ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Near surface structures for dc water clean rivers div h - cso 005 shaft site. Construction of diversion chamber and odor control facility to services shaft. All construction is below-grade sewerage. Includes sheeting & shoring for support of excavation. Erosion control & stormwater management permitted under b1402921. Date: August 13, 2015Client: Dc Water Carlton Ray | Permit type: New building | Permit status: Permit issued | Permit id: B1511108 | |||||
Soil boring for compensation grouting at three sites along alignment of dc waters clean rivers div h- anacostia river tunnel. 14 borings to max depth of bgs, 2 diameter grout tubes inside 5. 5 dia casings. Duplex rotary drilling method. Ref. Permit sb1400400. Date: August 21, 2015Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500415 | |||||
Soil boring for shallow dewatering at dc waters clean rivers project div h - cso 005 site. Eight shallow wells to 25 bgs, 8" diameter max. Mud rotary drilling method. Date: March 22, 2016Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500384 | |||||
Dc clean rivers (dccr) proposes to drill up to two (2) geotechnical borings (art,art-2) located alondg anacostia drive immediatyely northeast of the 11th street bridge overpass. The borings. Will be 6 inches in diameter and approximately 75 feet in depth,drilled by hollow-stem auger and mud rotary methods. Temporary surface casing will be set before proceeding with drilling. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. If the borehole is not completed in one day ,sandbags and plastic sheetings will be used to protect and coveer the borehole from surface water drainage and the vertical migration of contaminants and other materials through the borehole. Down hole drilling equipment will be decontaminted prior to drilling,between boreholes and anytime equipment is taken off site. Date: May 20, 2016Client: Chris Gerber | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600237 | |||||
Soil boring for shallow dewatering at dc waters clean rivers project div h - cso 005 site. Eight shallow wells to 25 bgs, 8" diameter max. Mud rotary drilling method. Date: March 22, 2016Client: Dc Water Carlton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500384 | |||||
Dc clean rivers (dccr) proposes to drill up to two (2) geotechnical borings (art,art-2) located alondg anacostia drive immediatyely northeast of the 11th street bridge overpass. The borings. Will be 6 inches in diameter and approximately 75 feet in depth,drilled by hollow-stem auger and mud rotary methods. Temporary surface casing will be set before proceeding with drilling. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. If the borehole is not completed in one day ,sandbags and plastic sheetings will be used to protect and coveer the borehole from surface water drainage and the vertical migration of contaminants and other materials through the borehole. Down hole drilling equipment will be decontaminted prior to drilling,between boreholes and anytime equipment is taken off site. Date: May 20, 2016Client: Chris Gerber | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600237 | |||||
Work at dcw clean rivers project div. H, cso 005 shaft site located at 824 howard road ,se near surface structure site construction of diversion chamber and odor control facility to services shaft. Date: November 29, 2016Client: Dc Water Carton Ray | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700212 |