Building Permits at 0 Anacostia Dr Se


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 0 Anacostia Dr Se over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Near surface structures for dc water clean rivers div h - cso 005 shaft site. Construction of diversion chamber and odor control facility to services shaft. All construction is below-grade sewerage. Includes sheeting & shoring for support of excavation. Erosion control & stormwater management permitted under b1402921.
Date:  August 13, 2015

Client: Dc Water Carlton Ray | Permit type: New building | Permit status: Permit issued | Permit id: B1511108
2015/08/130950 Anacostia Dr Se
Soil boring for compensation grouting at three sites along alignment of dc waters clean rivers div h- anacostia river tunnel. 14 borings to max depth of bgs, 2 diameter grout tubes inside 5. 5 dia casings. Duplex rotary drilling method. Ref. Permit sb1400400.
Date:  August 21, 2015

Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500415
2015/08/210950 Anacostia Dr Se
Soil boring for shallow dewatering at dc waters clean rivers project div h - cso 005 site. Eight shallow wells to 25 bgs, 8" diameter max. Mud rotary drilling method.
Date:  March 22, 2016

Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500384
2016/03/220950 Anacostia Dr Se
Dc clean rivers (dccr) proposes to drill up to two (2) geotechnical borings (art,art-2) located alondg anacostia drive immediatyely northeast of the 11th street bridge overpass. The borings. Will be 6 inches in diameter and approximately 75 feet in depth,drilled by hollow-stem auger and mud rotary methods. Temporary surface casing will be set before proceeding with drilling. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. If the borehole is not completed in one day ,sandbags and plastic sheetings will be used to protect and coveer the borehole from surface water drainage and the vertical migration of contaminants and other materials through the borehole. Down hole drilling equipment will be decontaminted prior to drilling,between boreholes and anytime equipment is taken off site.
Date:  May 20, 2016

Client: Chris Gerber | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600237
2016/05/200950 Anacostia Dr Se
Soil boring for shallow dewatering at dc waters clean rivers project div h - cso 005 site. Eight shallow wells to 25 bgs, 8" diameter max. Mud rotary drilling method.
Date:  March 22, 2016

Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500384
2016/03/220950 Anacostia Dr Se
Dc clean rivers (dccr) proposes to drill up to two (2) geotechnical borings (art,art-2) located alondg anacostia drive immediatyely northeast of the 11th street bridge overpass. The borings. Will be 6 inches in diameter and approximately 75 feet in depth,drilled by hollow-stem auger and mud rotary methods. Temporary surface casing will be set before proceeding with drilling. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. If the borehole is not completed in one day ,sandbags and plastic sheetings will be used to protect and coveer the borehole from surface water drainage and the vertical migration of contaminants and other materials through the borehole. Down hole drilling equipment will be decontaminted prior to drilling,between boreholes and anytime equipment is taken off site.
Date:  May 20, 2016

Client: Chris Gerber | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600237
2016/05/200950 Anacostia Dr Se
Work at dcw clean rivers project div. H, cso 005 shaft site located at 824 howard road ,se near surface structure site construction of diversion chamber and odor control facility to services shaft.
Date:  November 29, 2016

Client: Dc Water Carton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700212
2016/11/290950 Anacostia Dr Se
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.