ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Sidewalk deposit required during the installation of a driveway and closure of a 19 existing opening / driveway deposit was put up by the keash co. And will be returned to them if the new driveway and the driveway closure meets city specs.;/; deposit 4 000. 00 Date: May 15, 2014Permit type: Sidewalk deposit | Permit id: Sdep-363225 | |||||
Sidewalk deposit during construction / this is not a permit to excavate and/or occupy / deposit will be returned if sidewalk restoration meets city specs / deposit return request must be submitted within 6 months of job completion; permit 60. 00; inspection; 100. 00; deposit; 3 407. 46 Date: September 10, 2013Permit type: Sidewalk deposit | Permit id: Sdep-284495 | |||||
Sidewalk deposit required during the installation of a driveway and closure of a 19 existing opening ; driveway deposit was put up by the keash co. And will be returned to them if the new driveway and the driveway closure meets city specs.; ; deposit 4 000. 00 Date: May 15, 2014Permit type: Sidewalk deposit | Permit id: Sdep-363225 | |||||
Sidewalk deposit during construction ; this is not a permit to excavate and or occupy ; deposit will be returned if sidewalk restoration meets city specs ; deposit return request must be submitted within 6 months of job completion; permit 60. 00; inspection; 100. 00; deposit; 3 407. 46 Date: September 10, 2013Permit type: Sidewalk deposit | Permit id: Sdep-284495 |