation | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Transportation | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 2, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 1, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Parks bureau | Permit status: Approved | Completion date: April 1, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Application | Permit status: Approved | Completion date: February 25, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Issuance/intake | Permit status: Intake | Completion date: February 25, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: March 1, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: March 31, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Planning and zoning | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Site development | Permit status: Not reqd | Completion date: March 1, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Life safety | Permit status: Approved | Completion date: April 18, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Structural | Permit status: Not reqd | Completion date: March 3, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Fire bureau | Permit status: Approved | Completion date: April 18, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Environmental services | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Environmental services | Permit status: Approved | Completion date: March 8, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Transportation | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Transportation | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 2, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 1, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Parks bureau | Permit status: Approved | Completion date: April 1, 2016 | Permit id: 2016-126559-000 | |||||
Revision on structural plans to move interior column along grid e approximately 8- feet north from original position. Date: November 6, 2015Permit type: Application | Permit status: Approved | Completion date: March 2, 2015 | Permit id: 2014-176360-Rev | |||||
Revision to update sheet at11 added 2x4 compression post notesrevision to dfs o1 Date: November 6, 2015Permit type: Application | Permit status: Approved | Completion date: March 31, 2015 | Permit id: 2014-176360-Rev | |||||
Pbot pw permit Date: August 4, 2015Permit type: Intake pw | Permit status: Assigned | Completion date: October 23, 2014 | Permit id: 2014-216595-000 | |||||
Temp power polefaxed Date: November 11, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 13, 2014 | Permit id: 2014-236513-000 | |||||
Sprinkler - fire sprinkler system for new building Date: July 7, 2015Permit type: Intake | Permit status: Approved | Completion date: January 8, 2015 | Permit id: 2015-102114-000 | |||||
Underground inspection Date: January 26, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 21, 2015 | Permit id: 2015-110697-000 | |||||
Eight 5-ton gas packs, garage exhaust, gas piping, misc exhausts, structural details attached Date: August 18, 2015Permit type: Intake | Permit status: Approved | Completion date: August 18, 2015 | Permit id: 2015-139116-000 | |||||
Approval of conditional use review to have more than one retail sales and service and office uses within the new building and up to 5,0 square feet of retail sales and service and office uses. Approval of conditional use review to have approximately 18,5 square feet of industrial office space. Approval of adjustment review to allow onsite loading space that meets the size requirement of standard b (18 feet long, 9 feet wide and with a clearance of feet). The proposal is subject to the following condition of approval:1. A transportation demand management plan must be submitted with the permit application and directed to pbot staff. The transportation demand management plan should address the following measures. The site plan should reflect required measures accordingly:a. Shower/locker facilities on site;b. Improved bicycle access including secure bicycle parking, runnels, bike parking signage;c. On-site transportation information board/kiosk offering of maps and commute information locat Date: November 10, 2015Permit type: Land use review | Permit status: Completed | Completion date: July 13, 2015 | Permit id: 2015-198463-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Application | Permit status: Approved | Completion date: February 25, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Issuance/intake | Permit status: Intake | Completion date: February 25, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: March 1, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: April 11, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: March 31, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Planning and zoning | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Site development | Permit status: Not reqd | Completion date: March 1, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Life safety | Permit status: Approved | Completion date: April 18, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Structural | Permit status: Not reqd | Completion date: March 3, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Fire bureau | Permit status: Approved | Completion date: April 18, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Environmental services | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Environmental services | Permit status: Approved | Completion date: March 8, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Transportation | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Transportation | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 2, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 1, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Parks bureau | Permit status: Approved | Completion date: April 1, 2016 | Permit id: 2016-126553-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Application | Permit status: Approved | Completion date: February 25, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Issuance/intake | Permit status: Intake | Completion date: February 25, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: March 1, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Process management | Permit status: Closed | Completion date: March 31, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Planning and zoning | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Site development | Permit status: Not reqd | Completion date: March 1, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Life safety | Permit status: Approved | Completion date: April 18, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Structural | Permit status: Not reqd | Completion date: March 3, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Fire bureau | Permit status: Approved | Completion date: April 18, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Environmental services | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Environmental services | Permit status: Approved | Completion date: March 8, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Transportation | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Transportation | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 2, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 1, 2016 | Permit id: 2016-126559-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Permit type: Parks bureau | Permit status: Approved | Completion date: April 1, 2016 | Permit id: 2016-126559-000 | |||||
Approval of conditional use review to have more than one retail sales and service and office uses within the new building and up to 5,0 square feet of retail sales and service and office uses. Approval of conditional use review to have approximately 18,5 square feet of industrial office space. Approval of adjustment review to allow onsite loading space that meets the size requirement of standard b (18 feet long, 9 feet wide and with a clearance of feet). The proposal is subject to the following condition of approval:1. A transportation demand management plan must be submitted with the permit application and directed to pbot staff. The transportation demand management plan should address the following measures. The site plan should reflect required measures accordingly:a. Shower locker facilities on site;b. Improved bicycle access including secure bicycle parking, runnels, bike parking signage;c. On-site transportation information board kiosk offering of maps and commute information locat Date: November 10, 2015Permit type: Land use review | Permit status: Completed | Completion date: July 13, 2015 | Permit id: 2015-198463-000 | |||||
Tenant improvement for first time office tenant on 4th floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Date: May 4, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: July 14, 2016 | Current use: Business | Permit id: 2016-126553-000 | |||||
Ti for first time tenant on 2nd floor; add new interior partition walls to create new offices, meeting rooms, and break room Date: August 16, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: October 27, 2016 | Current use: Business | Permit id: 2016-196831-000 | |||||
Tenant improvement for first time office tenant on 3rd floor, new partition walls to create work stations, break area, kitchenette, and offices. No exterior work. Date: May 4, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: July 14, 2016 | Current use: Business | Permit id: 2016-126559-000 |