ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: September 24, 2003Permit status: Finaled | Current use: Single family dwelling | Permit id: 319365 | |||||
Service replacement... 4x5 rdwy cut over main ,install gas service in accordance with washington gas plan no. 668730. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: September 2, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354183 |