| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 1 Irving Street Nw Washington Dc Proposed route begins on the ne side of the exit ramp of north capitol street nw at an existing 4x7 fiberlight handhole. Install splice case and begin buried to place 305 of (2) 2" hdpe equipped with (1) 144 fiber westerly crossing entrance ramps and trench to place 12 westerly along irving street to the intersection of irving and 1st street nw. On the north side of the intersection go buried to place 979 of (2) 2" hdpe equipped with (1) 144 fiber southerly along the w side of first street nw and nw on hospital center drive. Zayo proposes to tie into vzn manhole and pull 4 of (1) 1. 25" innerduct equipped with (1) 144 fiber thru existing building conduit at 1 irving street nw. Zayo proposes to install (3) 3x5x3 handholes. Date: August 19, 2017 Contractor: Zayo Group Holdings Inc Zayo Group IncClient: Zayo Group Holdings, Inc Zayo Group Holdings, Inc | Permit type: Excavation; telecom connection (trench), excavation; manhole installation | Permit status: Issued | Expiration date: December 14, 2017 | Permit id: Pa220698 |