SCORE 100 7125 Fauntleroy Way Sw Seattle Wa Relocation of (2) smoke detectors, addition of (2) smoke detectors and relocating (2) horn strobes Date: September 28, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 28, 2017 | Current use: Commercial | Permit id: 6559193 | |||||
SCORE 100 Date: September 21, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 23, 2016 | Expiration date: September 21, 2017 | Current use: Multifamily | Permit id: 6557731 | |||||
SCORE 100 12 Republican St Seattle Wa Installation of (1) security camera at makers lab and (1) security camera at cooking lab Date: September 21, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 21, 2017 | Current use: Commercial | Permit id: 6557697 | |||||
SCORE 100 Date: September 16, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 16, 2017 | Current use: Commercial | Permit id: 6556947 | |||||
SCORE 100 Date: September 15, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 23, 2016 | Expiration date: September 15, 2017 | Current use: Multifamily | Permit id: 6556641 | |||||
SCORE 100 1408 E Union St Seattle Wa Installing 3 new pendant lights in the leasing office fed from the existing circuit Date: September 12, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 15, 2016 | Expiration date: September 12, 2017 | Current use: Commercial | Permit id: 6555958 | |||||
SCORE 100 Date: September 7, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2016 | Expiration date: September 7, 2017 | Current use: Institutional | Permit id: 6555105 | |||||
SCORE 100 1255 Harrison St Seattle Wa [temporary power. ] hook a 25kva generator to a temporary jobsite office trailer. Date: September 6, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 9, 2016 | Expiration date: September 6, 2017 | Current use: Multifamily | Permit id: 6554983 | |||||
SCORE 100 7125 Fauntleroy Way Sw Seattle Wa Installation of (1) smoke detector and relocation of (1) detector in unit #575 Date: August 30, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2016 | Expiration date: August 30, 2017 | Current use: Commercial | Permit id: 6554107 | |||||
SCORE 100 Date: August 25, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 26, 2016 | Expiration date: August 25, 2017 | Current use: Commercial | Permit id: 6553409 | |||||
SCORE 100 Date: August 22, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 15, 2016 | Expiration date: August 22, 2017 | Current use: Commercial | Permit id: 6552666 | |||||
SCORE 100 Date: August 12, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2016 | Expiration date: August 12, 2017 | Current use: Commercial | Permit id: 6551246 | |||||
SCORE 100 115 Warren Ave N Seattle Wa Camera additions: 1) at the office back door, (1) at the office front door and (1) at the new tv. Camera replacements: (2) cameras in the lobby, (1) in the office and (1) in the garage. Date: August 8, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: August 8, 2017 | Current use: Commercial | Permit id: 6550324 | |||||
SCORE 100 1255 Harrison St Seattle Wa Temporary power for large mixed use project. [related project number: 6450010- not yet issued]. Permit type: Electrical | Permit status: Permit issued | Expiration date: September 28, 2017 | Current use: Multifamily | Permit id: 6542868 | |||||
SCORE 100 Date: July 26, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 10, 2016 | Expiration date: July 26, 2017 | Current use: Commercial | Permit id: 6548049 | |||||
SCORE 100 Date: July 25, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2016 | Expiration date: July 25, 2017 | Current use: Commercial | Permit id: 6547991 | |||||
SCORE 100 515 Harvard Ave E Seattle Wa Installation of (1) relay for elevator controls. Installation of (1) 3 degree camera at parking garage gate. Installation of (1) amp circuit for how water in trash room. Installation of network cabling to the nvr. Date: July 12, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: July 12, 2017 | Current use: Commercial | Permit id: 6545626 | |||||
SCORE 100 2105 5th Ave Seattle Wa Installation of (8) can light fixtures in gym area, fed from existing circuitry. Date: June 27, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: June 27, 2017 | Current use: Commercial | Permit id: 6542935 | |||||
SCORE 100 5 Broadway Seattle Wa Complete fire instillation, including all low voltage work for a 6 story, 167 unit residential bldg. Over 3 stories of below grade parking 8-25-16 dwr corrected description to fire permit. Date: September 6, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 6, 2017 | Current use: Multifamily | Permit id: 6542562 | |||||
SCORE 100 805 4th Ave N Seattle Wa Installation of (1) dedicated circuit for fire alarm system, (27) indoor receptacles for new nurse call system and (1) outdoor receptacle for nurse call system Date: June 22, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2016 | Expiration date: June 22, 2017 | Current use: Multifamily | Permit id: 6542015 | |||||
SCORE 100 Date: June 15, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: June 15, 2017 | Current use: Commercial | Permit id: 6540769 | |||||
SCORE 100 Date: June 2, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 13, 2016 | Expiration date: June 2, 2017 | Current use: Multifamily | Permit id: 6538197 | |||||
SCORE 100 1 Taylor Ave N Seattle Wa Replace (8) existing cameras & (1) dvr with (8) new cameras & (1) nvr. Technician to show locations. Date: May 24, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: May 24, 2017 | Current use: Commercial | Permit id: 6536685 | |||||
SCORE 100 Date: May 23, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 24, 2016 | Expiration date: May 23, 2017 | Current use: Commercial | Permit id: 6536362 | |||||
SCORE 100 Date: May 12, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2016 | Expiration date: May 12, 2017 | Current use: Commercial | Permit id: 6534488 | |||||
SCORE 100 Date: May 12, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 31, 2016 | Expiration date: May 12, 2017 | Current use: Single family / duplex | Permit id: 6534476 | |||||
SCORE 100 Date: May 10, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 11, 2016 | Expiration date: May 10, 2017 | Current use: Commercial | Permit id: 6533963 | |||||
SCORE 100 1408 E Union St Seattle Wa Extension of (1) circuit for tv. Extension of (1) circuit for light fixture. Relocation of (5) in wall light fixtures. Installation of (1) chandelier Date: May 9, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 11, 2016 | Expiration date: May 9, 2017 | Current use: Commercial | Permit id: 6533738 | |||||
SCORE 100 4751 12th Ave Ne Seattle Wa Installation of (1) new 120v circuit and (7) total fixtures. (6) fixtures to be located on new circuit, (1) fixture is a replacement were wiring will be altered. Date: April 26, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 20, 2016 | Expiration date: April 26, 2017 | Current use: Commercial | Permit id: 6531514 | |||||
SCORE 100 5 Broadway Seattle Wa Day get started to witness conduit and for branch circuits only; plan review under 6530114. 6-22-16 dwr extended get started till 7-29-16. 6-14-16 dwr extended get started till 8-29-16. 8-23-16 dwr extended again till 9-13-16. Date: April 19, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 26, 2016 | Expiration date: September 13, 2016 | Current use: Multifamily | Permit id: 6530116 | |||||
SCORE 100 5 Broadway Seattle Wa Complete electrical installation; including all low voltage work for a 6-story, 167-unit residential building over 3 stories of below grade parking. Permit type: Electrical | Permit status: Permit issued | Expiration date: August 26, 2017 | Current use: Multifamily | Permit id: 6530114 | |||||
SCORE 100 Date: April 19, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 20, 2016 | Expiration date: April 19, 2017 | Current use: Commercial | Permit id: 6529986 | |||||
SCORE 100 Date: April 19, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2016 | Expiration date: April 19, 2017 | Current use: Commercial | Permit id: 6529984 | |||||
SCORE 100 Date: April 13, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 12, 2016 | Expiration date: May 13, 2016 | Current use: Multifamily | Permit id: 6529073 | |||||
SCORE 100 Date: April 4, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 5, 2016 | Expiration date: April 4, 2017 | Current use: Commercial | Permit id: 6527394 | |||||
SCORE 100 2821 S Walden St Seattle Wa Installation of (1) relay for fire alarm system in conjunction with door access proposal. Date: March 30, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2016 | Expiration date: March 30, 2017 | Current use: Commercial | Permit id: 6526816 | |||||
SCORE 100 5601 24th Ave Nw Seattle Wa Turning a one bedroom and a studio unit into one two bedroom unit and deleting a kitchen. Date: March 24, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2016 | Expiration date: March 24, 2017 | Current use: Multifamily | Permit id: 6525719 | |||||
SCORE 100 Date: March 22, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: March 22, 2017 | Current use: Commercial | Permit id: 6525298 | |||||
SCORE 100 Date: March 9, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 11, 2016 | Expiration date: March 9, 2017 | Current use: Multifamily | Permit id: 6523135 | |||||
SCORE 100 11 N 115th St Seattle Wa Install (5) telephone entry displays at building a,b,c,d and the clubhouse. Install (14) total card readers. (2) card readers per residential building-(1) at front and (1) at back. (6) throughout clubhouse. (1) at the front door. (1) at each of two pool gates and (3) at the doors to the pool area. Date: March 8, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2016 | Expiration date: March 8, 2017 | Current use: Multifamily | Permit id: 6522928 | |||||
SCORE 100 Date: March 2, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: March 2, 2017 | Current use: Multifamily | Permit id: 6521822 | |||||
SCORE 100 Date: February 29, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 1, 2016 | Expiration date: February 28, 2017 | Current use: Single family / duplex | Permit id: 6521256 | |||||
SCORE 100 Date: February 19, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: February 18, 2017 | Current use: Commercial | Permit id: 6519939 | |||||
SCORE 100 16 E John St Seattle Wa Install (1) receptacle for aes radio for fire alarm system in electrical room Date: February 19, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: February 24, 2016 | Expiration date: February 18, 2017 | Current use: Commercial | Permit id: 6519865 | |||||
SCORE 100 Date: February 18, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: February 19, 2016 | Expiration date: February 17, 2017 | Current use: Institutional | Permit id: 6519519 | |||||
SCORE 100 Date: February 3, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: February 2, 2017 | Current use: Multifamily | Permit id: 6517349 | |||||
SCORE 100 616a N 45th St Seattle Wa Relocate vanity light, add two lights in ceiling, add one receptacle and add power for floor heater Date: January 11, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: January 10, 2017 | Current use: Multifamily | Permit id: 6513161 | |||||
SCORE 100 1319 Dexter Ave N Seattle Wa Temporary construction power for site. Includes man lift, placing booms, and power for sump pumps. [related project number: 6436709 - not yet issued, demo permit 6473380] Permit type: Electrical | Permit status: Permit issued | Expiration date: January 20, 2017 | Current use: Multifamily | Permit id: 6512561 | |||||
SCORE 100 2821 S Walden St Seattle Wa Door magnet, aiphone and camera installation [various - throughout facility] Permit type: Electrical | Permit status: Permit closed | Completion date: April 19, 2016 | Expiration date: February 18, 2017 | Current use: Multifamily | Permit id: 6512884 | |||||
SCORE 100 53 24th Ave Ne Seattle Wa Installation of door king 1838 and (2) rf units for general entry and corydon entry garage roll up doors. Date: December 28, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 27, 2016 | Current use: Commercial | Permit id: 6511248 | |||||
SCORE 100 53 24th Ave Ne Seattle Wa Installation of power for (2) new ac units-located on roof. Wiring ran from outdoor units, down to indoor units within the corridors of second and third floors. Date: December 15, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: February 23, 2016 | Expiration date: December 14, 2016 | Current use: Multifamily | Permit id: 6509646 | |||||
SCORE 100 Date: December 15, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2016 | Expiration date: December 14, 2016 | Current use: Institutional | Permit id: 6509612 | |||||
SCORE 100 Date: October 27, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 28, 2015 | Expiration date: October 26, 2016 | Current use: Single family / duplex | Permit id: 6501909 | |||||
SCORE 100 1414 Dexter Ave N Seattle Wa Days get started for branch circuits only. Plan review done under permit #6501459 Date: October 23, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 19, 2016 | Expiration date: November 23, 2015 | Current use: Multifamily | Permit id: 6501460 | |||||
SCORE 100 Date: September 29, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 28, 2016 | Current use: Commercial | Permit id: 6497375 | |||||
SCORE 100 Date: September 28, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 2, 2015 | Expiration date: September 27, 2016 | Current use: Institutional | Permit id: 6496969 | |||||
SCORE 100 3601 Greenwood Ave N Seattle Wa Install (2) 225a feeders and (4) ded ckts 15-25a [level 1, south side retail] Date: September 16, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 17, 2015 | Expiration date: September 16, 2016 | Current use: Commercial | Permit id: 6495077 | |||||
SCORE 100 Date: September 18, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2015 | Expiration date: September 18, 2016 | Current use: Commercial | Permit id: 6489521 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Low voltage wiring and boxes for build out of fire alarm system. Fire alarm permit in for plan review. Date: August 7, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2015 | Expiration date: August 6, 2016 | Current use: Commercial | Permit id: 6488673 | |||||
SCORE 100 12 Republican St Seattle Wa Add (1) camera and (1) receptacle at move in room. Add (1) camera and (1) led wall pack at bike storage Date: July 28, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 21, 2015 | Expiration date: July 27, 2016 | Current use: Commercial | Permit id: 6486657 | |||||
SCORE 100 Date: July 10, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: July 9, 2016 | Current use: Commercial | Permit id: 6483769 | |||||
SCORE 100 Date: August 4, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: August 4, 2016 | Current use: Multifamily | Permit id: 6480714 | |||||
SCORE 100 1 Harvard Ave E Seattle Wa Closed without final inspection, no known life safety issues add (1) relay with timer for card reader at elevator Date: June 19, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: June 18, 2016 | Current use: Commercial | Permit id: 6480316 | |||||
SCORE 100 5601 24th Ave Nw Seattle Wa Installation of a complete fire alarm system for a new mixed use residential building [entire building] Date: July 17, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 25, 2016 | Expiration date: July 17, 2016 | Current use: Multifamily | Permit id: 6477112 | |||||
SCORE 100 13023 Greenwood Ave N Seattle Wa Extend existing 1 v outlet to install new door opener and relocate emergency stop switch for generator Date: May 27, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 20, 2015 | Expiration date: May 26, 2016 | Current use: Institutional | Permit id: 6475942 | |||||
SCORE 100 427 Ne 72nd St Seattle Wa Install fully functional code-compliant fire alarm system with up to (3) new devices and relocation of (1) device. Date: May 13, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2015 | Expiration date: May 12, 2016 | Current use: Commercial | Permit id: 6473897 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: August 12, 2016 | Expiration date: July 23, 2016 | Current use: Multifamily | Permit id: 6471167 | |||||
SCORE 100 305 Harrison St Seattle Wa Install (4) 20amp 120v circuits from the kitchen panel to the glass house and divide existing receptacle circuitry with new circuitry. Date: April 14, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 20, 2015 | Expiration date: April 13, 2016 | Current use: Commercial | Permit id: 6468911 | |||||
SCORE 100 53 24th Ave Ne Seattle Wa Install (2) electric strikes at the north and south end of the parking garage. Date: April 7, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 19, 2015 | Expiration date: April 6, 2016 | Current use: Commercial | Permit id: 6467844 | |||||
SCORE 100 Date: April 2, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 9, 2015 | Expiration date: April 1, 2016 | Current use: Commercial | Permit id: 6467011 | |||||
SCORE 100 Date: March 27, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 30, 2016 | Expiration date: March 26, 2016 | Current use: Commercial | Permit id: 6466174 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: July 26, 2016 | Expiration date: April 9, 2016 | Current use: Multifamily | Permit id: 6465772 | |||||
SCORE 100 427 Ne 72nd St Seattle Wa Install fully functional code compliant fire alarm system with up to (4) new devices. Date: March 24, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 11, 2015 | Expiration date: March 23, 2016 | Current use: Commercial | Permit id: 6465570 | |||||
SCORE 100 53 24th Ave Ne Seattle Wa Extend (1) circuit approximately (30) feet and install (2) duplex-receptacles Date: March 18, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 23, 2015 | Expiration date: March 17, 2016 | Current use: Commercial | Permit id: 6464711 | |||||
SCORE 100 71 Woodlawn Ave Ne Seattle Wa Install fully functional code compliant fire alarm system with up to (5) devices Date: March 13, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 8, 2015 | Expiration date: March 12, 2016 | Current use: Commercial | Permit id: 6463923 | |||||
SCORE 100 Date: March 13, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 1, 2015 | Expiration date: March 12, 2016 | Current use: Multifamily | Permit id: 6463827 | |||||
SCORE 100 11501 15th Ave Ne Seattle Wa Install (2) amp 1 volt receptacles in kitchen for microwave oven and sandwich cooler Date: February 18, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: February 19, 2015 | Expiration date: February 18, 2016 | Current use: Commercial | Permit id: 6460053 | |||||
SCORE 100 Date: February 16, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: February 16, 2016 | Current use: Multifamily | Permit id: 6459617 | |||||
SCORE 100 Date: February 5, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2015 | Expiration date: February 5, 2016 | Current use: Multifamily | Permit id: 6458165 | |||||
SCORE 100 4831 35th Ave Sw Seattle Wa Removing old inefficient heat pump system and replacing with two smaller systems. Date: January 23, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 27, 2016 | Expiration date: January 23, 2016 | Current use: Commercial | Permit id: 6456021 | |||||
SCORE 100 Date: January 14, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 26, 2015 | Expiration date: January 14, 2016 | Current use: Commercial | Permit id: 6454729 | |||||
SCORE 100 11501 15th Ave Ne Seattle Wa Removing (2) baseboard heaters to allow for remodel of units. Install (2) new wall heaters in lieu of baseboards using existing circuitry. Date: January 13, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 16, 2015 | Expiration date: January 13, 2016 | Current use: Commercial | Permit id: 6454539 | |||||
SCORE 100 Date: January 7, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 12, 2016 | Expiration date: January 7, 2016 | Current use: Multifamily | Permit id: 6453503 | |||||
SCORE 100 Date: December 30, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 19, 2015 | Expiration date: December 30, 2015 | Current use: Commercial | Permit id: 6452662 | |||||
SCORE 100 305 Harrison St Seattle Wa Closed - parent permit issued day get started for branch circuts only plan review permit under #6452535 Date: December 29, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: January 29, 2015 | Current use: Multifamily | Permit id: 6452536 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: January 22, 2016 | Expiration date: January 15, 2016 | Current use: Commercial | Permit id: 6452535 | |||||
SCORE 100 Date: December 18, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 10, 2015 | Expiration date: December 18, 2015 | Current use: Commercial | Permit id: 6451598 | |||||
SCORE 100 4 8th Ave N Seattle Wa Closed - parent permit issued day get started to be on site only for fire alarm; plan review under 6448907. Date: December 11, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: January 11, 2015 | Current use: Multifamily | Permit id: 6450397 | |||||
SCORE 100 2 2nd Ave S Seattle Wa Install code compliant fully functional fire alarm system with up to (4) devices Date: December 5, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 8, 2014 | Expiration date: December 5, 2015 | Current use: Commercial | Permit id: 6449372 | |||||
SCORE 100 Date: December 4, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 5, 2014 | Expiration date: December 4, 2015 | Current use: Commercial | Permit id: 6449262 | |||||
SCORE 100 Date: January 9, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 17, 2016 | Expiration date: June 9, 2016 | Current use: Multifamily | Permit id: 6448907 | |||||
SCORE 100 Date: November 17, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2014 | Expiration date: November 17, 2015 | Current use: Commercial | Permit id: 6446500 | |||||
SCORE 100 Date: November 10, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2014 | Expiration date: November 10, 2015 | Current use: Multifamily | Permit id: 6445452 | |||||
SCORE 100 3601 Greenwood Ave N Seattle Wa Complete fire alarm installation for new 64 unit mixed use apartment building. Date: December 3, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2015 | Expiration date: December 3, 2015 | Current use: Multifamily | Permit id: 6444863 | |||||
SCORE 100 Date: October 30, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 19, 2014 | Expiration date: October 30, 2015 | Current use: Commercial | Permit id: 6443886 | |||||
SCORE 100 Date: October 24, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 31, 2014 | Expiration date: October 24, 2015 | Current use: Commercial | Permit id: 6442957 | |||||
SCORE 100 3601 Greenwood Ave N Seattle Wa Complete electrical installation including low voltage for new 64-unit mixed use apartment building. Permit type: Electrical | Permit status: Permit issued | Expiration date: December 4, 2015 | Current use: Multifamily | Permit id: 6442583 | |||||
SCORE 100 Date: December 9, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 1, 2016 | Expiration date: June 30, 2016 | Current use: Multifamily | Permit id: 6442416 | |||||
SCORE 100 Date: October 17, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 19, 2014 | Expiration date: October 17, 2015 | Current use: Commercial | Permit id: 6441899 | |||||
SCORE 100 777 Thomas St Seattle Wa Day get started to branch circuits only; plan review under 6434665 11-12-14 dwr extended get started for more days Date: October 14, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 26, 2014 | Expiration date: December 14, 2014 | Current use: Multifamily | Permit id: 6441306 | |||||
SCORE 100 Date: October 2, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 3, 2014 | Expiration date: October 2, 2015 | Current use: Commercial | Permit id: 6439534 | |||||
SCORE 100 Date: October 2, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 29, 2014 | Expiration date: October 2, 2015 | Current use: Commercial | Permit id: 6439490 | |||||
SCORE 100 Date: September 30, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 10, 2014 | Expiration date: September 30, 2015 | Current use: Commercial | Permit id: 6438968 | |||||
SCORE 100 2 2nd Ave S Seattle Wa Closed without final inspection, no known life safety issues install code compliant fully functional fire alarm system with up to (4) devices Date: September 18, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: September 18, 2015 | Current use: Commercial | Permit id: 6437269 | |||||
SCORE 100 201 S King St Seattle Wa Closed - no known work done under this permit extend data line and extend receptacle for lobby wall mounted tv. Date: September 12, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: September 12, 2015 | Current use: Commercial | Permit id: 6436302 | |||||
SCORE 100 3801 Stone Way N Seattle Wa All electrical including all low voltage for a new 278 unit apartment building 3-10-16 brs extended 4 months to allow time to finish project. Permit type: Electrical | Permit status: Permit closed | Completion date: June 24, 2016 | Expiration date: July 4, 2016 | Current use: Commercial | Permit id: 6435989 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: September 23, 2015 | Expiration date: September 18, 2015 | Current use: Multifamily | Permit id: 6434667 | |||||
SCORE 100 Date: September 2, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 8, 2014 | Expiration date: December 2, 2014 | Current use: Multifamily | Permit id: 6434670 | |||||
SCORE 100 Date: August 22, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 15, 2015 | Expiration date: August 22, 2015 | Current use: Commercial | Permit id: 6433166 | |||||
SCORE 100 Date: August 21, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 27, 2014 | Expiration date: August 21, 2015 | Current use: Multifamily | Permit id: 6432954 | |||||
SCORE 100 424 Ne 71st St Seattle Wa Install fully functional code compliant fire alarm system with up to (4) devices. Date: August 14, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 26, 2014 | Expiration date: August 14, 2015 | Current use: Commercial | Permit id: 6431989 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: May 20, 2015 | Expiration date: August 26, 2015 | Current use: Commercial | Permit id: 6431934 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit issued | Expiration date: August 25, 2015 | Current use: Multifamily | Permit id: 6431033 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: August 18, 2015 | Expiration date: August 25, 2015 | Current use: Multifamily | Permit id: 6431030 | |||||
SCORE 100 14 Western Ave Seattle Wa Closed - parent permit issued day get started to be on site for fire alarm only; plan review under 6431034. Date: August 8, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: September 8, 2014 | Current use: Commercial | Permit id: 6431035 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: September 10, 2014 | Expiration date: August 26, 2015 | Current use: Commercial | Permit id: 6431034 | |||||
SCORE 100 Date: August 7, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 13, 2014 | Expiration date: August 7, 2015 | Current use: Multifamily | Permit id: 6430816 | |||||
SCORE 100 Date: August 4, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 6, 2014 | Expiration date: August 4, 2015 | Current use: Commercial | Permit id: 6430308 | |||||
SCORE 100 Date: July 31, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 1, 2014 | Expiration date: July 31, 2015 | Current use: Institutional | Permit id: 6429820 | |||||
SCORE 100 Date: September 3, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 24, 2014 | Expiration date: September 3, 2015 | Current use: Commercial | Permit id: 6427770 | |||||
SCORE 100 Date: June 22, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2014 | Expiration date: June 22, 2015 | Current use: Commercial | Permit id: 6423822 | |||||
SCORE 100 Date: May 30, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 27, 2014 | Expiration date: May 30, 2015 | Current use: Multifamily | Permit id: 6420295 | |||||
SCORE 100 Date: August 7, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 24, 2014 | Expiration date: August 7, 2015 | Current use: Commercial | Permit id: 6418124 | |||||
SCORE 100 Date: May 13, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 11, 2014 | Expiration date: May 13, 2015 | Current use: Commercial | Permit id: 6417535 | |||||
SCORE 100 Date: May 9, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 26, 2014 | Expiration date: May 9, 2015 | Current use: Commercial | Permit id: 6417093 | |||||
SCORE 100 Date: April 24, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 15, 2014 | Expiration date: April 24, 2015 | Current use: Commercial | Permit id: 6414796 | |||||
SCORE 100 525 Ne Northgate Way Seattle Wa Complete electrical installaton for tenant improvement in existing bilding Permit type: Electrical | Permit status: Permit closed | Completion date: September 26, 2014 | Expiration date: May 29, 2015 | Current use: Commercial | Permit id: 6413940 | |||||
SCORE 100 Date: April 16, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2014 | Expiration date: April 16, 2015 | Current use: Commercial | Permit id: 6413514 | |||||
SCORE 100 Date: March 18, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 20, 2014 | Expiration date: March 18, 2015 | Current use: Multifamily | Permit id: 6409009 | |||||
SCORE 100 Date: June 3, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 31, 2014 | Expiration date: June 3, 2015 | Current use: Institutional | Permit id: 6408351 | |||||
SCORE 100 9 Poplar Pl S Seattle Wa Scope of work is to add (2) 24 volt magnetic door locks with (1) request to exit motion sensor at each of the (2) doors along with a push button keypad at the man door next to new office. Date: March 5, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 14, 2014 | Expiration date: March 5, 2015 | Current use: Commercial | Permit id: 6407006 | |||||
SCORE 100 Date: February 11, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: February 26, 2014 | Expiration date: February 11, 2015 | Current use: Commercial | Permit id: 6403833 | |||||
SCORE 100 7104 Woodlawn Ave Ne Seattle Wa Day get started to be on site for fire alarm only; plan review under 6403140. Date: February 6, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 14, 2014 | Expiration date: March 6, 2014 | Current use: Commercial | Permit id: 6403141 | |||||
SCORE 100 Date: March 13, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 14, 2014 | Expiration date: March 13, 2015 | Current use: Commercial | Permit id: 6403140 | |||||
SCORE 100 Date: January 14, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2014 | Expiration date: January 14, 2015 | Current use: Commercial | Permit id: 6399717 | |||||
SCORE 100 Date: January 13, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: February 18, 2014 | Expiration date: January 13, 2015 | Current use: Commercial | Permit id: 6399507 | |||||
SCORE 100 Date: January 8, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 23, 2014 | Expiration date: January 8, 2015 | Current use: Commercial | Permit id: 6399088 | |||||
SCORE 100 Date: January 2, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: January 2, 2015 | Current use: Commercial | Permit id: 6398227 | |||||
SCORE 100 Date: November 18, 2013 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 9, 2014 | Expiration date: December 18, 2013 | Current use: Commercial | Permit id: 6392680 | |||||
SCORE 100 3 3rd Ave W Seattle Wa Complete fire alarm system for tenant improvement (expansion of existing system) Date: January 7, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 9, 2014 | Expiration date: January 7, 2015 | Current use: Commercial | Permit id: 6391903 | |||||
SCORE 100 10 Ne 63rd St Seattle Wa Closed - parent permit issued day get started to be on site only for fire alarm; plan review under 6386730. Date: October 23, 2013 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: November 23, 2013 | Current use: Commercial | Permit id: 6388977 | |||||
SCORE 100 4545 8th Ave Ne Seattle Wa Closed - parent permit issued day get started to be on site only for fire alarm; plan review under 6386733. Date: October 23, 2013 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: November 23, 2013 | Current use: Commercial | Permit id: 6388976 | |||||
SCORE 100 Date: November 7, 2013 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 4, 2014 | Expiration date: November 7, 2014 | Current use: Commercial | Permit id: 6386730 | |||||
SCORE 100 Date: November 7, 2013 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 30, 2014 | Expiration date: November 7, 2014 | Current use: Commercial | Permit id: 6386733 | |||||
SCORE 100 Date: August 24, 2010 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 21, 2010 | Expiration date: August 24, 2011 | Current use: Commercial | Permit id: 6258795 | |||||
SCORE 100 Date: July 1, 2010 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 1, 2011 | Expiration date: July 1, 2011 | Current use: Commercial | Permit id: 6253682 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Install one additional horn strobe and one additional smoke detector. Relocate existing smoke detector and horn strobe. This suite has existing devices that are active and have been tested by fire marshall. Date: May 24, 2010 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2010 | Expiration date: May 24, 2011 | Current use: Commercial | Permit id: 6249763 | |||||
SCORE 100 Date: April 21, 2010 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 20, 2010 | Expiration date: April 21, 2011 | Current use: Commercial | Permit id: 6246632 | |||||
SCORE 100 11501 15th Ave Ne Seattle Wa Install one amp circuit and one amp circuit and relocate existing wiring to accomadate new wall. Date: March 18, 2010 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 16, 2010 | Expiration date: March 18, 2011 | Current use: Multifamily | Permit id: 6243577 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: December 31, 2009 | Expiration date: December 16, 2010 | Current use: Commercial | Permit id: 6233266 | |||||
SCORE 100 Date: October 23, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 9, 2009 | Expiration date: November 23, 2009 | Current use: Commercial | Permit id: 6231068 | |||||
SCORE 100 Date: October 12, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2009 | Expiration date: October 12, 2010 | Current use: Commercial | Permit id: 6228996 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: December 17, 2009 | Expiration date: November 9, 2010 | Current use: Commercial | Permit id: 6228867 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Installing 6 additional fire alarm devices in suite 11, shune restaurant. Date: September 22, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 7, 2009 | Expiration date: September 22, 2010 | Current use: Commercial | Permit id: 6227842 | |||||
SCORE 100 Date: August 19, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 9, 2009 | Expiration date: August 19, 2010 | Current use: Commercial | Permit id: 6224851 | |||||
SCORE 100 Date: July 31, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2009 | Expiration date: July 31, 2010 | Current use: Commercial | Permit id: 6223024 | |||||
SCORE 100 Date: July 8, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 9, 2009 | Expiration date: July 8, 2010 | Current use: Commercial | Permit id: 6219873 | |||||
SCORE 100 Date: June 26, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 20, 2009 | Expiration date: July 26, 2009 | Current use: Commercial | Permit id: 6219874 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Tenant improvement including one 100a sub-panel, lighting, switches, recepticals, communications and two split system hvac units. Date: June 25, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 4, 2009 | Expiration date: June 25, 2010 | Current use: Commercial | Permit id: 6219759 | |||||
SCORE 100 Date: February 16, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 13, 2009 | Expiration date: February 16, 2010 | Current use: Multifamily | Permit id: 6208309 | |||||
SCORE 100 Date: December 8, 2008 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 25, 2009 | Expiration date: December 8, 2009 | Current use: Multifamily | Permit id: 6203041 | |||||
SCORE 100 Date: August 13, 2008 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 10, 2008 | Expiration date: August 13, 2009 | Current use: Commercial | Permit id: 6191049 | |||||
SCORE 100 Date: August 8, 2008 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 14, 2008 | Expiration date: August 8, 2009 | Current use: Multifamily | Permit id: 6190696 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: July 6, 2009 | Expiration date: June 30, 2009 | Current use: Multifamily | Permit id: 6185870 | |||||
SCORE 100 110 5th Ave Ne Seattle Wa Wiring for ti; converting (2) units into one; times 3 for west end of bldg. Date: April 9, 2008 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: June 6, 2008 | Expiration date: April 9, 2009 | Current use: Multifamily | Permit id: 6176795 | |||||
SCORE 100 110 5th Ave Ne Seattle Wa Wiring for ti; converting (2) units into one; times 3 for east end of bldg. Date: April 9, 2008 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: June 6, 2008 | Expiration date: April 9, 2009 | Current use: Multifamily | Permit id: 6176794 | |||||
SCORE 100 Date: December 10, 2007 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: December 27, 2007 | Expiration date: December 10, 2008 | Current use: Commercial | Permit id: 6163704 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Install temp power pole - construction #6121646 two 4 amp services one north and one south Permit type: Electrical | Permit status: Permit closed | Completion date: January 29, 2009 | Expiration date: September 20, 2008 | Current use: Commercial | Permit id: 6153480 | |||||
SCORE 100 Date: July 19, 2007 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: August 1, 2007 | Expiration date: July 18, 2008 | Current use: Commercial | Permit id: 6147092 | |||||
SCORE 100 Date: April 17, 2007 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: April 25, 2007 | Expiration date: April 17, 2008 | Current use: Commercial | Permit id: 6136085 | |||||
SCORE 100 Date: July 21, 2006 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: July 28, 2006 | Expiration date: July 21, 2007 | Current use: Institutional | Permit id: 6106691 | |||||
SCORE 100 Date: May 26, 2006 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: October 12, 2006 | Expiration date: May 26, 2007 | Current use: Commercial | Permit id: 6100106 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit finaled | Completion date: October 12, 2006 | Expiration date: June 12, 2007 | Current use: Commercial | Permit id: 6099435 | |||||
SCORE 100 Date: May 17, 2006 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: January 17, 2007 | Expiration date: June 17, 2006 | Current use: Institutional | Permit id: 6098935 | |||||
SCORE 100 Date: February 14, 2006 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: April 19, 2007 | Expiration date: February 14, 2007 | Current use: Commercial | Permit id: 6088263 | |||||
SCORE 100 Date: December 20, 2005 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: January 18, 2006 | Expiration date: December 20, 2006 | Current use: Commercial | Permit id: 6082572 | |||||
SCORE 100 Date: October 27, 2005 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: April 25, 2006 | Expiration date: October 27, 2006 | Current use: Multifamily | Permit id: 6070731 | |||||
SCORE 100 13333 Greenwood Ave N Seattle Wa Get started permit; ref 6055836. Branch circuit wiring only; day permit. Date: April 26, 2005 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: January 13, 2006 | Expiration date: May 26, 2005 | Current use: Institutional | Permit id: 6056484 | |||||
SCORE 100 Date: April 26, 2005 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: February 7, 2006 | Expiration date: April 26, 2006 | Current use: Institutional | Permit id: 6056481 | |||||
SCORE 100 13333 Greenwood Ave N Seattle Wa Interior remodel of west wing, removal of penthouse apartment, minor site work Permit type: Electrical | Permit status: Permit finaled | Completion date: October 7, 2005 | Expiration date: April 28, 2006 | Current use: Institutional | Permit id: 6055836 | |||||
SCORE 100 9001 Lake City Way Ne Seattle Wa Complete electrical installation for new 4-story licensed care facility Permit type: Electrical | Permit status: Permit finaled | Completion date: May 3, 2006 | Expiration date: August 8, 2006 | Current use: Multifamily | Permit id: 6050485 | |||||
SCORE 100 Date: October 27, 2004 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: October 29, 2004 | Expiration date: October 27, 2005 | Current use: Commercial | Permit id: 6045517 | |||||
SCORE 100 Date: February 2, 2005 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: February 22, 2005 | Expiration date: February 2, 2006 | Current use: Institutional | Permit id: 6036622 | |||||
SCORE 100 Date: December 18, 2003 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: December 19, 2003 | Expiration date: December 18, 2004 | Current use: Commercial | Permit id: 6027442 | |||||
SCORE 100 2201 S Jackson St Seattle Wa Complete instalaltion of an automatic fire alarm system for (3) 5-story apartment bldg & 2 levels of parking. Date: June 4, 2003 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: February 2, 2004 | Expiration date: June 4, 2004 | Current use: Multifamily | Permit id: 6014709 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit finaled | Completion date: June 4, 2004 | Expiration date: May 5, 2004 | Current use: Multifamily | Permit id: 6013071 | |||||
SCORE 100 Date: February 27, 2003 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: March 3, 2003 | Expiration date: February 27, 2004 | Current use: Commercial | Permit id: 6011550 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit finaled | Completion date: March 17, 2003 | Expiration date: March 5, 2004 | Current use: Commercial | Permit id: 6011562 | |||||
SCORE 100 Date: February 3, 2003 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: February 7, 2003 | Expiration date: February 3, 2004 | Current use: Commercial | Permit id: 6010384 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit finaled | Completion date: January 27, 2004 | Expiration date: January 23, 2004 | Current use: Commercial | Permit id: 6008677 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit finaled | Completion date: October 22, 2003 | Expiration date: January 22, 2004 | Current use: Commercial | Permit id: 6008679 | |||||
SCORE 100 2201 S Jackson St Seattle Wa Get started permit: service entrance conduits only -ok by kkh ref permit # 6008247 Date: December 12, 2002 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: February 5, 2004 | Expiration date: December 12, 2003 | Current use: Commercial | Permit id: 6008248 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit finaled | Completion date: February 5, 2004 | Expiration date: December 3, 2003 | Current use: Commercial | Permit id: 6007723 | |||||
SCORE 100 Date: October 18, 2002 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: October 21, 2002 | Expiration date: October 18, 2003 | Current use: Commercial | Permit id: 6005568 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Install new temp 277 480v service. Extend feeders to tower crane (4) de-watering pumps concrete placing boom and (3) step-down transformer modules to distribute 120 20 power to jobsite. Applicant: Sean Packer | Permit type: Electrical - otc | Permit id: Elec-2013-07903 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Mixed use electrical- complete electrical installation for a 208 unit multi-family retail building including all low voltage work. 8 feeder 1 fire alarm 1 ground ufer 1 low voltage 1 service-new and 6 subpanels. Applicant: Robert Portillo | Permit type: Electrical plan review | Permit id: Elec-2013-09235 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Valley furniture redmond central - complete fire alarm installation for a 208 unit multi-family retail building. Date: February 10, 2014 Contractor: Unity Electric Lp Applicant: Robert Portillo | Permit type: Fire alarm | Permit id: Fire-2013-11943 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Sopa the luke- jim 206-910-3704 install alter (1) circuit for electric strike and card reader on exterior door in fitness area. Alter (1) lighting circuit and install 12 led lights at elevator lobby and relocate (1) exit sign at p1 and relocate. Customer paid for:(2) low voltage (2) new circuit Applicant: Tom Zaragoza | Permit type: Electrical - otc | Permit id: Elec-2015-02559 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Sopa the luke- gym 206-271-4906 alter (2) 120v circuits. Install (3) coaxial tv cables and (3) receptacles for new tvs. Customer paid for:(3) low voltage Applicant: Tom Zaragoza | Permit type: Electrical - otc | Permit id: Elec-2015-02887 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Sopa the luke l2 & l5 253-377-7575 add (1) new 25amp 240v circuit from l5 electric room to hvac roof top unit. Install control wire from roof top unit down to head unit in idf room on l2. Customer paid for:(1) new circuit Applicant: Tom Zaragoza | Permit type: Electrical - otc | Permit id: Elec-2015-02377 | |||||
SCORE 100 14727 Ne 87th St Redmond, Wa 98052 Immersion services- altered circuits required for reconditioning of ti space. Applicant: Troy Wallin | Permit type: Electrical - otc | Permit id: Elec-2015-04891 | |||||
SCORE 100 8935 160th Ave Ne Redmond, Wa 98052 Avalon redmond place - bldg e - floor 1 2 and 3 - add (1) light on each floor at the elevators of building a extending the existing lighting circuit to the new fixture. Total of (3) altered circuits. Applicant: Steve Reding | Permit type: Electrical - otc | Permit id: Elec-2016-05239 | |||||
SCORE 100 8935 160th Ave Ne Redmond, Wa 98052 Avalon redmond place - bldg a - floor 1 2 and 3 - add (1) light on each floor at the elevators of building a extending the existing lighting circuit to the new fixture. Total of (3) altered circuits. Applicant: Steve Reding | Permit type: Electrical - otc | Permit id: Elec-2016-05237 | |||||
SCORE 100 15817 Ne 90th St Redmond, Wa 98052 Avalon redmond place - bldg f - floor 1 2 and 3 - add (1) light on each floor at the elevators of building a extending the existing lighting circuit to the new fixture. Total of (3) altered circuits. Applicant: Steve Reding | Permit type: Electrical - otc | Permit id: Elec-2016-05241 | |||||
SCORE 100 24 Birch Ave N Seattle Wa Day "in slab branch wiring only for bldg (l3)" get started off of a p #6103901. 9 11 06 bew address correction from 25 aurora av n Date: September 8, 2006 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: November 7, 2006 | Expiration date: October 8, 2006 | Current use: Multifamily | Permit id: 6112030 | |||||
SCORE 100 3 3rd Ave W Seattle Wa Wire new [204] unit apt bldg w street front retail; includes (10) level 2b vehicle charging stations. Bldg permit #6133095. All egress lighting to be listed for emergency use. 7 20 11 mvc: revision to secondaries. 8 26 2011 bew: revision to secondaries. 9 14 11 mvc: revision - reconfigure meter center 2 & 3. 11 4 2011 bew revision;reconfigure meter center #1 Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2011 | Expiration date: December 21, 2011 | Current use: Multifamily | Permit id: 6257314 | |||||
SCORE 100 311 Cedar St Seattle Wa Installing 16 temp power for construction of mixed use bldg; bldg permit 6124652 Permit type: Electrical | Permit status: Permit closed | Completion date: March 14, 2012 | Expiration date: December 10, 2011 | Current use: Commercial | Permit id: 6267263 | |||||
SCORE 100 Date: January 5, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2012 | Expiration date: January 5, 2012 | Current use: Commercial | Permit id: 6271149 | |||||
SCORE 100 1421 Minor Ave Seattle Wa 4 22 2014 - cancelled customer log #14-324 extending circuit to add a new receptacle for owner convenience. Date: March 14, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: March 14, 2015 | Current use: Institutional | Permit id: 6408576 | |||||
SCORE 100 3801 Stone Way N Seattle Wa Temp. Power for commercial mixed used development. 7/14/2014 dwm-revised drawings went from overhead to underground Permit type: Electrical | Permit status: Permit closed | Completion date: March 29, 2016 | Expiration date: March 27, 2015 | Current use: Commercial | Permit id: 6409701 | |||||
SCORE 100 7104 Woodlawn Ave Ne Seattle Wa Fire alarm ti for new bank. 4/16/14 jcb; address changed from 7105 woodlawn ave ne. Date: April 15, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 11, 2015 | Expiration date: April 15, 2015 | Current use: Commercial | Permit id: 6413358 | |||||
SCORE 100 2 8th Ave N Seattle Wa [temporary power] for future jobs site trailers only located in parking lot at 2 8th ave. 6/2/14 jcb; address changed from 777 thomas st. Date: May 22, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 7, 2016 | Expiration date: May 22, 2015 | Current use: Commercial | Permit id: 6419380 | |||||
SCORE 100 1421 Minor Ave Seattle Wa We are replacing (4) awning lights that are not code compliant with (4) new lights with led trims rated for damp locations. 7/30/14, add (1) lighting circuit, ec. Date: July 28, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2014 | Expiration date: July 28, 2015 | Current use: Institutional | Permit id: 6429287 | |||||
SCORE 100 777 Thomas St Seattle Wa All electrical including low voltage for a new 174-unit apartment building. 9/24/15 jcb; revisions submitted for changes in the conductor, no change in job value. Permit type: Electrical | Permit status: Permit closed | Completion date: March 3, 2016 | Expiration date: June 30, 2016 | Current use: Multifamily | Permit id: 6434665 | |||||
SCORE 100 3801 Stone Way N Seattle Wa Day get started permit from project # 6435989 10-16-14 dwr extended get started for more days till 11-19-14 extended to 3/13/15 rrj Date: September 19, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 4, 2015 | Expiration date: March 13, 2015 | Current use: Commercial | Permit id: 6437439 | |||||
SCORE 100 4 8th Ave N Seattle Wa Day get started permit for branch circuts and underground conduit embedded conduit (plan review # 6439485). 11/5/14 rrj extended to 12/2/14 -- 11-26-14 dwr extended get started to 1-2-15 : 1-6-15 dwr extended get started for days. Date: October 2, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2015 | Expiration date: February 6, 2015 | Current use: Multifamily | Permit id: 6439488 | |||||
SCORE 100 3601 Greenwood Ave N Seattle Wa Closed - parent permit issued day get started to witness conduit and for branch circuits only; plan review under 644258. Extended to 12/22/14 rrj. Date: October 22, 2014 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: December 22, 2014 | Current use: Multifamily | Permit id: 6442584 | |||||
SCORE 100 4 8th Ave N Seattle Wa All electrical including low voltage for a new 2-story retail camera store. [north tenant space; levels p1, l1, and l2]. 11 16 16 sk renewal Permit type: Electrical | Permit status: Permit issued | Expiration date: June 5, 2016 | Current use: Commercial | Permit id: 6473612 | |||||
SCORE 100 809 Olive Way Seattle Wa Closed - no known work done under this permit add (1) dedicated 120v receptacle in fitness center for new treadmill Date: November 9, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 8, 2016 | Current use: Commercial | Permit id: 6504076 | |||||
SCORE 100 4545 8th Ave Ne Seattle Wa Closed - no known work done under this permit add (1) receptacle at l1 outside electrical room, add (5) data drops at l1 electrical room, active building location, touch screen location, security room and package lockers. Date: December 17, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 16, 2016 | Current use: Commercial | Permit id: 6510177 | |||||
SCORE 100 2001 8th Ave Seattle Wa Move horn strobe up 18" from existing location. This a ti space in existing building for new cafe. Date: February 11, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: February 17, 2016 | Expiration date: February 10, 2017 | Current use: Commercial | Permit id: 6518518 | |||||
SCORE 100 Date: October 12, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: October 12, 2017 | Current use: Commercial | Permit id: 6561453 | |||||
SCORE 100 2 Minor Ave N Seattle Wa Hook up 2 construction office trailers to existing 1 amp service. Amp 240v feed to each trailer. Date: October 12, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2016 | Expiration date: October 12, 2017 | Current use: Commercial | Permit id: 6561496 | |||||
SCORE 100 118 Republican St Seattle Wa Replacement of (4) existing cameras and installation of (9) new cameras. Date: October 20, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: October 20, 2017 | Current use: Commercial | Permit id: 6562888 | |||||
SCORE 100 1527 15th Ave Seattle Wa Replacement of (1) dvr, addition of camera at bike storage and addition of camera at roof top Date: October 25, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2016 | Expiration date: October 25, 2017 | Current use: Commercial | Permit id: 6563710 | |||||
SCORE 100 3801 Stone Way N Seattle Wa Installation of feeder wire for 2 amp 3 phase 120 208 volt service at suite d. Date: October 26, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: October 26, 2017 | Current use: Commercial | Permit id: 6563957 | |||||
SCORE 100 11556 Greenwood Ave N Seattle Wa Installation of (1) low voltage line and (1) line voltage line for telephone door access entry system Date: October 27, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: October 27, 2017 | Current use: Commercial | Permit id: 6564047 | |||||
SCORE 100 1601 13th Ave Seattle Wa Replacement of nvr & (8) existing cameras. Relocation on main entry garage camera. Relocation of rooftop camera. Addition of rooftop lounge camera, bike storage camera and lower parking level west stair door. Addition of (3) level 1 lobby card readers. Date: November 15, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2016 | Expiration date: November 15, 2017 | Current use: Commercial | Permit id: 6567129 | |||||
SCORE 100 523 Broadway E Seattle Wa Replacement of existing nvr and (11) cameras. Addition of (7) cameras. Please see technician for locations. Date: November 15, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 29, 2016 | Expiration date: November 15, 2017 | Current use: Commercial | Permit id: 6567174 | |||||
SCORE 100 422 Yale Ave N Seattle Wa Replacement of existing nvr and (4) cameras. Addition of (2) cameras at each of p2, p3 and p4 garages. Addition of (1) camera at p1 and (2) cameras at the roof top. Date: November 15, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 15, 2017 | Current use: Commercial | Permit id: 6567201 | |||||
SCORE 100 3827 14th Ave W Seattle Wa Add (1) card reader at bbq area and (1) card reader at fitness room door. Add (6) cameras, replace (1) nvr. Technician to show locations. Date: November 26, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 26, 2017 | Current use: Commercial | Permit id: 6568724 | |||||
SCORE 100 118 6th Ave N Seattle Wa Replacement of (1) dvr with new nvr and replacement of (4) existing cameras. Date: November 29, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 29, 2017 | Current use: Commercial | Permit id: 6569130 | |||||
SCORE 100 3601 Greenwood Ave N Seattle Wa Installation of (1) new nvr and (3) cameras at the main lobby, at the garage roll up gate and at the bike storage. Installation of (1) card reader at north stairwell door. Date: November 30, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 28, 2016 | Expiration date: November 30, 2017 | Current use: Commercial | Permit id: 6569496 | |||||
SCORE 100 703 Bellevue Ave E Seattle Wa Installation of (1) amp receptacle for kitchen appliances in remodel of unit #114. Date: December 5, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 7, 2016 | Expiration date: December 5, 2017 | Current use: Commercial | Permit id: 6570066 | |||||
SCORE 100 Date: December 7, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 9, 2016 | Expiration date: December 7, 2017 | Current use: Multifamily | Permit id: 6570293 | |||||
SCORE 100 Date: December 19, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 20, 2016 | Expiration date: December 19, 2017 | Current use: Institutional | Permit id: 6572270 | |||||
SCORE 100 Date: December 21, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 21, 2017 | Current use: Commercial | Permit id: 6572908 | |||||
SCORE 100 Date: December 27, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2017 | Expiration date: December 27, 2017 | Current use: Commercial | Permit id: 6573406 | |||||
SCORE 100 Date: December 28, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 28, 2017 | Current use: Commercial | Permit id: 6573620 | |||||
SCORE 100 Date: December 30, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 30, 2017 | Current use: Commercial | Permit id: 6574058 | |||||
SCORE 100 Date: January 4, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: January 4, 2018 | Current use: Commercial | Permit id: 6574440 | |||||
SCORE 100 3601 Greenwood Ave N Seattle Wa Tap into existing fire alarm notification circuit and install (4) new strobes in new toilet and shower room Date: January 10, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: January 10, 2018 | Current use: Commercial | Permit id: 6575489 | |||||
SCORE 100 3601 Greenwood Ave N Seattle Wa Lighting, power and limited low voltage build out for tenant improvement in existing retail shell. Date: January 13, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: January 13, 2018 | Current use: Commercial | Permit id: 6575999 | |||||
SCORE 100 Date: October 26, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 15, 2016 | Expiration date: October 26, 2017 | Current use: Commercial | Permit id: 6563938 | |||||
SCORE 100 306 Queen Anne Ave N Seattle Wa Installation of (1) nvr, (2) cameras and (3) card readers. See technician for locations. Date: November 30, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 30, 2017 | Current use: Commercial | Permit id: 6569497 | |||||
SCORE 100 2821 S Walden St Seattle Wa Addition of 19,677 sf skilled nursing wing to existing facility. Remodel of existing facility. Per the washington center for comprehensive rehabilitation this is not a "patient care" facility,but sleeping only Permit type: Electrical | Permit status: Permit finaled | Completion date: May 4, 2005 | Expiration date: June 16, 2005 | Current use: Institutional | Permit id: 6036493 | |||||
SCORE 100 815 4th Ave N Seattle Wa Add two circuits in 2nd floor bistro prep area for microwave and salad table. One cicuit in bistro for coffee machine. 4/08/08 cmb - add 60amp circuit for dishwasher. Date: October 25, 2007 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: June 10, 2008 | Expiration date: October 24, 2008 | Current use: Multifamily | Permit id: 6158732 | |||||
SCORE 100 Date: April 26, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2011 | Expiration date: April 26, 2012 | Current use: Multifamily | Permit id: 6281374 | |||||
SCORE 100 Date: September 14, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 14, 2018 | Current use: Multifamily | Permit id: 6579628 | |||||
SCORE 100 4 Pontius Ave N Seattle Wa Uninstalling/lowering/and rewireing the alleyway cantenary lighting from 26 to above grade Applicant: Unity Electric Lp | Permit type: Sign/billboard/awning | Permit status: Application accepted | Current use: Commercial | Permit id: 6395610 | |||||
SCORE 100 Date: March 20, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: March 20, 2018 | Current use: Commercial | Permit id: 6587164 | |||||
SCORE 100 215 10th Ave E Seattle Wa Closed without final inspection, no known life safety issues extending a cat5 cable from behind a tv to above the fridge for a future camera. Date: April 13, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: April 13, 2017 | Current use: Commercial | Permit id: 6529086 | |||||
SCORE 100 Date: March 21, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 14, 2017 | Expiration date: March 21, 2018 | Current use: Commercial | Permit id: 6587429 | |||||
SCORE 100 Date: March 9, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 14, 2017 | Expiration date: March 9, 2018 | Current use: Commercial | Permit id: 6585385 | |||||
SCORE 100 Date: April 17, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: April 17, 2018 | Current use: Commercial | Permit id: 6592155 | |||||
SCORE 100 Date: April 17, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 15, 2017 | Expiration date: April 17, 2018 | Current use: Multifamily | Permit id: 6591984 | |||||
SCORE 100 13023 Greenwood Ave N Seattle Wa 4 18 2017 - cancelled customer log #17-499relocation of (2) annunciators for lobby remodel Date: January 11, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: January 11, 2018 | Current use: Commercial | Permit id: 6575607 | |||||
SCORE 100 2483 Birch Ave N Seattle Wa Add (3) circuits for security cameras at bike storage, east stairwell to 6th avenue and p1/lvl1 elevator. Date: August 18, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: August 17, 2016 | Current use: Commercial | Permit id: 6490319 | |||||
SCORE 100 24 4th Ave Seattle Wa Closed as incomplete replacement of (1) nvr and (6) existing cameras. Relocation of (1) camera from behind tree to the drive entrance. Addition of (1) camera above opposite drive entrance. Date: November 15, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 15, 2017 | Current use: Commercial | Permit id: 6567150 | |||||
SCORE 100 1319 Dexter Ave N Seattle Wa Day get started to be on site for fire alarm only; plan review under 6531780. 6/2/16 paf renewal. 6/27/16 renew Date: April 27, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 15, 2016 | Expiration date: July 27, 2016 | Current use: Commercial | Permit id: 6531784 | |||||
SCORE 100 285 8th Ave N Seattle Wa Installation of (1) receptacle and (1) data jack near package room for amazon locker. Date: June 27, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: June 27, 2018 | Current use: Commercial | Permit id: 6605098 | |||||
SCORE 100 703 Bellevue Ave E Seattle Wa Addition of (1) amp 208v circuit for kitchen appliance and (1) 120v circuit for under cabinet lighting in each unit #s 2 and 312. Date: June 9, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 28, 2017 | Expiration date: June 9, 2018 | Current use: Commercial | Permit id: 6601950 | |||||
SCORE 100 1287 Westlake Ave N Seattle Wa Inspection only/ufer - closed without final inspection, no known life safety issues1/2 hour inspection to witness conduit - per john saldana - conduit under slab and under slab conduits for main building service 9/18/15 hkh; address changed from 1247 westlake ave n Date: September 18, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Expiration date: September 18, 2016 | Current use: Single family / duplex | Permit id: 6495418 | |||||
SCORE 100 1414 Dexter Ave N Seattle Wa Day get started to be on site for branch circuits only, plan review permit under #6495574 extended to 12/20/15 rrj 12/23/15 hkh; per j. Saldana extend to 1/15/16. 1/15/16 hkh; renew. Extended to 3/10/16 rrj. Extended until 3/31/16, jas Date: September 18, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 15, 2016 | Expiration date: March 31, 2016 | Current use: Multifamily | Permit id: 6495576 | |||||
SCORE 100 1287 Westlake Ave N Seattle Wa Day get started to be on site for branch circuits only, plan review permit under #6495578 extended to 12/20/15 rrj 12/23/15 hkh; per j. Saldana extend to 1/15/2016 1/15/16 hkh; renew extended to 3/10/16 rrj, extended until 3/31/16 jas Date: September 18, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2016 | Expiration date: March 31, 2016 | Current use: Multifamily | Permit id: 6495581 | |||||
SCORE 100 1421 Minor Ave Seattle Wa Installation of (4) cat5 runs for nurse call system (2 on first floor, 1 on second and 1 on third floor), installation of (2) receptacles for lamps (1 in entry and 1 in lobby). Date: June 13, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2017 | Expiration date: June 13, 2018 | Current use: Commercial | Permit id: 6602431 | |||||
SCORE 100 Date: April 24, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2017 | Expiration date: April 24, 2018 | Current use: Commercial | Permit id: 6593217 | |||||
SCORE 100 2217 3rd Ave Seattle Wa Closed - no known work done under this permit (2) data lines from third floor communication to leasing area. (1) data line from leasing area to package machine in hallway. (1) receptacle in hallway. Date: March 16, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: March 16, 2017 | Current use: Commercial | Permit id: 6524378 | |||||
SCORE 100 525 Ne Northgate Way Seattle Wa Installation of (1) low voltage circuit at sw entry door in order to tie into door access system Date: March 17, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: March 17, 2018 | Current use: Commercial | Permit id: 6586811 | |||||
SCORE 100 Date: June 9, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 25, 2017 | Expiration date: June 9, 2018 | Current use: Institutional | Permit id: 6601743 | |||||
SCORE 100 1414 Dexter Ave N Seattle Wa Day get started permit for branch circuits only. Plan review under permit 6487964. West building closest to dexter enter from westlake. Gridline to 16 extended to 10/4/15 rrj Date: August 4, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: October 4, 2015 | Current use: Multifamily | Permit id: 6487966 | |||||
SCORE 100 115 Warren Ave N Seattle Wa Add 1 receptacle in main lobby below tv. Replace card reader alley door by garage Date: August 11, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 17, 2017 | Expiration date: August 11, 2018 | Current use: Multifamily | Permit id: 6612936 | |||||
SCORE 100 1414 Dexter Ave N Seattle Wa Complete electrical installation, including all low voltage work. Bldg permit under permit #6401146 4-7-17 brs extended one month to allow for completion Permit type: Electrical | Permit status: Permit issued | Completion date: April 21, 2017 | Expiration date: April 4, 2017 | Current use: Multifamily | Permit id: 6487964 | |||||
SCORE 100 7125 Fauntleroy Way Sw Seattle Wa Relocation of (1) horn, strobe, relocation of (3) smoke detectors and addition of (2) cable jacks and (2) phone jacks. Date: February 8, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 25, 2017 | Expiration date: February 8, 2018 | Current use: Commercial | Permit id: 6580237 | |||||
SCORE 100 711 Bellevue Ave E Seattle Wa Installation of (1) amp circuit for cooktop in both unit #6 and #601. 3 29 17 paf change address from 703 bellevue ave e Date: March 21, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2017 | Expiration date: March 21, 2018 | Current use: Commercial | Permit id: 6587431 | |||||
SCORE 100 30 17th Ave W Seattle Wa Addition and extention of existing fire alarm to convert retail spaces to (6) live/work lofts Date: May 31, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Completion date: November 3, 2016 | Expiration date: May 31, 2017 | Current use: Multifamily | Permit id: 6529070 | |||||
SCORE 100 30 17th Ave W Seattle Wa Complete electrical installation to convert shell retail space(s) into (6) separate live/work lofts. Permit type: Electrical | Permit status: Permit issued | Completion date: November 4, 2016 | Expiration date: May 12, 2017 | Current use: Multifamily | Permit id: 6526321 | |||||
SCORE 100 Date: December 4, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 13, 2017 | Expiration date: December 4, 2018 | Current use: Commercial | Permit id: 6633416 | |||||
SCORE 100 8 Seneca St Seattle Wa Closed without final inspection, no known life safety issues installation of (1) strobe Date: May 9, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: May 9, 2017 | Current use: Commercial | Permit id: 6533834 | |||||
SCORE 100 2 S Webster St Seattle Wa Closed without final inspection, no known life safety issues installation of conduit raceway for future fiber Date: May 11, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: May 11, 2017 | Current use: Industrial | Permit id: 6534355 | |||||
SCORE 100 Date: December 14, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 14, 2018 | Current use: Commercial | Permit id: 6635271 | |||||
SCORE 100 1319 Dexter Ave N Seattle Wa Day get started to witness conduit and for branch circuits only; plan review under 6522071. 4/4/16vp: renew. 4-27-16 dwr extended get started till 6-3-16. 5-27-16 dwr extended to 6-30-16. 6/27/16 renew 7-28-16 dwr extended get started till 8-15-16. Date: March 3, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 10, 2016 | Expiration date: August 15, 2016 | Current use: Commercial | Permit id: 6522072 | |||||
SCORE 100 27 4th Ave Seattle Wa Closed - no known work done under this permit extend (1) circuit, add (3) receptacles in bike room Date: May 16, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: May 16, 2017 | Current use: Commercial | Permit id: 6535036 | |||||
SCORE 100 Date: August 29, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: August 29, 2018 | Current use: Multifamily | Permit id: 6616117 | |||||
SCORE 100 1287 Westlake Ave N Seattle Wa Temporary power. Assoc. Building permit #6392906 (permit not issued), 5/20/2015,bcs, building permit issued. 6-29-16 dwr extended till 5-20-17. Permit type: Electrical | Permit status: Permit issued | Expiration date: May 20, 2017 | Current use: Multifamily | Permit id: 6467858 | |||||
SCORE 100 1287 Westlake Ave N Seattle Wa Complete fire alarm system for mixed use residential building 3-17-17 dwr extend permit for one year till 3-17-18. Date: January 19, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Completion date: May 22, 2017 | Expiration date: January 19, 2017 | Current use: Multifamily | Permit id: 6501462 | |||||
SCORE 100 Date: April 24, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 24, 2017 | Expiration date: April 24, 2018 | Current use: Multifamily | Permit id: 6593414 | |||||
SCORE 100 1255 Harrison St Seattle Wa Day get started permit for branch circuits only. Assoc. #6579628 in review. (block 11) 04 14 17 cep; renewal Date: February 3, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 25, 2017 | Expiration date: March 3, 2018 | Current use: Multifamily | Permit id: 6579631 | |||||
SCORE 100 215 10th Ave E Seattle Wa Installation of (1) bypass switch with timer to controls sprinklers at dog run area. Date: May 26, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: May 26, 2018 | Current use: Commercial | Permit id: 6599485 | |||||
SCORE 100 Date: March 28, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2017 | Expiration date: March 28, 2018 | Current use: Commercial | Permit id: 6588594 | |||||
SCORE 100 703 Bellevue Ave E Seattle Wa Installation of (1) amp 208v circuit for convection oven in both unit #108 and #200. Date: May 15, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2017 | Expiration date: May 15, 2018 | Current use: Commercial | Permit id: 6597084 | |||||
SCORE 100 13023 Greenwood Ave N Seattle Wa Relocate existing fa annunciator, add three strobe and one smoke detector 04 17 17 cep; add (1) fa control unit. Date: March 20, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 30, 2017 | Expiration date: March 20, 2018 | Current use: Institutional | Permit id: 6586954 | |||||
SCORE 100 Date: April 4, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 30, 2017 | Expiration date: April 4, 2018 | Current use: Commercial | Permit id: 6590001 | |||||
SCORE 100 7211 Perimeter Rd S Seattle Wa 11 2 2017 - cancelled customer log #17-1375 installation of (3) amp circuits and (2) amp circuits for hvac retrofit Date: December 5, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 5, 2017 | Current use: Commercial | Permit id: 6570045 | |||||
SCORE 100 Date: November 8, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 8, 2018 | Current use: Commercial | Permit id: 6629284 | |||||
SCORE 100 Date: November 8, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 8, 2018 | Current use: Commercial | Permit id: 6629269 | |||||
SCORE 100 5603 24th Ave Nw Seattle Wa Installation of up to (5) fire alarm devices for code compliant fire alarm system within retail shell for future fit 36 gym. Date: September 12, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 13, 2017 | Expiration date: September 12, 2018 | Current use: Commercial | Permit id: 6618488 | |||||
SCORE 100 4 8th Ave N Seattle Wa All electrical including all low voltage for a new 211 unit apartment building. 2-17-16 brs extended permit 4 months to allow for completion of job. 6/13/16 jcb; extend for 4 months to allow for job completion. Permit type: Electrical | Permit status: Permit closed | Completion date: September 15, 2016 | Expiration date: October 2, 2016 | Current use: Multifamily | Permit id: 6439485 | |||||
SCORE 100 3801 Stone Way N Seattle Wa Closed without final inspection, no known life safety issues installation of (1) data line for gaming connectivity. Date: November 14, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 14, 2017 | Current use: Commercial | Permit id: 6566984 | |||||
SCORE 100 1414 Dexter Ave N Seattle Wa Complete fire alarm system for mixed use residential building 3-7-17 brs extended permit to allow for completion of plans job 3-17-17 dwr extend till 3-17-17 to match electrical permit extension. Date: January 19, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Completion date: April 5, 2017 | Expiration date: January 19, 2017 | Current use: Multifamily | Permit id: 6501459 | |||||
SCORE 100 5 Broadway Seattle Wa Power and connections for (2) split system heat pumps for retail space #116 & #125. Date: November 29, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 29, 2018 | Current use: Commercial | Permit id: 6632685 | |||||
SCORE 100 Date: December 11, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 11, 2018 | Current use: Commercial | Permit id: 6634725 | |||||
SCORE 100 2418 Nw 56th St Seattle Wa Installation of (1) amp 208v receptacle and (1) 120v circuit for hvac equipment in the warming kitchen. Date: January 30, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: January 30, 2018 | Current use: Commercial | Permit id: 6578738 | |||||
SCORE 100 201 Ne 40th St Seattle Wa Taking out existing fixtures and outlets and replacing them with new ones. 9 2 08 jsbm - add (5) switches, (1) 1 amp feeder 7 16 09 jnl - about to expire letter sent Date: August 14, 2008 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 6, 2009 | Expiration date: August 14, 2009 | Current use: Multifamily | Permit id: 6191264 | |||||
SCORE 100 53 24th Ave Ne Seattle Wa Closed without final inspection, no known life safety issues install (1) saflok card reader on sw gate of merrill gardens. Date: April 12, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: April 12, 2017 | Current use: Multifamily | Permit id: 6528809 | |||||
SCORE 100 1255 Harrison St Seattle Wa Days get started for branch circuits only. Plan review done under permit 65697 2 17 17 hkh; extend days from 2 18 17 4-6-17 dwr extended till 5-7-17. Date: January 18, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Completion date: April 13, 2017 | Expiration date: February 18, 2017 | Current use: Commercial | Permit id: 6576658 | |||||
SCORE 100 Date: July 21, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 24, 2017 | Expiration date: July 21, 2018 | Current use: Multifamily | Permit id: 6609112 | |||||
SCORE 100 703 Bellevue Ave E Seattle Wa Extension of (1) receptacle for under-cabinet lighting in unit #310, relocation of (1) amp circuit for range power in unit #3 and 405 and installation of (1) new amp circuit for cooktop in unit #3 and 405. Date: February 2, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 1, 2017 | Expiration date: February 2, 2018 | Current use: Commercial | Permit id: 6579314 | |||||
SCORE 100 7125 Fauntleroy Way Sw Seattle Wa Installation of (9) line voltage smoke detectors at unit #s 540,541,442,443,4 and 570. Date: February 8, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2017 | Expiration date: February 8, 2018 | Current use: Commercial | Permit id: 6580250 | |||||
SCORE 100 Date: April 17, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 26, 2017 | Expiration date: April 17, 2018 | Current use: Multifamily | Permit id: 6591983 | |||||
SCORE 100 Date: August 9, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: August 9, 2018 | Current use: Commercial | Permit id: 6612520 | |||||
SCORE 100 711 Bellevue Ave E Seattle Wa Installation of (1) amp 208 volt circuit in unit #s 111,116 & 134. Installation of power for undercabinet lighting in unit #s 111 & 314. Date: April 6, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2017 | Expiration date: April 6, 2018 | Current use: Commercial | Permit id: 6590375 | |||||
SCORE 100 1414 Dexter Ave N Seattle Wa Complete electrical installation, including all low voltage work for a 6 story, 159 unit residential bldg. Over 4 stories of below grade parking. Related to electrical permit for 1287 westlake ave n. #6495578. 2 10 16 sk adjusted job value per application 3-17-17 dwr extend permit for one year to 3-15-18. Permit type: Electrical | Permit status: Permit issued | Expiration date: March 15, 2017 | Current use: Multifamily | Permit id: 6495574 | |||||
SCORE 100 1319 Dexter Ave N Seattle Wa Complete electrical installation, including all low voltage work for 11-story, 296 unit residential building. Over 3 stories for below grade parking. Tr 10 12 17 extended permit Permit type: Electrical | Permit status: Permit issued | Expiration date: August 10, 2017 | Current use: Commercial | Permit id: 6522071 | |||||
SCORE 100 Date: July 15, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: July 15, 2017 | Current use: Commercial | Permit id: 6531780 | |||||
SCORE 100 Date: May 10, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 2, 2017 | Expiration date: May 10, 2018 | Current use: Commercial | Permit id: 6596494 | |||||
SCORE 100 Date: September 6, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 6, 2018 | Current use: Commercial | Permit id: 6617423 | |||||
SCORE 100 Date: May 31, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2017 | Expiration date: May 31, 2018 | Current use: Commercial | Permit id: 6600089 | |||||
SCORE 100 Date: August 22, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 6, 2017 | Expiration date: August 22, 2018 | Current use: Institutional | Permit id: 6614754 | |||||
SCORE 100 4 8th Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install pv system on roof and connect to building electrical system. 02 01 17 jk approved plans. Date: September 15, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 15, 2017 | Current use: Commercial | Permit id: 6556734 | |||||
SCORE 100 118 Republican St Seattle Wa Relocation of (1) horn strobe, relocation of (1) receptacle and (1) data jack on the left hand wall and relocation of (1) receptacle on right hand wall with installation of (1) new data line. Date: August 24, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 6, 2017 | Expiration date: August 24, 2018 | Current use: Commercial | Permit id: 6615351 | |||||
SCORE 100 1 Taylor Ave N Seattle Wa Installation of power & data in the lobby of both building a and building b for amazon package lockers. Date: August 17, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 1, 2017 | Expiration date: August 17, 2018 | Current use: Commercial | Permit id: 6614121 | |||||
SCORE 100 1938 Fairview Ave E Seattle Wa Alteration of (1) existing circuit in order to add (5) receptacles and relocation of (1) dimmer switch. Date: March 29, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: March 29, 2018 | Current use: Commercial | Permit id: 6588860 | |||||
SCORE 100 306 23rd Ave S Seattle Wa Tenant improvement remodel of existing space to install equipment for casual dining and retail use. Existing lighting is to remain with minor relocation Date: December 5, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: December 5, 2018 | Current use: Commercial | Permit id: 6633687 | |||||
SCORE 100 1319 Dexter Ave N Seattle Wa [temporary power. ] hook up 3 trailers to scl service. 12/3/15 sk add (3) 1 amp feeders Date: October 20, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2015 | Expiration date: October 19, 2016 | Current use: Multifamily | Permit id: 6500700 | |||||
SCORE 100 Date: December 2, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 6, 2011 | Expiration date: December 1, 2012 | Current use: Multifamily | Permit id: 6303856 | |||||
SCORE 100 Date: October 18, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: February 23, 2012 | Expiration date: October 18, 2012 | Current use: Commercial | Permit id: 6292505 | |||||
SCORE 100 Date: October 17, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 24, 2011 | Expiration date: October 16, 2012 | Current use: Commercial | Permit id: 6299011 | |||||
SCORE 100 805 4th Ave N Seattle Wa Add closet light fixture and switch. Add shower light fixture switched with vanity light Date: October 13, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 18, 2011 | Expiration date: October 12, 2012 | Current use: Multifamily | Permit id: 6298660 | |||||
SCORE 100 16 E Madison St Seattle Wa Move strobe and pull station over 2 feet next to elevator door. Extend circuit for outdoor unit in garage. Date: July 13, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 22, 2017 | Expiration date: July 13, 2018 | Current use: Commercial | Permit id: 6607609 | |||||
SCORE 100 30 17th Ave W Seattle Wa Day get started; authorized to be onsite only; okay per tim porter. Plan review under #6304404. Date: December 7, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 28, 2011 | Expiration date: January 7, 2012 | Current use: Commercial | Permit id: 6304405 | |||||
SCORE 100 Date: July 19, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 16, 2012 | Expiration date: July 19, 2012 | Current use: Commercial | Permit id: 6283918 | |||||
SCORE 100 805 4th Ave N Seattle Wa Install magnetic door holders on activity and wellnes center rooms on ground floor. Date: July 7, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 18, 2011 | Expiration date: July 6, 2012 | Current use: Commercial | Permit id: 6288453 | |||||
SCORE 100 3801 Stone Way N Seattle Wa Extend existing fire alarm system for a new restaurant system in existing shell space, level 1 se corner of retail space Date: March 7, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 15, 2017 | Expiration date: March 7, 2018 | Current use: Commercial | Permit id: 6583879 | |||||
SCORE 100 2304 2nd Ave Seattle Wa 8 amp temp power for mixed use bldg; bldg permi 62033878 23 12 mvc: revision - change man hoist feeder & transformer Permit type: Electrical | Permit status: Permit closed | Completion date: March 5, 2013 | Expiration date: June 22, 2012 | Current use: Commercial | Permit id: 6270510 | |||||
SCORE 100 Date: June 27, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 5, 2011 | Expiration date: June 26, 2012 | Current use: Commercial | Permit id: 6287409 | |||||
SCORE 100 1024 S Elmgrove St Seattle Wa Cancel per customer log #13-226 re install existing circuit with new wire6 21 2012 jnl - about to expire letter mailed Date: June 30, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: June 29, 2012 | Current use: Commercial | Permit id: 6287881 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: April 17, 2012 | Expiration date: June 9, 2012 | Current use: Commercial | Permit id: 6279657 | |||||
SCORE 100 Date: May 17, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2011 | Expiration date: May 17, 2012 | Current use: Commercial | Permit id: 6283417 | |||||
SCORE 100 Date: June 2, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: August 2, 2011 | Expiration date: June 2, 2012 | Current use: Institutional | Permit id: 6285013 | |||||
SCORE 100 1319 Dexter Ave N Seattle Wa Installation of receptacles for seasonal lightingmisc. Sidewalk and planter lighting Date: July 18, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: July 18, 2018 | Current use: Commercial | Permit id: 6608492 | |||||
SCORE 100 3 3rd Ave W Seattle Wa Day get started for branch ckts only; okay per tim porter. Plan review under #6257314. Ter 12/9/ extended an addition week. Trp 12/20/ extended until end of the year. Date: August 9, 2010 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 21, 2010 | Expiration date: December 30, 2010 | Current use: Multifamily | Permit id: 6257315 | |||||
SCORE 100 Date: January 31, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6578991 | |||||
SCORE 100 Date: September 19, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 19, 2018 | Current use: Commercial | Permit id: 6619676 | |||||
SCORE 100 Date: October 25, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2017 | Expiration date: October 25, 2018 | Current use: Commercial | Permit id: 6626497 | |||||
SCORE 100 535 Pontius Ave N Seattle Wa Installation of (3) fixtures on retail patio in order to illuminate canopy space. Date: September 14, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 21, 2017 | Expiration date: September 14, 2018 | Current use: Commercial | Permit id: 6618956 | |||||
SCORE 100 Date: June 26, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 5, 2017 | Expiration date: June 26, 2018 | Current use: Multifamily | Permit id: 6604790 | |||||
SCORE 100 703 Bellevue Ave E Seattle Wa Installation of (1) amp 208v circuit for kitchen circuitry in each of unit #s 202, 206, 317 and 408. Date: July 6, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: July 6, 2018 | Current use: Commercial | Permit id: 6606318 | |||||
SCORE 100 5601 24th Ave Nw Seattle Wa Day get started for branch circuits only; plan review under 6471167. 5/28/15 jcb; extend get started for days while plans are still under review. Extended days from start of review. Rrj extended to 7/24/15 rrj Date: April 28, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 23, 2015 | Expiration date: July 24, 2015 | Current use: Multifamily | Permit id: 6471168 | |||||
SCORE 100 12 Republican St Seattle Wa Installation of (3) cameras at phase ii package room, east alley gate and community trash room. Installation of (1) card reader at bike storage door. Date: October 6, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: October 6, 2018 | Current use: Commercial | Permit id: 6623001 | |||||
SCORE 100 Date: October 9, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: October 9, 2018 | Current use: Multifamily | Permit id: 6623135 | |||||
SCORE 100 1938 Fairview Ave E Seattle Wa Closed without final inspection, no known life safety issues installation of (1) 120v receptacle and electric strike at first floor garage lobby entrance for future ada door opener Date: June 30, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: June 30, 2017 | Current use: Commercial | Permit id: 6543660 | |||||
SCORE 100 16 E Madison St Seattle Wa Install 50a subpanel feeder to feed existing branch circuits. Install (1) 30a heat pump circuit fed from new panel. Date: September 28, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: September 28, 2018 | Current use: Commercial | Permit id: 6621541 | |||||
SCORE 100 1938 Fairview Ave E Seattle Wa Closed without final inspection, no known life safety issues add receptacle for projector and data Date: June 16, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: June 16, 2017 | Current use: Commercial | Permit id: 6541167 | |||||
SCORE 100 1287 Westlake Ave N Seattle Wa Complete electrical installation, including all low voltage work for a 6 story, 158 unit mixed use building - related to electrical permit for 1414 dexter n #6495574 3-17-17 dwr extend permit for one year till 3-16-18. Permit type: Electrical | Permit status: Permit issued | Completion date: June 21, 2017 | Expiration date: March 16, 2017 | Current use: Multifamily | Permit id: 6495578 | |||||
SCORE 100 Date: July 13, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: July 13, 2018 | Current use: Commercial | Permit id: 6607709 | |||||
SCORE 100 Date: November 20, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: November 20, 2018 | Current use: Commercial | Permit id: 6631392 | |||||
SCORE 100 Date: October 27, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: October 27, 2018 | Current use: Multifamily | Permit id: 6626908 | |||||
SCORE 100 Date: February 4, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 13, 2016 | Expiration date: February 4, 2017 | Current use: Multifamily | Permit id: 6452534 | |||||
SCORE 100 3025 Nw Market St Seattle Wa Installation of coax cable from the third floor communication room next to the elevator to the basement electrical room by the gym. Roughly 2 run. Date: October 26, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 30, 2017 | Expiration date: October 26, 2018 | Current use: Commercial | Permit id: 6626812 | |||||
SCORE 100 13023 Greenwood Ave N Seattle Wa Remodel of existing lobby. 3 22 17 paf remove (56) luminaries, add (13) switches, (15) receptacles, (2) lv devices, (9) comm devices, (2) 15-25 amp circuits. Date: December 21, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Completion date: March 23, 2017 | Expiration date: December 21, 2017 | Current use: Commercial | Permit id: 6572960 | |||||
SCORE 100 12051 28th Ave Ne Seattle Wa Installation of (1) dedicated circuit in main electrical room for air compressor located in sprinkler room. Date: July 21, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 24, 2017 | Expiration date: July 21, 2018 | Current use: Commercial | Permit id: 6609216 | |||||
SCORE 100 711 Bellevue Ave E Seattle Wa Install power to ceiling fan above serving bar. 5/19/16 paf add (1) amp circuit Date: April 29, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: May 25, 2016 | Expiration date: April 29, 2017 | Current use: Commercial | Permit id: 6532426 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Closed without final inspection, no known life safety issues run cat5 cable for new camera in bike storage area in parking garage Date: March 24, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: March 24, 2017 | Current use: Commercial | Permit id: 6525635 | |||||
SCORE 100 Date: April 15, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 18, 2011 | Expiration date: April 14, 2012 | Current use: Commercial | Permit id: 6280329 | |||||
SCORE 100 Date: April 13, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: July 21, 2017 | Expiration date: April 13, 2018 | Current use: Commercial | Permit id: 6591492 | |||||
SCORE 100 Date: February 22, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 17, 2017 | Expiration date: February 22, 2018 | Current use: Commercial | Permit id: 6582646 | |||||
SCORE 100 Date: October 11, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 17, 2017 | Expiration date: October 11, 2018 | Current use: Commercial | Permit id: 6623704 | |||||
SCORE 100 Date: August 16, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: October 24, 2011 | Expiration date: September 16, 2011 | Current use: Commercial | Permit id: 6292752 | |||||
SCORE 100 201 S King St Seattle Wa Adding bypass timer for irrigation system 1/15/16 hkh; add (1) magnetic lock device Date: October 9, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 20, 2016 | Expiration date: October 8, 2016 | Current use: Commercial | Permit id: 6499044 | |||||
SCORE 100 12 Harrison St Seattle Wa Closed without final inspection, no known life safety issues install (1) camera at p1 residential gate and (1) camera at rooftop terrace Date: March 22, 2016 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: March 22, 2017 | Current use: Commercial | Permit id: 6525359 | |||||
SCORE 100 1287 Westlake Ave N Seattle Wa Days get started for branch circuits only. Plan review done under permit #6501462. 12/22/15vp: extended get started permit. Date: October 23, 2015 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: January 19, 2016 | Expiration date: January 23, 2016 | Current use: Multifamily | Permit id: 6501464 | |||||
SCORE 100 Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2012 | Expiration date: March 3, 2012 | Current use: Commercial | Permit id: 6274409 | |||||
SCORE 100 Date: February 25, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2012 | Expiration date: February 25, 2012 | Current use: Commercial | Permit id: 6275619 | |||||
SCORE 100 311 Cedar St Seattle Wa Wiring for new mixed use bldg including 16 amp & 10 amp services, lv tel tv & security; bldg permit 6124652. 12 7 11 jcb; revisions submitted for the emergency distribution, no change in job value. Permit type: Electrical | Permit status: Permit closed | Completion date: March 14, 2012 | Expiration date: March 4, 2012 | Current use: Commercial | Permit id: 6270495 | |||||
SCORE 100 1 4th Ave N Seattle Wa Power, lights, etc for new data center in existing suite 05 24 06 ama - recd revised sets - change value from 15k 07 06 06 ama - revise fuse box bus plug to tap box Permit type: Electrical | Permit status: Permit finaled | Completion date: September 6, 2006 | Expiration date: May 17, 2007 | Current use: Commercial | Permit id: 6096528 | |||||
SCORE 100 809 Olive Way Seattle Wa Complete electrical installation 4 15 09 bew revision submitted 7 16 09 jnl - about to expire letter sent Permit type: Electrical | Permit status: Permit closed | Completion date: July 21, 2009 | Expiration date: August 14, 2009 | Current use: Commercial | Permit id: 6139196 | |||||
SCORE 100 809 Olive Way Seattle Wa Provide 1000a temp pwr to construction for crane, dirt conveyor, dual macar lift, temp pwr, etc. Ref: construction permit 60843501 24 08 qn - about to expire letter sent. Permit type: Electrical | Permit status: Permit closed | Completion date: January 22, 2009 | Expiration date: March 5, 2009 | Current use: Commercial | Permit id: 6124469 | |||||
SCORE 100 3 3rd Ave W Seattle Wa 8 amp temp power for new apt bldg; reference 6133095. 9/17/20 bew revision to size of equipment. 11/2/ mvc: revision. 1/31/11 jcb; revisions submitted, no change in job value. Permit type: Electrical | Permit status: Permit closed | Completion date: February 11, 2011 | Expiration date: July 30, 2011 | Current use: Multifamily | Permit id: 6254371 | |||||
SCORE 100 5105 25th Ave Ne Seattle Wa Cancel per customer log 10-35 200a feeder, 200a 480v panel, 75kva trans.,200a 120 208 panel Date: July 8, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: July 8, 2010 | Current use: Commercial | Permit id: 6220806 | |||||
SCORE 100 25 Aurora Ave N Seattle Wa Underground conduit installation 7 13 06 mg this is a "get started" to include service & feeder conduits Date: July 12, 2006 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: October 12, 2006 | Expiration date: July 12, 2007 | Current use: Commercial | Permit id: 6105482 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Complete electrical install for mixed use assisted living & apt bldg w retail. Scope of work includes line & low voltage wiring. 12 8 08 jnl - about to expire letter sent Permit type: Electrical | Permit status: Permit closed | Completion date: March 18, 2009 | Expiration date: January 11, 2009 | Current use: Multifamily | Permit id: 6151082 | |||||
SCORE 100 809 Olive Way Seattle Wa Installing f a system for new multi-family high rise bldg 02-18-2009 fmh about to expire letter sent. Date: October 17, 2007 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 11, 2009 | Expiration date: August 17, 2009 | Current use: Commercial | Permit id: 6141429 | |||||
SCORE 100 Date: April 8, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2011 | Expiration date: June 8, 2011 | Current use: Commercial | Permit id: 6279658 | |||||
SCORE 100 Date: April 8, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 7, 2011 | Expiration date: April 8, 2012 | Current use: Commercial | Permit id: 6275059 | |||||
SCORE 100 9 Poplar Pl S Seattle Wa Ti of construction office. 1 6 12 jcb; permit converted to plan review, job over 25 sq ft. Permit type: Electrical | Permit status: Permit closed | Completion date: January 31, 2012 | Expiration date: December 13, 2012 | Current use: Commercial | Permit id: 6305096 | |||||
SCORE 100 5115 25th Ave Ne Seattle Wa Lighting and power for a small multi-purpose room. 5 3 jnl - about to expire letter sent Date: June 1, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: June 1, 2010 | Expiration date: June 1, 2010 | Current use: Commercial | Permit id: 6217545 | |||||
SCORE 100 25 Aurora Ave N Seattle Wa Phase 1 of 2 - construction of new 6-story, (49) unit mixed use bldg w surface & underground parking shoring & excavation only. Ref #24066809 13 07 mvc: renew. Permit type: Electrical | Permit status: Permit finaled | Completion date: June 16, 2008 | Expiration date: September 8, 2008 | Current use: Commercial | Permit id: 6103903 | |||||
SCORE 100 311 Cedar St Seattle Wa Get started pending plan review under ap# 6270495 authorized by tim r for u g walls & deck concrete embed & ufer grounding. 2 28 11 ter extended an additional days this includes fire pump conduits encased in concrete. Date: January 25, 2011 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 14, 2011 | Expiration date: March 25, 2011 | Current use: Commercial | Permit id: 6272812 | |||||
SCORE 100 422 Yale Ave N Seattle Wa Installation of (2) new wall packs and replacement of (6) existing wall packs for rooftop lighting Date: April 6, 2017 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit issued | Expiration date: April 6, 2018 | Current use: Commercial | Permit id: 6590492 | |||||
SCORE 100 2201 S Jackson St Seattle Wa Installing undergrounds for service & distribution. 12/20/02 jgh: review valuation change. Wire building #2 including underground service laterals to bldg 1, 2 & 3. Permit type: Electrical | Permit status: Permit finaled | Completion date: February 5, 2004 | Expiration date: January 22, 2004 | Current use: Commercial | Permit id: 6008247 | |||||
SCORE 100 805 4th Ave N Seattle Wa Install l v wiring (2)controlers (34)devices 2 20 07 jnl - about to expire letter sent Date: March 27, 2006 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: April 19, 2007 | Expiration date: March 27, 2007 | Current use: Commercial | Permit id: 6092710 | |||||
SCORE 100 Date: March 18, 2003 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: March 20, 2003 | Expiration date: March 18, 2004 | Current use: Multifamily | Permit id: 6012538 | |||||
SCORE 100 Date: April 15, 2003 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: May 15, 2003 | Expiration date: April 15, 2004 | Current use: Commercial | Permit id: 6013907 | |||||
SCORE 100 Date: June 25, 2003 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: May 10, 2004 | Expiration date: June 25, 2004 | Current use: Multifamily | Permit id: 6016722 | |||||
SCORE 100 9002 Lake City Way Ne Seattle Wa Temp power for construction of assist living facility; bldg permit 746061. 4/6/05 mgc - address correction from 9001 lake city wy ne, temporary trailor under sdot permit #z0932. Date: January 6, 2005 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: April 8, 2005 | Expiration date: January 6, 2006 | Current use: Commercial | Permit id: 6049542 | |||||
SCORE 100 Date: January 18, 2005 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: January 27, 2005 | Expiration date: January 18, 2006 | Current use: Commercial | Permit id: 6050186 | |||||
SCORE 100 Date: May 23, 2005 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: July 28, 2005 | Expiration date: May 23, 2006 | Current use: Institutional | Permit id: 6058360 | |||||
SCORE 100 24 Birch Ave N Seattle Wa Phase 2 of 2 - construction of (5) 3-story condo towers for (43) units w/common underground parking/architectural & structural. Ref - #2407917 bldg l3. 8/10/07me-about to expire letter sent. Contact: 940-5407. 9/12/08 bew renewal Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2008 | Expiration date: September 15, 2009 | Current use: Commercial | Permit id: 6103901 | |||||
SCORE 100 Date: June 3, 2008 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: June 5, 2008 | Expiration date: June 3, 2009 | Current use: Commercial | Permit id: 6123450 | |||||
SCORE 100 24 Birch Ave N Seattle Wa Complete f/a installation for new multi-family residential building (building l3) Date: June 3, 2008 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: September 18, 2008 | Expiration date: June 3, 2009 | Current use: Multifamily | Permit id: 6131946 | |||||
SCORE 100 809 Olive Way Seattle Wa Day get started permit: to include first (2) levels grounding, fire pump conduits & misc. Branch circuits conduits - ok by gibbs extended additional days tr 5/11/07; 06/11/07 ama - extended days extended additional days tr 8/8/07 Date: April 11, 2007 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: September 24, 2007 | Expiration date: September 11, 2007 | Current use: Commercial | Permit id: 6135500 | |||||
SCORE 100 809 Olive Way Seattle Wa Day get started for fire alarm: garage slab only. 5/31/07 bew extended days per mark gibbs slab on various levels Date: May 2, 2007 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: December 26, 2007 | Expiration date: October 2, 2007 | Current use: Commercial | Permit id: 6137938 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Day get started permit; u/g conduit in slab. Reference plans 6151082. 11/8/07 bew extended (1) week. 11/8/07 tr extended (3) weeks. 12/7/07 bew extended. 1/4/08 jsbm - extend (1) week only per tim rasmussen Date: October 9, 2007 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit finaled | Completion date: January 11, 2008 | Expiration date: January 15, 2008 | Current use: Multifamily | Permit id: 6156703 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Install (1) 200a 480v 3 phase to 120/208v 200a 3phase sub panel and transformer. Date: July 8, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 31, 2009 | Expiration date: July 8, 2010 | Current use: Commercial | Permit id: 6220795 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Day get started for branch circuits only; reference plans 6233266 permit extended to 1/16/09 rrj Date: November 16, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 17, 2009 | Expiration date: January 16, 2010 | Current use: Commercial | Permit id: 6233267 | |||||
SCORE 100 Date: November 16, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 30, 2009 | Expiration date: November 16, 2010 | Current use: Commercial | Permit id: 6233268 | |||||
SCORE 100 Date: November 16, 2009 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2009 | Expiration date: November 16, 2010 | Current use: Commercial | Permit id: 6233265 | |||||
SCORE 100 5101 25th Ave Ne Seattle Wa Installing complete manual and automatic f/a system for new mixed use bldg; bldg permit 6121646 Date: May 23, 2008 Contractor: Unity Electric Lp Permit type: Electrical | Permit status: Permit closed | Completion date: March 5, 2009 | Expiration date: May 23, 2009 | Current use: Commercial | Permit id: 6178366 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Install new temp 277 480v service. Extend feeders to tower crane (4) de-watering pumps concrete placing boom and (3) step-down transformer modules to distribute 120 20 power to jobsite. Applicant: Sean Packer | Permit type: Electrical - otc | Permit id: Elec-2013-07903 | Parcel: 6719700055 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Mixed use electrical- complete electrical installation for a 208 unit multi-family retail building including all low voltage work. 8 feeder 1 fire alarm 1 ground ufer 1 low voltage 1 service-new and 6 subpanels. Applicant: Robert Portillo | Permit type: Electrical plan review | Permit id: Elec-2013-09235 | Parcel: 6719700055 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Sopa the luke- jim 206-910-3704 install alter (1) circuit for electric strike and card reader on exterior door in fitness area. Alter (1) lighting circuit and install 12 led lights at elevator lobby and relocate (1) exit sign at p1 and relocate. Customer paid for:(2) low voltage (2) new circuit Applicant: Tom Zaragoza | Permit type: Electrical - otc | Permit id: Elec-2015-02559 | Parcel: 6719700055 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Sopa the luke- gym 206-271-4906 alter (2) 120v circuits. Install (3) coaxial tv cables and (3) receptacles for new tvs. Customer paid for:(3) low voltage Applicant: Tom Zaragoza | Permit type: Electrical - otc | Permit id: Elec-2015-02887 | Parcel: 6719700055 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Sopa the luke l2 & l5 253-377-7575 add (1) new 25amp 240v circuit from l5 electric room to hvac roof top unit. Install control wire from roof top unit down to head unit in idf room on l2. Customer paid for:(1) new circuit Applicant: Tom Zaragoza | Permit type: Electrical - otc | Permit id: Elec-2015-02377 | Parcel: 6719700055 | |||||
SCORE 100 14727 Ne 87th St Redmond, Wa 98052 Immersion services- altered circuits required for reconditioning of ti space. Applicant: Troy Wallin | Permit type: Electrical - otc | Permit id: Elec-2015-04891 | Parcel: 7201000020 | |||||
SCORE 100 8935 160th Ave Ne Redmond, Wa 98052 Avalon redmond place - bldg e - floor 1 2 and 3 - add (1) light on each floor at the elevators of building a extending the existing lighting circuit to the new fixture. Total of (3) altered circuits. Applicant: Steve Reding | Permit type: Electrical - otc | Permit id: Elec-2016-05239 | Parcel: 225059093 | |||||
SCORE 100 8935 160th Ave Ne Redmond, Wa 98052 Avalon redmond place - bldg a - floor 1 2 and 3 - add (1) light on each floor at the elevators of building a extending the existing lighting circuit to the new fixture. Total of (3) altered circuits. Applicant: Steve Reding | Permit type: Electrical - otc | Permit id: Elec-2016-05237 | Parcel: 225059093 | |||||
SCORE 100 15817 Ne 90th St Redmond, Wa 98052 Avalon redmond place - bldg f - floor 1 2 and 3 - add (1) light on each floor at the elevators of building a extending the existing lighting circuit to the new fixture. Total of (3) altered circuits. Applicant: Steve Reding | Permit type: Electrical - otc | Permit id: Elec-2016-05241 | Parcel: 225059093 | |||||
SCORE 100 82 164th Ave Ne Redmond, Wa 98052 Valley furniture redmond central - complete fire alarm installation for a 208 unit multi-family retail building. Date: February 10, 2014 Contractor: Unity Electric Lp Applicant: Robert Portillo | Permit type: Fire alarm | Permit id: Fire-2013-11943 | Parcel: 6719700035 |