QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 65 Date: March 30, 2004 Contractor: Verizon Structured CablingClient: C F Tigard Elementary | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2004-00086 | |||||
SCORE 65 Date: July 28, 2006 Contractor: Verizon Structured CablingClient: Safeco | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2006-00179 | |||||
SCORE 65 Date: March 30, 2004 Contractor: Verizon Structured CablingClient: Metzger Elementary | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2004-00085 | |||||
SCORE 65 Date: March 8, 2004 Contractor: Verizon Structured CablingClient: Tigard High School | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2004-00059 |