14- x tents . 3- x tents . 2-stages Date: May 14, 2012Client: City Of Dc Katheen Kruzclark | Applicant: Kat Kruzclark | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1200111 | |||||
10pm-6am march 3- march 7 Date: February 26, 2014Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400286 | |||||
After hours work at dc waters clean rivers project. Div h, m street shaft site. Site is located at southeast corner of m and water street se. Second shift work necessary to meet the contractual milestones set forth in epa consent decree. All work will be conducted within existing lod shown on dcra-approved permit drawings and inside ddot-approved mot measures. Associated with permit bciv1400025 Date: October 15, 2014Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1500028 | |||||
After hours work at dc waters clean rivers project-div h, m street drop shaft site. Site is located at southeast corner of m and water st se. Second shift work necessary to meet the contractual milestones set forth in epa consent decree. All work will be conducted within existing lod shown on dcra-approved permit drawings and inside ddot approved mot measures. Associated with permit bciv1400025 Date: September 11, 2014Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400662 | |||||
After hours work at dc waters clean river project. Div h, m street shaft site. Site is located at southeast corner of m and water street se. Second shift work necessary to meet the contractual milestone set forth in epa consent decree. All work will be conducted within existing lod shown on dcra approved permit drawings and inside ddot approved mot measures. Associated with permit bciv1400025 7pm to 7am 7/30-8/30/14 Date: August 13, 2014Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400621 | |||||
Soil boring for temporary dewatering operations for dc waters anacostia river tunnel - m street shaft eleven boring: nine pumping wells of 195 feet below grade, 16" in diameter; and two monitoring wells 1 feet deep, 8" diam. Mud rotary drilling method with surface casing. Date: July 28, 2014Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400327 | |||||
Soil boring for ground monitoring instrumentation for dc waters anacostia river tunnel. M street shaft vicinity. Thirty-three borings of 8 to 149 feet below grade, 3. 25 to 6025 in diameter. Hollow stem auger and mud rotary drilling method with surface casing. Date: June 18, 2014Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400310 | |||||
Soil boring for ground monitoring instrumentation for dc waters anacostia river tunnel- m street shaft vicinity. Five deep borings of 132 to 149 feet below grade 3. 25 to 6. 25 in diameter. Hollow stem auger and mud rotary drilling method for surface casing. Date: July 28, 2014Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400311 | |||||
Construction of temporary retaining wall to support site grading for dc waters street shaft site at the corner o m and water streets , se. Retaining wall made of 2x2x6 concret eco block on crushed stone base over compacted earth . Walll dimension 2feet thick . 108 long x4 feet high . Cut /fill, ersion control alredy approved ddoe under permit bciv1400025 Date: April 30, 2014Client: Government Of The District Of Columbia | Permit type: Retaining wall | Permit status: Permit issued | Permit id: Rw1400092 | |||||
Install 2 waterfront site id sign (the wharf) close to 6 water st sw Date: March 11, 2014Client: District Of Columbia | Applicant: ; None | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1400161 | |||||
Temporary sheeting and shoring to support excavation for removal of existing subgrade helical anchors that interfere with construction of dc water m street drop shaft. Soldier pile and lagging, approx. 44 by 36 wide and 23 long. Site work approved by ddoe under permit bciv1400025. Date: June 10, 2014Client: District Of Columbia | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1400064 |